USPTO serial 79067202
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electric and non-electric apparatus and instruments for measuring, signalling, industrial process measurement and control in the field of heating, ventilating and air-conditioning apparatus and installations built thereof, specifically excluding the fields of consumption of water, gas and electricity and locating gas leakage, namely, flow meters and gas detectors; computer programs and software for controlling, ventilating and air-conditioning apparatus; computers; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity in the field of heating, ventilating and air conditioning apparatus and installations built thereof, specifically excluding integrated circuits, namely, microchips | SECTION 71 - CANCELLED | — |
| 011 | Heating, ventilating and air-conditioning apparatus and installations built thereof as well as their essential characteristic parts, namely, air distributors, ventilators, exhaust fans and ventilating fans, hot air blowers, coil heaters, air coolers, gas condensers, air conditioners, heat accumulators, heat recuperators, heat exchangers, pipes for conducting exhaust air and ventilating, air valves, namely, ventilating flaps, and air diffusers; heat pumps, solar collectors, solar accumulators | SECTION 71 - CANCELLED | — |
| 017 | Semi-processed plastic substances, in particular for use in heating, ventilating and air-conditioning apparatus and installations built thereof, namely, semi-processed plastic in the form of films, sheets, tubes, bars, and rods; packing and insulating materials for heating, ventilating and air-conditioning apparatus and installations built thereof; stopping materials in the nature of fire-stopping material, water-stopping material and gas-stopping material, namely, silicon caulking; non-metal flexible pipes for heating, ventilating and air-conditioning apparatus and installations built thereof | SECTION 71 - CANCELLED | — |
| 019 | non-metal building materials, namely, asphalted felt for building and insulated glass; rigid pipes, not of metal, in particular for heating, ventilating and air-conditioning apparatus and installations built thereof | SECTION 71 - CANCELLED | — |
| 037 | Construction consultation; Construction, repair and installation services, in particular in the field of heating, ventilating and air-conditioning installations in buildings; retrofitting of heating, ventilating and air-conditioning installations in buildings | SECTION 71 - CANCELLED | — |
| 042 | Construction drafting and drafting consultation in the fields of heating, ventilating and air-conditioning apparatus and installations built thereof | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 29, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Aug 29, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 6, 2018 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 12, 2018 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 12, 2018 | INPC | INVALIDATION PROCESSED | — |
| Feb 28, 2018 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 30, 2017 | C71T | CANCELLED SECTION 71 | — |
| Jul 16, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 26, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 24, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 24, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 23, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 23, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 16, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 30, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 30, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 7, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 18, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 2, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 2, 2010 | ALIE | ASSIGNED TO LIE | — |
| Jul 20, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 29, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 29, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 29, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 30, 2009 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 29, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 25, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 25, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 25, 2009 | ALIE | ASSIGNED TO LIE | — |
| Nov 13, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 12, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 14, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 14, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 13, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 12, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 6, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| May 5, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 1, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 30, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |