Drawing for BAUFRITZ

USPTO serial 79069755

BAUFRITZ

Reviewed by CopyMark Law Group

Reg. 3850166Status 404
Filing date
Status date
Registration date
Sep 21, 2010
Examiner
DUBOIS, MICHELLE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BAUFRITZ?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John Clarke Holman

John Clarke Holman Jacobson Holman PLLC400 7th St., NWWashington, DC 20004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
019Building materials, not of metal, for the construction of houses and prefabricated houses, namely, semi-worked wood, composite panels composed primarily of non-metal materials for building purposes, bricks, posts, and panels, and slabs and blocks of wood and concrete; transportable houses and buildings; transportable prefabricated houses; prefabricated building components for prefabricated houses, namely, shutters, shingles, siding, and trim; prefabricated garages and prefabricated non-metal buildings for indoor swimming; non-metal windows; non-metal doors; staircases; floor and wall coverings and balcony coverings, namely, wooden, ceramic, and stone tiles; prefabricated chimneys; roofing and roof coverings; modular summer houses; all aforementioned goods not of metal; partially machined or further processed wood, namely, beams, planks and slabs; natural and artificial stonesSECTION 71 - CANCELLED—
037Civil engineering; building repair services; building installation services, namely, building construction; erection of prefabricated houses; construction of turnkey buildings; erection of buildings on a turnkey basis; installation and erection of lighting, heating, ventilation and air conditioning installations, sanitary equipment installations, and high-voltage protection installations; plumbing work and gas and water installation, installation of electric appliances; painting, varnishing and decoration work, namely, painting and varnishing, decorative painting service, and decorative moulding installation services; application of stucco; application of plaster and casting of concrete for building construction purposes; carpentry services; roofing services; installation of insulation; repair of glass by glazing; floor and tile laying; paving contractor services; masonry services; erection of staircasesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 13, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Feb 13, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 21, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 9, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jan 17, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 17, 2018INPCINVALIDATION PROCESSED—
Dec 28, 2017INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 28, 2017C71TCANCELLED SECTION 71—
Feb 17, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 21, 2012ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 12, 2011RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 13, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 13, 2011FIMPFINAL DISPOSITION PROCESSED—
Dec 21, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 21, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 6, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 6, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 3, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 3, 2010ALIEASSIGNED TO LIE—
May 19, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 28, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 28, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 28, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 11, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 25, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 25, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2010ALIEASSIGNED TO LIE—
Jan 13, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 13, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 13, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 19, 2009RFNTREFUSAL PROCESSED BY IB—
Jul 17, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 17, 2009RFRRREFUSAL PROCESSED BY MPU—
Jul 17, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 17, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 16, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2009DOCKASSIGNED TO EXAMINER—
Jul 13, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 10, 2009LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Jul 9, 2009SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance