Drawing for ENERGY OF PROGRESS

USPTO serial 79069599

ENERGY OF PROGRESS

Reviewed by CopyMark Law Group

Reg. 3913184Status 404
Filing date
Status date
Registration date
Feb 1, 2011
Examiner
BIBB, SCOTT
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ENERGY OF PROGRESS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles; water heaters being parts of machines; alternators; current generators; generators of electricity; drain cocks; pumps for heating installations; catalytic converters; heat exchangers being parts of machines; igniting devices for internal combustion engines, namely, electronic ignitions for vehicles, coils, heating plugs; anti-pollution devices for motors and engines; motors, electric, other than for land vehicles; aerators; flues for engine boilers, namely, three-layered heat-insulated pipes made from stainless steel; dynamos; hydraulic controls for engines and motors; de-aerators for feedwater; air condensers; fittings for engine boilers; steam condensers being parts of machines; oil separator machines; boiler tubes being parts of machinesSECTION 71 - CANCELLED—
011Heating installations; water heaters, namely, heating systems and systems used in technological heating supply in industrial production; boilers, other than parts of machines for heating installations; oil and gas burners for industrial, and domestic use; electric heating apparatus for maintaining fixed temperature in rooms; ventilation and air-conditioning installations and apparatus; hot water heating installations, namely, hot water heaters; gas industrial boilers; heating boilers; faucets for pipes; taps; mixer taps for water pipes; hot air apparatus, namely, blowers; heat exchangers, not being parts of machines; chimney flues for heating boilers; steam generating installations, namely, heating systems and systems used in technological heating supply in industrial productionSECTION 71 - CANCELLED—
037Construction of modular containers for industrial use; repair of boiler and cogeneration systems, heat producing installations, electric generator installations; installation of equipment, namely, of heat and power equipment, compressors, pumps, fans, industrial ovens, electrotechnical installations, steam generating units, automation equipment and devices, computer facilities; rebuilding of industrial and gas reciprocating engines that have been worn or partially destroyed; repair information, namely, providing information on repair services in the field of energetics; construction information, namely, providing information on construction services in the field of concrete structures and concrete-steel constructions; roofing services; painting, interior and exterior; installation of doors and windows; heating equipment installation and repair; fire alarm installation and repair; freezing equipment installation and repair; electric appliance installation and repair; installation, maintenance and repair of computer hardware; machinery installation, maintenance and repair; interference suppression in electrical apparatus; boiler cleaning and repair; plumbingSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 6, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Sep 6, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 8, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 10, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 10, 2018XXCRGENERIC MADRID TRANSACTION CREATED—
May 8, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 8, 2017C71TCANCELLED SECTION 71—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 17, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 17, 2011FIMPFINAL DISPOSITION PROCESSED—
May 1, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 1, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 16, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 16, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 8, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 8, 2010ALIEASSIGNED TO LIE—
Sep 24, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 24, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Sep 24, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 24, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 24, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 10, 2010CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 8, 2010CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Feb 24, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 24, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 24, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 15, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 15, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 15, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 15, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 15, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 19, 2009RFNTREFUSAL PROCESSED BY IB—
Jul 16, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 16, 2009RFRRREFUSAL PROCESSED BY MPU—
Jul 16, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 15, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 14, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 10, 2009DOCKASSIGNED TO EXAMINER—
Jul 10, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 9, 2009LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Jul 9, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance