USPTO serial 79070029
HOAC
Reviewed by CopyMark Law Group
Reg. 3927801Status 709
- Filing date
- Status date
- Registration date
- Mar 8, 2011
- Examiner
- MCBRIDE, THEODORE M
- Law office
- GENERIC WEB UPDATE
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with HOAC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
WILLIAM J. BRUCKER
WILLIAM J. BRUCKER STETINA BRUNDA GARRED & BRUCKER75 ENTERPRISESUITE 250ALISO VIEJO, CA 92656Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal constructions for cross bars, stages, elevated stands and for providing of access to elevated positions, namely, elevating work platforms, non-portable racked stages, namely, collapsible stages with folding legs, [ stage trap mechanisms, namely, motor driven movable stage platforms that recede into a stage, catwalks, ] telescopic stands for seating, seating, namely, metal bleachers, metal roof trusses for stage construction and stage lighting support, pit fillers, namely, stage assemblies that extend over orchestra pits or seating areas, [ metal track for rail vehicles and ] guardrails; metal rails and systems for metal rails comprised of overhead rail guides and tracks for supporting moving cameras, moving lights and moving set parts; metal turntables for stages; metal universal frames for building stages; metal chassis system, namely, metal frames for building; metal staircases; metal fasteners and connectors for assembling in a securing system, namely, bolts, [ nails, rivets ] screws; [ metal slides for theater sets; prefabricated metal podiums and ] metal platforms with parts of wood [ ; common metals and their alloys; metal building materials, namely, aluminum alloy; transportable metal buildings; metal for railway tracks; non-electric cables and wires of common metal; metal pipes and tubes ] | SECTION 71 - CANCELLED | — |
| 007 | Hydraulic and pneumatic controls for machines and motors; [ machines for cutting and forming metals, wood and plastics; metal working machine tools; ]motors [ and engines ] except for land vehicles; machine coupling and transmission components except for land vehicles [ ; parts of motors and engines, namely, brushes, compressors, and pumps ] | SECTION 71 - CANCELLED | — |
| 035 | retail and wholesale store services featuring metal constructions for cross bars, stages, and elevated stands for providing of access to elevated positions, namely, platforms, racked stages, stage [ trap mechanisms, catwalks, ] flexible metal stands, telescopic stands, trusses, pit fillers, track systems and guardrails, metal rails and systems for metal rails comprised of aluminum, metal turntables for stages, metal universal frames for building stages, metal chassis systems, namely, stage movers, stage wagon and ballet wagon, metal staircases, metal fasteners and connectors for assembling in a securing system, namely, bolts, [ nails, rivets ] screws, [ metal slides for theatre sets, prefabricated metal podiums and ] metal platforms with parts of wood, [ common metals and their alloys, metal building materials, namely, aluminum, transportable metal buildings, materials of metal for railway tracks, non-electric cables and wires of common metal, metal pipes and tubes, ] hydraulic and pneumatic controls for machines and motors, [ machines for cutting and forming metals, wood and plastics, metal working machine tools, ] motors [ and engines ] except for land vehicles, machine coupling and transmission components except for land vehicles [, and parts of motors and engines, namely, brushes, compressors, and pumps ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by hoac Schweißtechnik GmbH
- Other trademarks owned by hoac Schweißtechnik GmbH
- Other trademarks owned by hoac Schweißtechnik GmbH
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 035
- Similar marks named HOAC
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 19, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 26, 2022 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 25, 2022 | INPC | INVALIDATION PROCESSED | — |
| Jul 26, 2022 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Mar 8, 2020 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Oct 13, 2017 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Oct 13, 2017 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Oct 11, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 8, 2017 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Oct 27, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 13, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 21, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 21, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 8, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 8, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 31, 2010 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 21, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 16, 2010 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 16, 2010 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 1, 2010 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 18, 2010 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Nov 18, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 18, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 18, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 18, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 15, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 15, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 5, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Oct 1, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Sep 22, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 21, 2010 | ALIE | ASSIGNED TO LIE | — |
| Sep 14, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 14, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 13, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 13, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 19, 2010 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 18, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 26, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 26, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 26, 2010 | ALIE | ASSIGNED TO LIE | — |
| Feb 12, 2010 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 27, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 28, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 28, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 28, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 27, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 24, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 24, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 24, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 23, 2009 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Jul 23, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 22, 2009 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 20, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 17, 2009 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |