Drawing for E-CONTROL

USPTO serial 79067644

E-CONTROL

Reviewed by CopyMark Law Group

Reg. 3867528Status 404
Filing date
Status date
Registration date
Oct 26, 2010
Examiner
STRUCK, ROBERT J
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with E-CONTROL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Motors and engines except for land vehicles; generators of electricity; turbines; windmills; solar, water and/or wind powered electricity generators; solar electric, hydroelectric and wind installations for use in providing power to commercial, residential and industrial premises, namely, electricity generators; structural parts and fittings for all the aforesaid goodsSECTION 71 - CANCELLED
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; electrical and electronic apparatus and equipment, all for use in generating and distributing solar electricity and for distributing energy obtained from alternative energy sources, namely, solar cells and solar panels for production of electricity; electrical and electronic control devices for energy management; software for managing energy and power needs; fuel cells; power cables; photovoltaic cells and modules; photovoltaic apparatus and installations for generating solar electricity; photovoltaic solar electric installations for use in electrification, lighting and/or water heating; electrical cells and batteries; integrated circuits; light conducting filaments; printed circuits; solar batteries; computer software for regulation, storage, control and distribution of power and energy in the generation and distribution of electricity and other forms of power and energy; downloadable electronic publications in the nature of magazines, newsletters, books and manuals on the subjects of alternative energy and managing energy and power needs; solar cells; photovoltaic solar modules; photosensors; calibrated photovoltaic reference cells; ampere-hour meters; electrical charge controllers, voltage regulators and monitors; structural parts and fittings for all the aforesaid goodsSECTION 71 - CANCELLED
037Installation, construction, maintenance, servicing and repair of energy and power generating apparatus, equipment and installations; installation of photovoltaic systemsSECTION 71 - CANCELLED
040Generation of power and electricity; production of energy from solar, water and wind power sources; professional consultancy services relating to generation of power and energySECTION 71 - CANCELLED
042Research and development and consultation related thereto in the field of alternative energy; industrial analysis and research on alternative energy; design and development of computer hardware and software; design and development of alternative energy power systems, apparatus, installations and components; design and development of energy and power management systems; conducting of feasibility studies relating to power and energy needs of others and generation of supply of power and energy; technical design and technical planning, and technical consulting relating thereto, in the field of solar energy systems and installations, wind energy systems and installations, hydroelectric energy systems and installations, photovoltaic installations; computer software consultancy; design and development of environment-friendly forms of energy and power; technical and scientific research services in the field of alternative energySECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 24, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED
Jan 24, 2019DETHDEATH OF INTERNATIONAL REGISTRATION
Mar 9, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB
Feb 7, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB
Feb 7, 2018XXCRGENERIC MADRID TRANSACTION CREATED
Feb 2, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Jun 2, 2017C71TCANCELLED SECTION 71
Feb 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jan 23, 2012WOAGWITHDRAWAL OF ATTORNEY GRANTED
Jan 23, 2012WOARTEAS WITHDRAWAL OF ATTORNEY RECEIVED
Feb 7, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 7, 2011FIMPFINAL DISPOSITION PROCESSED
Jan 26, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Nov 1, 2010OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Oct 26, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 14, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 14, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Aug 10, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Aug 10, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 6, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Jul 6, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jul 6, 2010XAECEXAMINER'S AMENDMENT ENTERED
Jul 6, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 6, 2010GNEAEXAMINERS AMENDMENT E-MAILED
Jul 6, 2010CNEAEXAMINERS AMENDMENT -WRITTEN
Jul 6, 2010XAECEXAMINER'S AMENDMENT ENTERED
Jul 6, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Jul 6, 2010GNEAEXAMINERS AMENDMENT E-MAILED
Jul 6, 2010CNEAEXAMINERS AMENDMENT -WRITTEN
Jan 6, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Jan 6, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 6, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 14, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 14, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 14, 2009ALIEASSIGNED TO LIE
Nov 25, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 1, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 1, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jun 20, 2009RFNTREFUSAL PROCESSED BY IB
May 26, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
May 26, 2009RFRRREFUSAL PROCESSED BY MPU
May 23, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
May 22, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 19, 2009MAFRAPPLICATION FILING RECEIPT MAILED
May 15, 2009DOCKASSIGNED TO EXAMINER
May 15, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
May 14, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance