Drawing for PREVISIONI: SOLE

USPTO serial 79066663

PREVISIONI: SOLE

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
WIENER, MICHAEL
Law office
TMEG LAW OFFICE 108 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PREVISIONI: SOLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for solar installations, solar modules and laminates; metal building materials; transportable buildings of metal; pipes and tubes of metalSECTION 70 - CANCELLED—
009Current inverters, charge regulators, batteries, electric cables, electric and electronic measuring and display systems for solar installations, in particular for wind strength, temperature, output and energy; all the aforesaid goods relating to solar energy; photovoltaic installations being individual units, and components therefor, in particular solar modules of sizilium or other semiconductorsSECTION 70 - CANCELLED—
011Solar installations for generating electrical or thermal energy from the sun's rays, and parts therefor; thermal solar collectors; all the aforesaid goods relating to solar energy; solar cookers, heat pumps, heat recovery systems, heat accumulators, heat exchangersSECTION 70 - CANCELLED—
019Mounting poles, not of metal; reinforcing materials, not of metal, for building; asphalt; joists, not of metal; huts; building timber and structural timber; building materials, not of metal; buildings, not of metal; concrete; concrete building elements; bituminous products for building; roof coverings, not of metal; building cardboard (asphalted); tiles, not of metal; scantlings (carpentry); roofs, not of metal, with integrated solar cells; drain pipes, not of metal; refractory materials; scaffolding, not of metal; xylolith; gravel; artificial stone; posts, not of metal; rigid pipes, not of metal, for building; props, not of metal; posts, not of metal, for electric power lines; tanks of masonry; framework, not of metal, for buildingSECTION 70 - CANCELLED—
035Advertising; business management; business administration; office functions; business management preparation of building projects and construction work, in particular for energy recovery installations; business organisation consultancy; organisational project management; management of energy recovery projects in the planning and start-up phase, as well as during the implementation phaseSECTION 70 - CANCELLED—
036Insurance; financial affairs; monetary affairs; real estate affairs; financial management services in the field of building construction and building projects; development of use concepts from a financial viewpoint; real estate management; financial management of facilities, namely management of buildings and installations of all kindsSECTION 70 - CANCELLED—
037Building construction; repair of construction machines, construction equipment and water vehicles; installation services, namely process technology installations for environmental technology; construction information; building construction supervision; building construction monitoring; building construction, namely implementation of building projects; building construction, civil engineering; building construction supervisionSECTION 70 - CANCELLED—
042Architectural consultancy; architecture, surveying, geological surveys; surveying, research and development for others, technical project studies; building construction, namely technical preparation of building projects; engineering drawing; technical measuring and testing laboratory services; construction drafting; physics (research); environmental impact assessmentsSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 24, 2019DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Aug 23, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
May 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 22, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 13, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 11, 2010FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 22, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 22, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 24, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 9, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 9, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 23, 2009MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 22, 2009ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 15, 2009RFNTREFUSAL PROCESSED BY IB—
Apr 21, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 21, 2009RFRRREFUSAL PROCESSED BY MPU—
Apr 21, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 20, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 10, 2009DOCKASSIGNED TO EXAMINER—
Apr 10, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 9, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance