Drawing for DART

USPTO serial 79069166

DART

Reviewed by CopyMark Law Group

Reg. 3889252Status 404
Filing date
Status date
Registration date
Dec 14, 2010
Examiner
HAN, DAWN L
Law office
TTAB

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with DART?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Stewart J. Bellus

STEWART J BELLUS COLLARD & ROE PC1077 NORTHERN BLVDROSLYN, NY 11576UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electrical measuring and testing devices for detecting and quenching spark formation in intrinsically safe active and passive electrical operating equipment and devices, for use in potentially explosive industrial areas, manufacturing installations and potentially explosive installations in automation technology; intrinsically safe electrical devices; apparatus and instruments, namely, especially intrinsically save power supply units consisting of power supplies, intrinsically safe electrical sensors for sensing electrical, chemical and physical measuring values; intrinsically safe electrical measuring, signalling and control apparatus and instruments, namely, electronic transmitters and receivers for fieldbus networks, ethernet repeaters and computer monitors for fieldbus networks, electric valve actuators, flow speed indicators, fire and smoke detectors, lighting controls, scales, personal computers, computer terminals, optical and acoustical signal processors, and liquid analyzers, all using technology which terminates electrical sparks before they become incendiary through changing current and voltage; intrinsically safe electrical devices apparatus and instruments, namely, electronic transmitters and receivers for fieldbus networks, ethernet repeaters and computer monitors for fieldbus networks, electric valve actuators, flow speed indicators, fire and smoke detectors, lighting controls, scales, personal computers, computer terminals, optical and acoustical signal processors, and liquid analyzers; intrinsically safe electrical devices apparatus and instruments, namely, electronic transmitters and receivers for fieldbus networks, ethernet repeaters and computer monitors for fieldbus networks, electric valve actuators, flow speed indicators, fire and smoke detectors, lighting controls, scales, personal computers, computer terminals, optical and acoustical signal processors, and liquid analyzers, all for use in potentially explosive industrial areas, manufacturing installations and potentially explosive installations in automation technologySECTION 18 - CANCELLED—
037[ Installation of electrical devices for detecting and quenching spark formation in intrinsically safe electrical devices, apparatus and instruments for use in potentially explosive industrial areas, manufacturing installations and potentially explosive installations used in automation technology; installation of electrical devices, apparatus, instruments and installations thereof containing intrinsically safe electric circuits for use in potentially explosive industrial areas, manufacturing installations and potentially explosive areas of automation technology ]SECTION 71 - CANCELLED—
042[ Design for others in the field of electrical devices for detecting and quenching spark formation in intrinsically safe electrical devices and apparatus and instruments for use in potentially explosive industrial areas, manufacturing installations and in potentially explosive installations used in automation technology; development of new technology for others in the field of electrical devices for detecting and quenching spark formation in intrinsically safe electrical devices and apparatus and instruments for use in potentially explosive industrial areas, manufacturing installations and potentially explosive installations used in automation technology; design for other in the field of electrical devices and installations thereof containing intrinsically safe electric circuits for use in potentially explosive industrial areas, manufacturing installations, and in potentially explosive areas of automation technology; development of new technology for others in the field of electrical devices and installations thereof having intrinsically safe electric circuits for use in potentially explosive industrial areas, manufacturing installations, and in potentially explosive areas of automation technology; technical inspections of electrical devices for detecting and quenching spark formation and intrinsically safe electrical circuits for third parties for the purpose of engineering certification of the intrinsic safety for use in potentially explosive areas; technical inspection of intrinsically safe devices, apparatus and instruments that conduct, switch, convert, store, regulate and control electricity; technical inspection of intrinsically safe electrical apparatus and instruments that conduct, switch, convert, store, regulate and control electricity; technical inspection of intrinsically safe electrical circuits for third parties for the purpose of certification for use in potentially explosive areas ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 7, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 29, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Aug 29, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Jul 27, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 27, 2019INPCINVALIDATION PROCESSED—
Jun 30, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 30, 2018C18.CANCELLED SECTION 18-TOTAL—
Oct 30, 2018CANTCANCELLATION TERMINATED NO. 999999—
Oct 26, 2018CANGCANCELLATION GRANTED NO. 999999—
Jul 26, 2018PETCCANCELLATION INSTITUTED NO. 999999—
Sep 21, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 9, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Apr 1, 2017INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 1, 2017INPCINVALIDATION PROCESSED—
Jan 5, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 5, 2016NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED—
May 5, 2016C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 5, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 22, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 29, 2012NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 14, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 13, 2011FIMPFINAL DISPOSITION PROCESSED—
Mar 14, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 14, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 28, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 8, 2010NPUBNOTICE OF PUBLICATION—
Aug 23, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 21, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 30, 2010CNEAEXAMINERS AMENDMENT MAILED—
Jul 29, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jul 29, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 19, 2010EXPIEX PARTE APPEAL-INSTITUTED—
Jul 19, 2010JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jul 19, 2010EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Jun 25, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 25, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 21, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 29, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 29, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 13, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 13, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 13, 2010ALIEASSIGNED TO LIE—
Dec 31, 2009TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 31, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 31, 2009ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 31, 2009REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 5, 2009CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Oct 2, 2009CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 19, 2009RFNTREFUSAL PROCESSED BY IB—
Jul 1, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 1, 2009RFRRREFUSAL PROCESSED BY MPU—
Jul 1, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 30, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 26, 2009DOCKASSIGNED TO EXAMINER—
Jun 26, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 25, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance