USPTO serial 79066334
CONVERSOL
Reviewed by CopyMark Law Group
Reg. 3860801Status 404
- Filing date
- Status date
- Registration date
- Oct 12, 2010
- Examiner
- BIBB, SCOTT
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with CONVERSOL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric motors for machines; electric generators; generators of electricity, namely, electrochemical generators, magnetohydrodynamic generators, solar-powered electricity generators, water-powered generators; turbines, in particular hydraulic turbines; compressors for machines, namely, turbocompressors for industrial robot internal combustion machines; dynamos, alternators except for land vehicles; systems for transforming electrical energy into mechanical energy, namely, fuel-powered motors and engines except for land vehicles and catalytic converters; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling any form of energy other than electrical energy, namely, fuel-powered motors and engines except for land vehicles and catalytic converters | SECTION 71 - CANCELLED | — |
| 009 | apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; equipment and instruments for conducting, switching, transforming, accumulating, regulating or controlling any form of energy other than electrical energy, including mechanical energy, namely, transformers and voltage regulators; equipment and instruments for conducting, switching, transforming, accumulating, regulating or controlling any form of renewable energy, namely, electric accumulators, electric switches, electric transformers, electric conductors, electric regulators and electric controllers for photovoltaic energy, geothermal energy, hydraulic energy, and wind energy; photovoltaic cells, photovoltaic cladding panels; cables, ducting for electric cables, transformers; electric transformers, electric switches, circuit breakers, fuses, voltage surge suppressors; electric relays; voltage regulators; electric capacitors, electric coils, electric converters and inverters; semi-conductor power elements; electric meters; batteries, electric; fuel cells; battery chargers; semiconductors; printed circuits; discharge tubes, electric, other than for lighting; electrical conductors; wires and cables for communications and energy transport; sheaths and junction sleeves for electric cables, identification wires and identification sheaths for electric wires; electric soldering apparatus; electrical wire; substations, control and command desks and panels, namely, electronic circuit boards and electronic control panels; high-voltage equipment for converting energy, namely, circuit breakers, electrical isolating switches, lightning arresters, voltage dividers, current measure dividers for inside and outside boxes within metallic cases, metal clad boxes; medium and low-voltage equipment for converting energy, namely, electric switches, electric contactors, lightning arresters, circuit breakers, fuses; transformers, electrical sockets; electrical switches; junction boxes; circuit breakers, static and rotary converters; energy converters; electric resistances; rheostats; condensers, magnets; prefabricated electrical ducts; electric conductors of all metals; thermostats; electrical relays, namely, remote-controlled relays, electric relays; systems for transforming electrical energy into mechanical energy, namely, transformers and voltage regulators | SECTION 71 - CANCELLED | — |
| 040 | production of energy, in particular electricity; transforming of natural elements, namely, sun, water, wind, into energy, namely, energy production services; consulting services, namely, provision of technical information and advice on the production of energy for third parties; consulting services, namely, provision of technical information and advise regarding the operation of energy production facilities, namely, electricity, gas, solar, and water production installations | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by CONVERTEAM TECHNOLOGY Ltd.
- Other trademarks owned by CONVERTEAM TECHNOLOGY Ltd.
- Other trademarks owned by CONVERTEAM TECHNOLOGY Ltd.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 040
- Similar marks named CONVERSOL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 10, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Jan 10, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 23, 2018 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 29, 2018 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 29, 2018 | INPC | INVALIDATION PROCESSED | — |
| Jan 19, 2018 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 19, 2017 | C71T | CANCELLED SECTION 71 | — |
| May 13, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 17, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 13, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 13, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 12, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 12, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 18, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 2, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 2, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 27, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 7, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 24, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 24, 2010 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 24, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 24, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 24, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 16, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 16, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 16, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jun 4, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 10, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 10, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 31, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2009 | ALIE | ASSIGNED TO LIE | — |
| Oct 20, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 15, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 20, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 20, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 18, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 17, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 7, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 3, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 3, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 2, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |