Drawing for LES PERSPECTIVES: ENSOLEILLEES

USPTO serial 79069978

LES PERSPECTIVES: ENSOLEILLEES

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
SOMERVILLE, ARETHA CHARESE
Law office
TMEG LAW OFFICE 107 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LES PERSPECTIVES: ENSOLEILLEES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Mounting frames of metal for fastening solar installations, solar modules and laminates; metal building materials; transportable buildings of metal; pipes and tubes of metalSECTION 70 - CANCELLED—
009Inverters, charge regulators, batteries, electric cables, electric and electronic measuring and display systems for solar installations, in particular for wind strength, temperature, performance, energy; all the aforesaid goods relating to solar energy technology; photovoltaic installations as a whole or individual components therefor, in particular solar modules made from silicon or other semiconductorsSECTION 70 - CANCELLED—
011Solar installations for generating electrical and thermal energy from the rays of the sun, and components thereof; thermal solar collectors; all the aforesaid goods relating to solar energy technology; solar furnaces, heat pumps, heat regenerators, heat accumulators, heat exchangersSECTION 70 - CANCELLED—
019Mooring bollards, not of metal; reinforcing materials, not of metals, for building; asphalt; girders, not of metal; huts; construction and worked timber; building materials, not of metal; non metallic buildings; concrete; concrete building elements; bituminous products for building; covers, not of metal; building cardboard (asphalted); tiles, not of metal; scantlings (carpentry); roofs, not of metal, with integrated solar cells; drain pipes, not of metal; refractory materials; non-metallic scaffolding; xylolith; gravel; artificial stone; posts, not of metal; non-metallic rigid piping for building; non metallic stays; Utility poles not of metal; tanks of masonry; non-metallic frames for buildingsSECTION 70 - CANCELLED—
035Advertising; business management services; business administration; office functions; building promoter services, namely economic preparation of building projects and office functions, namely organisational preparation of building projects, in particular for installations for generating renewable energy; business organisation consultancy; organisational project management; business management (management services) in the planning and start-up phase, for projects for generating renewable energy, including being long-term business servicesSECTION 70 - CANCELLED—
036Insurance; financial affairs; monetary affairs; real estate affairs; building promoter services, namely the financial preparation and management of building projects; development of usage concepts with regard to financial matters; management of land; facility management, namely management of buildings and installations of all kindsSECTION 70 - CANCELLED—
037Building construction; repair of construction machines and construction equipment, water vehicles, process technology installations for environmental technology, installation services; construction information; building supervision; building monitoring; building, namely the implementation of building projects; structural and civil engineering; construction, namely conducting building projects; building construction supervisionSECTION 70 - CANCELLED—
042Architectural consultancy; architecture, engineering surveying, geological expertise; land surveying, research and development (for others), technical project planning; building, namely the technical preparation of building projects; engineering work; services of a technical measuring and testing laboratory; construction drafting; research physics; environmental assessment servicesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 28, 2019DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Sep 27, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
May 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 22, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 13, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 23, 2011FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 21, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 19, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 1, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 16, 2010OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 16, 2010OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 19, 2010MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 19, 2010ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 18, 2010DOCKASSIGNED TO EXAMINER—
Sep 11, 2009RFNPREFUSAL PROCESSED BY IB—
Jul 24, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 24, 2009RFRRREFUSAL PROCESSED BY MPU—
Jul 24, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 24, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 23, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 20, 2009DOCKASSIGNED TO EXAMINER—
Jul 20, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 17, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance