Drawing for M&C

USPTO serial 79065138

M&C

Reviewed by CopyMark Law Group

Reg. 3793219Status 706Registered
Filing date
Status date
Registration date
May 25, 2010
Examiner
BIBB, SCOTT
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with M&C?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michael A. Jaffe

Michael A. Jaffe RENNER, OTTO, BOISSELLE & SKLAR, LLP1621 Euclid Ave.Floor 19Cleveland, OH 44115

Goods and services

ClassDescriptionStatusFirst use
007pumps, namely, diaphragm pumps, compressed-air pumps, vacuum pumps, gas conveyance pumps, flexible-tube pumps, all as parts of machines or motors; pump diaphragms; valves, pressure valves and pressure reducing valves all as components for gas preparing machines; filters, namely, suction filters, liquid filters, absorption filters all for gas preparing machines; compressors for machines, namely, for refrigerating apparatus; gas compressors for gas preparing, measuring and analyzing apparatus; parts of gas compressor coolers, namely, moistening vessels for moistening of gas in front of a gas cooler; parts of gas compressors, namely, blowers for the compression, suction and the transport of gases; compressed air machines, namely, machines for providing compressed air for gas preparing, measuring and analyzing apparatus; housings for machines and motors; gas condensers and condensate conditioning elements being parts of machines for gas preparing, namely, of condensate sump pumps, condensate separators, condensate traps, namely, condensate sumps; mechanical, pneumatic and hydraulic controlling and regulating devices for gas preparing, measuring and analyzing apparatus, namely, valves, switches and sensorsACTIVE—
009analyzing devices, not for medical purposes, namely, gas analyzers; parts of gas analyzers, namely, hanging washing bottles for keeping a constant pressure in front of a gas analyzer; scientific apparatus and instruments, namely, scientific gas analyzing apparatus and instruments; optical apparatus and instruments, namely, optical gas analyzing apparatus and instruments; physical apparatus and instruments, namely, physical gas analyzing apparatus and instruments; chemical apparatus and instruments, namely, chemical gas analyzers; weighing apparatus and instruments, namely, apparatus and instruments for weighing gases and liquids; measuring apparatus, instruments and devices, namely, apparatus, instruments and devices for measuring gases and liquids; flow meters for gases and liquids; signalling apparatus and instruments, namely, signal conditioning and communication devices for gas preparing, measuring and analyzing apparatus; controlling apparatus and instruments, namely, sensors and detectors for use in controlling the actuation and operation of gas preparing, measuring and analyzing apparatus; monitoring apparatus and instruments, namely, alarm units for monitoring gas preparing, measuring and analyzing apparatus; liquid alarm sensors for gas measuring and analyzing apparatus, namely, sensors for controlling the condensate drain-off devices in gas analyzers; diaphragms for scientific apparatus, namely, diaphragms for diaphragm pumps as parts of gas conditioners and gas analyzers; gas testing instruments, namely, gas sampling probes; gas extraction lines and pipes being parts of gas analyzing devices; thermostats; calculation machines, data processing devices and computers; electric and electronic controlling and pressure regulating devices for gas preparing, measuring and analyzing apparatusACTIVE—
011gas processing apparatus, namely, gas processing installations for the gas processing of sample gas and test gas; gas converters for treating gases; gas dilution units for the dilution of sample and test gas; gas conditioners with hanging washing bottles for the elutriation of components from a sample or test gas; gas extraction lines and pipes as parts of gas processing apparatus, namely, gas processing installations for the gas processing of sample gas and test gas; heating devices for heating gas in gas preparing, measuring and analyzing apparatus, namely, gas heaters; devices for steam generating in gas preparing, measuring and analyzing apparatus, namely, steam generators; devices for cooling, drying and the ventilation of gas in gas preparing, measuring and analyzing apparatus, namely, evaporative gas coolers, dryers for the removal of vapor from air and gases, gas ventilation apparatus and instruments; devices for water conduction in gas preparing, measuring and analyzing apparatus, namely, water condensate collectors, water condensate pipes and water condensate outlet pipes; electric gas pre-heaters for preheating sample or test gas; heat exchangers not being parts of machines; peltier coolers; evaporative gas pre-coolers for pre-cooling sample or test gas; filters for gas conditioning, namely, for gas preparing, measuring and analyzing apparatus; pre-filters for gas sampling probes; electric vaporizersACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 13, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 13, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 13, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 13, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 13, 202071AGREGISTERED-SEC.71 ACCEPTED—
Aug 31, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 11, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 19, 2020ES71TEAS SECTION 71 RECEIVED—
May 25, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 11, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 22, 2015NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jun 22, 2015C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jun 22, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 28, 2015ES75TEAS SECTION 71 & 15 RECEIVED—
May 25, 2015REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 16, 2013TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 13, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 13, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 25, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 25, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 9, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 3, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 3, 2010ALIEASSIGNED TO LIE—
Jan 11, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 9, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 9, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 9, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 19, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 15, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 14, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 14, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 14, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 10, 2009RFNTREFUSAL PROCESSED BY IB—
Mar 18, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 18, 2009RFRRREFUSAL PROCESSED BY MPU—
Mar 18, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 17, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 6, 2009DOCKASSIGNED TO EXAMINER—
Mar 6, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 5, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance