Drawing for NATCON7 SMART SOLUTIONS FOR RENEWABLES

USPTO serial 79070812

NATCON7 SMART SOLUTIONS FOR RENEWABLES

Reviewed by CopyMark Law Group

Reg. 4036865Status 404
Filing date
Status date
Registration date
Oct 11, 2011
Examiner
BRADLEY, EVELYN
Law office
TMEG LAW OFFICE 105

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with NATCON7 SMART SOLUTIONS FOR RENEWABLES?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Elizabeth A. Cominolli

Elizabeth A. Cominolli Barclay Damon LLP125 East Jefferson StreetSyracuse, NY 13202UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Scientific, surveying, photographic, optical, measuring, signaling, checking, supervising apparatus and instruments, namely, surveying instruments, interfaces for computers, computer serial ports, gateway routers in the nature of computer control hardware, integrated circuit modules, interface modules, network modules, standardized modules, and standardized interfaces all being computer hardware; software for controlling and monitoring energy plants, energy networks of energy plants and for controlling the performance of energy plants and energy networks of energy plants; [ electronic chips for the manufacture of integrated circuits; ] semiconductor chips; computer chips; electric data logger; programmable logic controller (PLC); electric sensors and electronic sensors for sensing electrical parameters in AC and DC circuits and for sensing environmental conditions and system conditions of energy networks, computers and energy production equipment; computers for use in the field of energy production; measuring devices for use in energy networks; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electricity conduits, static electricity eliminators, winding wires, electric contactors, current converters, current transformer; electric transformers; electric voltage transformers; electrical relays and transformers; accumulators and batteries; [ power inverters; ] switchgears; voltage monitor modules; electric control modules being computer hardware; apparatus and instruments for regulating or controlling electric current, namely, electric current switches, electrical fuses, electronic computer monitors and voltage monitor modules for monitoring electric current and electrical signals; apparatus for recording, transmission or reproduction of sound and images; [ magnetic data storage media, namely, blank magnetic data carriers; calculating machines; ] data processors and computers; electronic monitoring apparatus, namely, energy meters for tracking and monitoring energy usage, baby monitors, voltage monitor modules, computer monitors, monitoring computers; electric generators; [ alternating current generators; ] current transformers; circuit breakers; electric switches; switch components, namely, electric switch housings, switch boxes, solenoid valves, electrical contactors, switchgear, electric control panels; circuitry, namely, circuitry breakers, circuit boards, printed circuits for heavy currents, electronic circuits; electric control panels; electronic integrated circuitsSECTION 71 - CANCELLED—
016Printed materials, namely, handbooks, catalogues, instruction manuals and work instruction sheets in the field of development and implementation of IT systems, computer software and hardwareSECTION 71 - CANCELLED—
037Installation, repair and maintenance of computer network systems; installation, repair and maintenance of power plants and power gridsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, research and design in the field of development of renewable energy and energy networks; industrial analysis and research services in the field of development of renewable energy and energy networks; design and development of computer hardware and software; technical energy consulting in the field of development of renewable energy; engineering services, namely, technical configuration and technical development of monitoring systems and controlling systems for energy supply networks; technical design of new products for others in the field of operating plants for the supply of electricity, heat, water and cooling energy; configuration of computer networks by means of software, in the field of renewable energy and energy networks; computer services, namely, creating, maintaining and updating data processing computer softwareSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 29, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Nov 29, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 1, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 7, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 7, 2019INPCINVALIDATION PROCESSED—
Oct 1, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 1, 2019C71TCANCELLED SECTION 71—
Jan 3, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 27, 2018PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Jun 7, 2018PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Apr 12, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 10, 2018ES75TEAS SECTION 71 & 15 RECEIVED—
Jun 27, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 11, 2016REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 18, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 19, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 23, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 30, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 30, 2012FIMPFINAL DISPOSITION PROCESSED—
Jan 11, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 11, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 26, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 26, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 24, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jul 6, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 6, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 20, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 16, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 15, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jun 15, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 15, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 15, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 6, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 6, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 6, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 28, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 13, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 13, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 7, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 7, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 7, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 14, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 14, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 13, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 13, 2010EXPIEX PARTE APPEAL-INSTITUTED—
Oct 13, 2010JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Oct 13, 2010EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Apr 13, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 13, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 13, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 11, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 11, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 11, 2010ALIEASSIGNED TO LIE—
Feb 25, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 25, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 25, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2009RFNTREFUSAL PROCESSED BY IB—
Aug 25, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 25, 2009RFRRREFUSAL PROCESSED BY MPU—
Aug 24, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 23, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 18, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2009DOCKASSIGNED TO EXAMINER—
Aug 14, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 13, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance