Drawing for MX GROUP

USPTO serial 79064909

MX GROUP

Reviewed by CopyMark Law Group

Reg. 3818468Status 404
Filing date
Status date
Registration date
Jul 13, 2010
Examiner
BELL, MARLENE D
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MX GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Electric control and command apparatus and instruments, namely, electrical protection switches, electrical controlling devices, contactors, electrical transformers, electrical relays, fuses, control panel, distribution control panels, namely, electric distribution consoles, power center, namely, power controllers, medium voltage control panel, overvoltage drains, namely, voltage surge protectors, current transformers, interface protections, namely, protection relays, system integrator, namely, integrated circuits; apparatus and instruments for recording, transmission or reproduction of sound or images; electric and electronic burglar alarms and alarm installations; telephone, door phone and video door phone installations, namely, outdoor boxes, electrical feeders, outdoor and indoor cameras, monitors, call centers, namely, telephone call routers, telephone units, namely, telephones, modems, radio transmitters, battery chargers, multipair cables, system integrator, namely, integrated circuits; photovoltaic installations, namely, stainless steel structures, namely, photovoltaic cells, aluminum structures, namely, photovoltaic cells, photovoltaic modules and panels, electrical cables, electric control panel, monophase inverters, three-phase inverters, battery pack systems, namely, solar recharging battery pack for digital cameras, system integrator, namely, integrated circuits, apparatus and instruments, namely, datalogger, namely, electronic datalogger which measures, stores and displays temperature and relative humidity data, and analyzes the impact on material decay rates, energy analyzers, energy counters, I/O analog modules, namely, electronic A/D converters and electronic D/A converters to directly interface analog signals, I/O digital modules, namely, digital INPUT/OUTPUT modules to interface with on/off sensors, pushbuttons and limit switches; on/off electric actuators for motor starters, pilot lights on/off electric actuators, and electric annunciators, sensors, namely, pressure sensors, multifunction indicators, namely, pressure and temperature indicators, network analyzers, power converters, anemometers, thermometers, electrical transducers, solar irradiation sensors; photovoltaic cells; fibre optic cable installations, namely, monomode fiber optic cable, multimode fiber optic cable, pipes, cabletrays, optical connections, namely, fiber optic connectors, data racks, namely, network cabling framework, namely, electric network cable and a mounting rack for computer and telecommunications hardware, communication hubs, telecommunications switches, routers for telecommunications; computer hardware, data transmission, namely, datalogger, namely, electronic data recorders over time or in relation to location either with a built in instrument or sensor or via external instruments and sensorschannel generators, namely, multiplexer and demultiplexer, acquisition systems, namely, wireless data transponder, serial communication data transponder, USB data transponder, circuit boards, namely, data acquisition plug-in boards, circuit boards, namely, single ended data acquisition boards, circuit boards, namely, differential data acquisition boards, circuit boards, namely, single ended and differential data acquisition boards, communication and interface ports, namely, data access port for use with electrical control panels for connecting multiple data and electrical devices, communication converters, measurement converters, Ethernet/internet modules, namely, integrated circuit modules, Internet servers, data storage systems, namely, computer hardware for high-speed processing and storage of data using multiple CPU's, cables and fibers for transmission of sound and images, multimedia installations, namely, computer workstations comprising computer hardware, liquid crystal displays, monitors, LCD panelsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 21, 2019UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Aug 2, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Aug 2, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 17, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 25, 2017INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 25, 2017INPCINVALIDATION PROCESSED—
Oct 17, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 17, 2017C71TCANCELLED SECTION 71—
Jan 21, 2016WOAGWITHDRAWAL OF ATTORNEY GRANTED—
Jan 21, 2016WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED—
Feb 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 15, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 12, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 27, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 27, 2010FIMPFINAL DISPOSITION PROCESSED—
Oct 13, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 13, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 27, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 27, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 22, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 2, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Mar 2, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 2, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 2, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 22, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Sep 2, 2009GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 2, 2009GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 2, 2009CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 11, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 11, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 10, 2009ALIEASSIGNED TO LIE—
Jul 23, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 23, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 17, 2009RFNTREFUSAL PROCESSED BY IB—
Mar 25, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 25, 2009RFRRREFUSAL PROCESSED BY MPU—
Mar 25, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 24, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 18, 2009DOCKASSIGNED TO EXAMINER—
Mar 3, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 27, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 26, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance