USPTO serial 79064267
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Heather Kliebenstein
Heather Kliebenstein MERCHANT & GOULD P.C.P.O. Box 2910Minneapolis, MN 55402-0910UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, apparatus and machines tools for use in the building industry, road works and foundation fillings, namely, drilling rigs, piling rigs, cranes, crane attachment rigs, namely, drilling rigs that are attached to cranes, tunneling equipment, namely, drilling rigs featuring drill guides used for digging deep holes and tunnels, high-pressure concrete and grout pumps, hydraulic grapple buckets for attachments for vehicles for deep-foundation walls and diaphragm excavations, continuous helix excavating machines, machines for mechanical consolidation and mixing, machines for drilling and installing micropoles, injection moulding machines; machines for mixing and recuperating bentonitic or similar mixtures; machines for draining soil, electric pressure pumps for mud and concrete mixtures, and power and hydraulic drilling accessories, namely, casing oscillators, extractors, electric and hydraulic vibrators used for driving and extracting sheetpiles and beams; machines for the geologic and geognostic survey in ground research, namely, drilling machines and excavating machines; and drilling machines for wells and shafts | ACTIVE | — |
| 009 | Electrical and electronic controllers for construction and excavation equipment, wireless controllers to monitor and control the functioning of other electronic devices, and concrete testing machines, automatic pressure control machines and instruments for monitoring and recording of data, all in connection with machines, apparatus and machines tools for use in the building industry, road works and foundation fillings; and apparatus for recording and processing data received from machines, equipment and machine tools for the purpose of geologic and geognostic surveying in ground research | ACTIVE | — |
| 037 | Building construction services; building repair and maintenance; installation services of building scaffolds, working and building platforms | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 10, 2021 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Mar 10, 2021 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Mar 10, 2021 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 10, 2021 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 17, 2019 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Aug 10, 2018 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Aug 26, 2016 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Aug 26, 2016 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Aug 22, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 18, 2016 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Feb 12, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 13, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 13, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 17, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 17, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 30, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 15, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 15, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 1, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 12, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 23, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 23, 2010 | ALIE | ASSIGNED TO LIE | — |
| Apr 8, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 23, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 19, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 19, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 19, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 28, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 28, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 28, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 28, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 27, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 3, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 3, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 2, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 1, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 17, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 13, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 13, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 12, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |