Drawing for DENIPRO

USPTO serial 79066290

DENIPRO

Reviewed by CopyMark Law Group

Reg. 3725836Status 709
Filing date
Status date
Registration date
Dec 15, 2009
Examiner
BIBB, SCOTT
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DENIPRO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert P. Michal

Robert P. Michal Carter DeLuca Farrell & Schmidt, LLP445 Broad Hollow RoadMelville, NY 11747UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006[ Storage and transportation pallets made of metal ]SECTION 71 - CANCELLED—
007[ Machines and machine components for the printing industry, namely, for mailroom technique and the further processing of printed products, namely, conveyor systems, comprised of conveyor chains and guiding devices thereof, conveyors, clamps, grippers, conveyor belts and cam chain conveyors; machines and machine components for the printing industry, namely, devices for collating printed products, devices for sorting printed products; machines for the arrangement of printed products into scaled streams and winding stations; machines for storing printed products, namely, for winding, stacking, suspending or depositing, ] machines and machine components for the conveying technique, namely, conveying installations and conveying equipment, comprised of conveyor chains and guiding devices therefore, namely, compression-resilient elements and guiding devices therefore, grippers for conveying installations, conveyers, spiral conveyors, belt conveyers, band conveyers, chain conveyors, rope conveyors; machines and machine components for transporting, commissioning, sorting and handling of objects, namely, conveying machines, carriages, grippers, conveyor belts, conveyers, buffering and storing devices, packers and palletizers; machines and machine components for conveying technique, namely, roller elements for conveyor belts, roller conveyor belts and chain conveyor belts, namely, deflection elements and deflection devices for conveyor belts, chain conveyor belts, namely, guiding devices for rollers in roller elements, namely, roller elements for a mechanical storing, conveying and deflection of moved or to be moved objects; machine parts, namely, drives for conveyor machines with roller elementsSECTION 71 - CANCELLED—
009Electronic apparatus for operating conveyor installations and conveyor equipment, for measuring and controlling quantity and quality of goods to be conveyed; computers and electronic control units for controlling the handling processes of goods to be conveyed; electronic control units for conveyor installations, computer software for controlling conveyor installations in the nature of conveyor machinery; electronic apparatus for controlling conveyor installations and conveyor equipment, for measuring and controlling quantity and quality of printed products; computers and electronic control units for controlling handling processes of printed products to be conveyedSECTION 71 - CANCELLED—
012[ Ground vehicles, namely, land vehicles, all-terrain vehicles, armored vehicles; land, all-terrain, armored vehicles for conveying and manipulating objects, in particular printed products; all aforementioned vehicles in particular with an undercarriage including roller elements ]SECTION 71 - CANCELLED—
020[ Storage and transportation pallets not made of metal ]SECTION 71 - CANCELLED—
037Repair, servicing, maintenance and installation services, all in the field of machinery and equipment for conveyor technique and processing conveyor techniqueSECTION 71 - CANCELLED—
041Training services and education services, namely, providing training, classes, workshops and seminars, all in the field of commissioning, operation, repair, servicing and maintenance of conveyor installations and processing conveyor installationsSECTION 71 - CANCELLED—
042Technical consultancy for the design of conveyor installations and installations for processing conveyor technique; development and design of installations for conveyor technique and processing conveyor technique; development and design of installations and components for conveyor technique and processing conveyor techniqueSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 28, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 14, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 18, 2021INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 17, 2021INPCINVALIDATION PROCESSED—
Oct 26, 2021INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 26, 2021C71TCANCELLED SECTION 71—
Dec 15, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Aug 30, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Feb 23, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 18, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 18, 2018INPCINVALIDATION PROCESSED—
Jan 1, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 1, 2017NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 1, 2017C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 28, 2017INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Mar 20, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 11, 2017EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Feb 21, 2017PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Jan 20, 2017EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jul 21, 2016PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Jul 20, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 14, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Oct 21, 2014CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Oct 16, 2014CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 13, 2013ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 13, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 11, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 9, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 9, 2010FIMPFINAL DISPOSITION PROCESSED—
Mar 16, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 15, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 29, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 9, 2009NPUBNOTICE OF PUBLICATION—
Aug 27, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 25, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 10, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Aug 10, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 6, 2009FAXXFAX RECEIVED—
Jul 22, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 22, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2009ALIEASSIGNED TO LIE—
Jul 7, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 7, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 7, 2009FAXXFAX RECEIVED—
May 8, 2009RFNTREFUSAL PROCESSED BY IB—
Apr 16, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 16, 2009RFRRREFUSAL PROCESSED BY MPU—
Apr 16, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 15, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 3, 2009DOCKASSIGNED TO EXAMINER—
Apr 3, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 2, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance