Drawing for EDSCHA TRAILER SYSTEMS

USPTO serial 79070874

EDSCHA TRAILER SYSTEMS

Reviewed by CopyMark Law Group

Reg. 4228278Status 709
Filing date
Status date
Registration date
Oct 23, 2012
Examiner
SINGLETON, RUDY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EDSCHA TRAILER SYSTEMS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph W. Berenato, III

JOSEPH W BERENATO III BERENATO WHITE LLC6550 ROCK SPRING DRIVESUITE 240BETHESDA, MD 20817

Goods and services

ClassDescriptionStatusFirst use
006Covering frames of metal with tarpaulins for transportable containers; parts of covering frames of metal with tarpaulins for transportable containers, namely, tarpaulin rollers being metal rollers, end carriages with automatic foldup, tie rods, gantry beams, automatic foldup, ramps, stanchion curtain roller carrier, ramp locking devices, fixing discs, pull straps, metal hooks, tarpaulin fasteners, namely, metal fasteners being rivets, metal clips, tarpaulin clamp being metal clamps, roller carriage, roof reinforcement, metal brackets, end carriages, retaining plate, automatic foldup with gas spring, locking wedge, bows, aluminum beams, slider adapter, steel catch, belt roller, guide tube, latching sheet, stanchion roller carriage, roller carrier, cross bar carrier, equalizing linkage, clamping profile, carriage bracket being metal bracket, axle TIR, round head metal screw, hexagonal metal screw, hexagonal metal nut, blind rivet being metal rivet, twisting clamp being metal clamps, joints, ring pin, rail U, rollers, lens head screws being metal screws, gas spring, link pickup, bulkhead bow bracket, bulkhead bow holder, pillar connection, rail frame, across tube, connecting pins, locking pins, distance tubes, drop latch being metal latches, rectangular tubing being metal tubing, bow end, corner plate, strut, strut bearing, gibbet connection, rail extension, splint, cross bar, ring nut, slip-on roller, tarpaulin holder, pillar locking device, lateral tie bar, rail locking pins, reception tube, allen screw being metal screws, metal washer, eyelet, flange sleeve, raised countersunk head screw being metal screws, protecting cap, tube clip pin, driveshaft, drive unit, gear motor, sliding hub, motor bracket, spur wheel, overload safety switch, spring dowel sleeve, box for safety clutch, connecting cable, bulkhead cable, rivet, tarpaulin bracket, tube bow, bow loop, frames, bulldog grip, recessed grip, plane spring, plane nuts being metal nuts, bottom locking handle, pan head screw being metal screws, end plug, guard, metal bolt, spacer, column crossmember, frame reinforcers, frame arms, wall closure, fillister head screw being metal screws, stanchion pocket, tension rope, safety chain, rope, rope connection, expander rope, safety rope, pull rope, PVC pelmetSECTION 71 - CANCELLED—
012Superstructures for land vehicles, namely, structural parts, particular for trucks, trailers, railway wagons; covering frame kits for land vehicles and comprised of sliding pillars being structural parts of sliding roof systems, front walls and rear frames, lifting systems comprised of gas springs, in particular for trucks, trailers, railway wagons; fitted sliding covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted sliding hoop-type covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted component parts for land vehicles, in particular for trucks, trailers, railway wagons and tarpaulin superstructures, namely, longitudinal supports, hoops, rollers, roller carriages and stanchions; fitted covers for land vehicles, in particular for trucks, trailers, railway wagons; covering systems for land vehicles, comprised of rail frames, end running parts with lifting function and end bow, roller carriage, tarpaulin roof, wire rope, tension lock, rope clamp, cable eye stiffeners, turnbuckles, gantry beam, drip moulding, welting, blind rivet, tarpaulin roller, rail lock, in particular for trucks, trailers, railway wagonsSECTION 71 - CANCELLED—
020Covering frames of plastic with tarpaulins for transportable containers; component parts of covering frames of plastic with tarpaulins for transportable containersSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 20, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 21, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 21, 2020INPCINVALIDATION PROCESSED—
Jan 24, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 4, 2019RNWLINTERNATIONAL REGISTRATION RENEWED—
May 24, 2019C71TCANCELLED SECTION 71—
Apr 25, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 18, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 28, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 23, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Feb 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 28, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 28, 2013FIMPFINAL DISPOSITION PROCESSED—
Jan 23, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 23, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 8, 2012GPNXNOTIFICATION PROCESSED BY IB—
Aug 7, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 7, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 18, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 18, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 18, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 29, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 28, 2012ALIEASSIGNED TO LIE—
Jun 9, 2012EXPTEXPARTE APPEAL TERMINATED—
Jun 9, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 21, 2012JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Feb 27, 2012JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Nov 1, 2011RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
Nov 1, 2011RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
Nov 1, 2011CFRCSUBSEQUENT FINAL REFUSAL WRITTEN—
Sep 29, 2011JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
May 9, 2011EXPIEX PARTE APPEAL-INSTITUTED—
May 9, 2011EXAFEXPARTE APPEAL RECEIVED AT TTAB—
May 9, 2011RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED—
May 9, 2011RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED—
May 9, 2011RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED—
Apr 14, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 14, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 14, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 28, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 13, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 13, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 9, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Nov 9, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 9, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 14, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 14, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 14, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 14, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 14, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 14, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 13, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 22, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 22, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 22, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 16, 2009RFNTREFUSAL PROCESSED BY IB—
Sep 21, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 21, 2009RFRRREFUSAL PROCESSED BY MPU—
Sep 21, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 20, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 17, 2009DOCKASSIGNED TO EXAMINER—
Aug 18, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 13, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance