USPTO serial 79064486
BW
Reviewed by CopyMark Law Group
Reg. 3680035Status 706Registered
- Filing date
- Status date
- Registration date
- Sep 8, 2009
- Examiner
- SETTLES LEWIS, SHAILA E
- Law office
- GENERIC WEB UPDATE
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with BW?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John H. Weber
JOHN H. WEBER BAKER & HOSTETLER LLP1050 CONNECTICUT AVENUE N.W.WASHINGTON SQUARE, SUITE 1100WASHINGTON, DC 20036Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and machine tools and structural parts therefor for soil, asphalt and waste compaction for use in the construction industry, namely, traffic area construction, airfield construction, railway construction, embankment dam construction, landfill construction, pipeline and channel construction, asphalt construction, earth moving, hydraulic engineering, construction of tips, mining and road demolition; machines and machine tools and structural parts therefor for use in road repair, namely, crushers, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilizers, binding agent and grit spreaders; compactors and structural parts therefor for use with soil, asphalt and waste, namely, rollers, tampers and vibrating plates; machines, equipment and structural parts therefor for use in horizontal and vertical conveying of construction materials, namely, conveyor belts, slides, hoists and lifts | ACTIVE | — |
| 037 | [ Repair, maintenance, servicing and rental of machines, tools, equipment, manually operated tools and equipment, all for use in construction, road construction, airfield construction, railway construction, embankment dam construction, pipeline and channel construction, landfill construction, asphalt construction, earth moving and mining, hydraulic engineering, landfill construction and waste compaction ] | SECTION 71 - CANCELLED | — |
| 042 | [ Engineering; technical consulting in the field of engineering; scientific and industrial research in the fields of machines, machine tools and equipment and parts therefor for use in construction, traffic area construction, airfield construction, railway construction, embankment dam construction, landfill construction, asphalt construction, earth moving, hydraulic engineering, construction of tips and mining, scientific and industrial research in the fields of road demolition and road repair, namely, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilizers, binding agent and grit spreaders and parts therefor; scientific and industrial research in the field of compactors and parts therefor for use with soil, asphalt and waste, namely, rollers, tampers and vibrating plates; scientific and industrial research in the field of machines and equipment and structural parts therefor for the horizontal and vertical conveying of construction materials, namely, conveyor belts, slides, hoists and lifts ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BOMAG GmbH
- Other trademarks owned by BOMAG GmbH
- Other trademarks owned by BOMAG GmbH
- Other trademarks in Class 007
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named BW
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 21, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 12, 2020 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| May 6, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 6, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 6, 2019 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Aug 16, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 8, 2018 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Oct 5, 2017 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 5, 2016 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 10, 2016 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 10, 2016 | INPC | INVALIDATION PROCESSED | — |
| Nov 30, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 30, 2015 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Mar 30, 2015 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Mar 27, 2015 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 19, 2015 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Oct 6, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 27, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 14, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 14, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 9, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 8, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 23, 2009 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 3, 2009 | NPUB | NOTICE OF PUBLICATION | — |
| May 20, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 20, 2009 | ALIE | ASSIGNED TO LIE | — |
| May 20, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 20, 2009 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 20, 2009 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 20, 2009 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 20, 2009 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 5, 2009 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 5, 2009 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 27, 2009 | RFNP | REFUSAL PROCESSED BY IB | — |
| Mar 9, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 9, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 6, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 5, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 26, 2009 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Feb 25, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 24, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 21, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 17, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 17, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 13, 2009 | LIMS | LIMITATION OF GOODS/SERVICES FROM IB ENTERED | — |
| Feb 12, 2009 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |