Drawing for FINOOX

USPTO serial 79066293

FINOOX

Reviewed by CopyMark Law Group

Reg. 3705621Status 706Registered
Filing date
Status date
Registration date
Nov 3, 2009
Examiner
BIBB, SCOTT
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with FINOOX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

JOHN P. MURTAUGH

JOHN P. MURTAUGH PEARNE & GORDON LLP1801 EAST 9TH STREET, SUITE 1200CLEVELAND, OH 44114-3108UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Condensing installations, namely, air-cooled condensers; air-cooled steam condensers, air condensers; [ steam engines; blowing machines for the compression, exhaustion and transport of gases; blowing machines; electric compressors; ] radiators for motors and engines; [ electric pumps being machines, engine parts, and machinery, electric pumps for heating installations, vacuum pumps, centrifugal pumps, lubricating pumps; regulators being parts of machines; fans for motors and engines; carburetors ; ] heat exchangers being parts of machines [ ; steam-operated power generators being parts of machines ]ACTIVE—
009[ Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking, supervising, life-saving and teaching apparatus and instruments, namely, calculating machines and data processing equipment; apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; electric and electronic apparatus and instruments, namely, sonar equipment; capacitors for use in machines; computer programs and software for use in database management, use as a spread sheet, and word processing; electrical connectors; electronic apparatus, namely, plasma display panels; work inspection mirrors, namely, reflective mirrors to prevent accidents; batteries; audio processing equipment, namely, limiters; observation instruments, namely, cameras and telescopes; self-regulating fuel pumps for service stations; integrated-circuit chips for data processing and memory storage as a component of video games software; electric installations for the remote control of industrial operations; electric wires; electric cables; electric remote-control apparatus for radios, televisions, stereos; electric igniters for igniting at a distance used in connection with ballasts to start discharge lamps; holders for electric coils; high-frequency switches; electrical inductors; electrical relays; boiler control instruments; contacts, electric; optical condensers; electrical switches; switching equipment, namely, electric switches and power switches; electronic circuits; electric distribution consoles; switchboards ]SECTION 71 - CANCELLED—
011Apparatus for [ lighting, ] heating, [ steam generating, ] refrigerating, drying, * and * ventilating [ and water supply], namely, [ lighting fixtures, heating boilers, steam generating installations, ] electric refrigerators [, clothes dryers, * and * ventilating exhaust fans, hot water tanks ] ; heat exchangers not being parts of machines, namely, lamellar heat exchangers [, plate heat exchangers, tubular heat exchangers ] ; cooling installations and machines, namely, oil coolers, evaporative air coolers, glycol recoolers, freezers; refrigeration equipment, namely, shock frosters; air recooling apparatus for cooling media; heating and air cooling apparatus and equipment for waste heat recovery, namely, heat exchangers not being parts of machines; heat pipes to cool heat producing components, namely, cooler pipes; finned tubes as parts of heating and refrigeration installations; refrigerating apparatus, namely, refrigerators; refrigerated shipping containers; evaporative air coolers for furnaces; refrigerating chambers in the nature of refrigerating machines and refrigerators; refrigeration beverage dispensing units; freezers; ice machines and apparatus; freezing machines in the nature of freezers; air-conditioning installations; air-conditioning apparatus; evaporators, namely, industrial high-performance evaporators; tubular evaporators; heat pump evaporators; heating installations, heat exchange tubes; [ air steam valves for steam heating installations; steam generating installations; electrical steam boilers not being parts of machines; steam accumulators; electrochemical gas generators; gas furnace boilers; ] gas condensers and condenser tubes other than parts of machines, namely, heat-exchanger tubes; hot-air space heaters; ventilation installations in the nature of air conditioners; [ plumbing fittings, namely, level controlling valves for use in tanks; regulating and safety accessories for gas apparatus, gas pipes and water apparatus, namely, valves for air conditioners; ] heat pumps; regenerative heat exchangers; [ heat accumulators; ] cooling installations for water in the nature of water coolers; heat pumps, ventilators in the nature of air conditioners [ ; component parts of air conditioners, namely, ventilator frames ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 8, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 29, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Sep 22, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 22, 2021INPCINVALIDATION PROCESSED—
Jun 16, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 16, 2019NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 16, 201971AGREGISTERED-SEC.71 ACCEPTED—
Oct 14, 2019EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 24, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 24, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 7, 2019PR71POST REGISTRATION ACTION MAILED - SEC.71—
May 6, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 18, 2019ES71TEAS SECTION 71 RECEIVED—
Nov 3, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 25, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 18, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 22, 2017INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 22, 2017INPCINVALIDATION PROCESSED—
Jan 9, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 9, 2016NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 9, 2016C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 9, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 28, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Mar 5, 2015ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jan 30, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 4, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 4, 2010FIMPFINAL DISPOSITION PROCESSED—
Feb 4, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 3, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 18, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 29, 2009NPUBNOTICE OF PUBLICATION—
Jul 15, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 7, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 1, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 1, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 27, 2009ALIEASSIGNED TO LIE—
May 26, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 25, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 19, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 19, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 15, 2009RFNTREFUSAL PROCESSED BY IB—
Apr 17, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 17, 2009RFRRREFUSAL PROCESSED BY MPU—
Apr 17, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 16, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 3, 2009DOCKASSIGNED TO EXAMINER—
Apr 3, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 2, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance