Drawing for BMP

USPTO serial 79066426

BMP

Reviewed by CopyMark Law Group

Reg. 3734467Status 706Registered
Filing date
Status date
Registration date
Jan 5, 2010
Examiner
FLETCHER, TRACY L
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with BMP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John H. Weber

JOHN H. WEBER BAKER & HOSTETLER LLP1050 Connecticut Avenue, N.W.SUITE 1100WASHINGTON, DC 20036

Goods and services

ClassDescriptionStatusFirst use
007Construction industry machines and machine tools and structural parts therefor for use in traffic area construction, airfield construction, railway construction, embankment dam construction, landfill construction, pipeline and channel construction, asphalt construction, earth-moving, hydraulic engineering, construction of tips, and mining and road demolition, namely, machines and machine tools and structural parts therefor for use in road repair, namely, crushers, road millers, road surface breakers, road finishers, asphalt finishers pavers, road topping recyclers, ground stabilizers, binding agent and grit spreaders; compactors and structural parts therefor for use with soil, asphalt and waste, namely, rollers, tampers, and vibrating plates; machines, equipment and structural parts therefor for use in horizontal and vertical conveying of construction materials, namely, conveyor belts, slide conveyors, hoists and hydraulic lift tablesACTIVE—
037[ Repair, maintenance, servicing and rental of machines, tools, equipment, manually operated tools and equipment for use in construction, road construction, airfield construction, railway construction, embankment dam construction, pipeline and channel construction, landfill construction, asphalt construction, earth-moving and mining, hydraulic engineering, landfill construction and waste compaction ]SECTION 71 - CANCELLED—
042[ Engineering; technical consulting in the field of engineering; scientific and industrial research in the field of machines, machine tools and equipment and parts therefor for use in construction, traffic area construction, airfield construction, railway construction, embankment dam construction, landfill construction, asphalt construction, earth moving, hydraulic engineering, construction of tips and mining, scientific and industrial research in the fields of road demolition and road repair, namely, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilizers, binding agent and grit spreaders and parts therefor; scientific and industrial research in the field of compactors and parts therefor for use with soil, asphalt and waste, namely, rollers, tampers and vibrating plates; scientific and industrial research in the field of machines and equipment and structural parts therefor for the horizontal and vertical conveying of construction materials, namely, conveyor belts, slides, hoists and lifts ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 20, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 23, 2021INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Sep 7, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 7, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jan 7, 202071AGREGISTERED-SEC.71 ACCEPTED—
Jan 7, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 30, 2019ES71TEAS SECTION 71 RECEIVED—
Jan 5, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 5, 2017RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 31, 2016INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Dec 31, 2015INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 31, 2015INPCINVALIDATION PROCESSED—
Nov 5, 2015INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 5, 2015NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Mar 5, 2015C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 3, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 2, 2015ES75TEAS SECTION 71 & 15 RECEIVED—
Oct 6, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 7, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 7, 2010FIMPFINAL DISPOSITION PROCESSED—
Apr 5, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 14, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 5, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 20, 2009NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 20, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 17, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 8, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 31, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 31, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 31, 2009ALIEASSIGNED TO LIE—
Aug 20, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 29, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 30, 2009RFNTREFUSAL PROCESSED BY IB—
Apr 7, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 6, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 6, 2009RFRRREFUSAL PROCESSED BY MPU—
Apr 5, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 4, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 3, 2009DOCKASSIGNED TO EXAMINER—
Apr 3, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 2, 2009LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Apr 2, 2009SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance