USPTO serial 79069940
D-RTU
Reviewed by CopyMark Law Group
Reg. 3922102Status 404
- Filing date
- Status date
- Registration date
- Feb 22, 2011
- Examiner
- OKEKE, BENJAMIN
- Law office
- —
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with D-RTU?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Elizabeth A. Cominolli
Elizabeth A. Cominolli Barclay Damon, LLP125 East Jefferson StreetBarclay Damon TowerSyracuse, NY 13202Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | [ Scientific, ] surveying, [ photographic, optical, ]measuring, signalling, [ checking, ] supervising apparatus and instruments, namely, surveying instruments, [ interfaces for computers, computer serial ports, gateway routers in the nature of computer control hardware, integrated circuit modules, integrated circuit control modules, ] interface modules, [ integrated circuit network modules, integrated circuit standardized modules, standardized interfaces for computers, ] computer software for database management, for controlling and monitoring energy plants and energy networks of energy plants and for controlling the performance of energy plants and energy networks of energy plants, [ blank electronic chip cards, semiconductor chips, computer chips, ] electronic data logger, programmable logic controller (PLC), [ electric or electronic sensors for sensing currents, electrical resistance or voltage for use in energy networks, computers and in the field of energy production; ] measuring devices for use in energy networks, [ computers ] and in the field of energy production, namely, amp meters, voltmeters, [ and ohmmeters; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electricity conduits, static electricity eliminators, winding wires, electric contactors, current converters, apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, namely, current transformer, electric transformers, electric voltage transformers, ] electrical relays [ and transformers, accumulators and batteries, power inverters ], switchgears, voltage monitor modules, [ electronic monitor modules for monitoring electric current and electrical signals, namely, electric control module; apparatus and instruments for regulating or controlling electric current, namely, electric current switches, fuses, ] electronic monitors and monitor modules for monitoring electric current and electrical signals; [ apparatus for recording, transmission or reproduction of sound or images; magnetic data storage media, namely, blank magnetic data carriers; calculating machines, ] data processing equipment and computers; monitoring apparatus, namely, energy meters for tracking and monitoring energy usage, [baby monitors, ] voltage monitor modules, [ computer monitors, ] monitoring computers; [ electrical generators, power supplies, namely, emergency power supply, alternating current generators; electrical transformers, namely, current transformers; electric circuit switches, namely, electric switches for circuit breakers; electric switches; switch components, namely, electric switch housings, switch boxes, solenoid valves, electric contactor, switchgear, ] electric control panels, namely, electric control unit; [ circuitry, namely, circuitry breakers, circuit boards, circuits for heavy currents, electronic circuits; ] electric control panels [ ; integrated circuit chips as central processing and measuring unit for computers, data storage unit for computers, namely, computer storage devices, namely, high-speed storage subsystems for storage and backup of electronic data either locally or via a telecommunications network ] | SECTION 70 - CANCELLED | — |
| 016 | Instruction sheets, namely, written documentation for hardware, software and for the development and implementation of IT systems, namely, handbooks, catalogues, instruction manuals and work instructions; printed matter, namely, books, newsletters, pamphlets in the field of the development and implementation of IT systems, namely, handbooks, catalogues, instruction manuals and work instruction sheets | SECTION 70 - CANCELLED | — |
| 037 | [ Installation, repair and maintenance of computer hardware network systems; installation, repair and maintenance of power plants and power grids ] | SECTION 71 - CANCELLED | — |
| 038 | [ Telecommunications, namely, providing access to telecommunication networks, rental of equipment for telecommunications, providing information about telecommunications; providing Internet access, namely, providing access to information in the Internet; providing access to databases; providing frame relay connectivity services for data transfer, namely, relaying access to databases in the Internet; providing Internet access, namely, providing access to information, data, measurements in the Internet; voice over internet protocol (VOIP) services, namely, telecommunication by means of platforms and portals in the Internet; electronic exchange of data stored in databases accessible via telecommunication networks by means of Internet platforms; providing access to the Internet, namely, providing access to programs in computer networks; electronic mail services; facsimile transmission services; provision of voice short message services ] | SECTION 71 - CANCELLED | — |
| 042 | [ Scientific and technological services and research and design relating thereto in the field of renewable energy and energy networks; industrial analysis and research services in the field of renewable energy and energy networks; design and development of computer hardware and software; energy consulting, namely, technology planning and consulting in the field of renewable energy, technical energy consulting, scheduling control, yield forecast monitoring, power curve evaluation, incentives calculator, performance monitoring and reporting service, energy metering; configuration and development of energy networks, namely, technical planning of energy plants and networks, technical consultation in the field of environmental science, engineering services, design for others in the field of energy products for others, data acquisition of energy plants and networks; technical design for others in the field of operating plants for the supply of electricity, heat, water and cooling energy; computer network design for others, namely, configuration of computer networks by means of software; computer services, namely, development, updating and maintenance of software, namely, creation, maintenance and updating of data processing programs and software; design and creation of homepages and websites; consultancy in the field of energy-saving ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by natcon7 GmbH
- Other trademarks owned by natcon7 GmbH
- Other trademarks owned by natcon7 GmbH
- Other trademarks in Class 009
- Other trademarks in Class 016
- Other trademarks in Class 037
- Other trademarks in Class 038
- Other trademarks in Class 042
- Similar marks named D-RTU
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 11, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Oct 11, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 6, 2018 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 20, 2018 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 20, 2018 | INPC | INVALIDATION PROCESSED | — |
| Feb 9, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 9, 2017 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jun 9, 2017 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jun 9, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 22, 2017 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Feb 22, 2016 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 18, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 19, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 24, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 17, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 17, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 22, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 22, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 1, 2011 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 16, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 16, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 7, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 7, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 3, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 1, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 22, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 22, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 22, 2010 | ALIE | ASSIGNED TO LIE | — |
| Oct 12, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 12, 2010 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Oct 12, 2010 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Oct 12, 2010 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Sep 23, 2010 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 23, 2010 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 12, 2010 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 11, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 1, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 1, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 26, 2010 | ALIE | ASSIGNED TO LIE | — |
| Feb 1, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 3, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 30, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 30, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 30, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 29, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 24, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 20, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 20, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 17, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |