USPTO serial 79070875
EDSCHA TRAILER SYSTEMS
Reviewed by CopyMark Law Group
Reg. 4215876Status 404
- Filing date
- Status date
- Registration date
- Oct 2, 2012
- Examiner
- SINGLETON, RUDY
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with EDSCHA TRAILER SYSTEMS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
SE
SE-462 28 Vänersborg, SE
SE-462 28 Vänersborg, SE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Joseph W. Berenato, III
JOSEPH W BERENATO III BERENATO & WHITE LLC6550 ROCK SPRING DRIVESUITE 240BETHESDA, MD 20817Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Covering frames of metal with tarpaulins for transportable containers; parts of covering frames of metal with tarpaulins for transportable containers, namely, tarpaulin rollers being metal rollers, end carriages with automatic foldup, tie rods, gantry beams, automatic foldup, ramps, stanchion curtain roller carrier, ramp locking devices, fixing discs, pull straps, metal hooks, tarpaulin fasteners, namely, metal fasteners being rivets, metal clips, tarpaulin clamp being metal clamps, roller carriage, roof reinforcement, metal brackets, end carriages, retaining plate, automatic foldup with gas spring, locking wedge, bows, aluminum beams, slider adapter, steel catch, belt roller, guide tube, latching sheet, stanchion roller carriage, roller carrier, cross bar carrier, equalizing linkage, clamping profile, carriage bracket being metal bracket, axle TIR, round head metal screw, hexagonal metal screw, hexagonal metal nut, blind rivet being metal rivet, twisting clamp being metal clamps, joints, ring pin, rail U, rollers, lens head screws being metal screws, gas spring, link pickup, bulkhead bow bracket, bulkhead bow holder, pillar connection, rail frame, across tube, connecting pins, locking pins, distance tubes, drop latch being metal latches, rectangular tubing being metal tubing, bow end, corner plate, strut, strut bearing, gibbet connection, rail extension, splint, cross bar, ring nut, slip-on roller, tarpaulin holder, pillar locking device, lateral tie bar, rail locking pins, reception tube, allen screw being metal screws, metal washer, eyelet, flange sleeve, raised countersunk head screw being metal screws, protecting cap, tube clip pin, driveshaft, drive unit, gear motor, sliding hub, motor bracket, spur wheel, overload safety switch, spring dowel sleeve, box for safety clutch, connecting cable, bulkhead cable, rivet, tarpaulin bracket, tube bow, bow loop, frames, bulldog grip, recessed grip, plane spring, plane nuts being metal nuts, bottom locking handle, pan head screw being metal screws, end plug, guard, metal bolt, spacer, column crossmember, frame reinforcers, frame arms, wall closure, fillister head screw being metal screws, stanchion pocket, tension rope, safety chain, rope, rope connection, expander rope, safety rope, pull rope, PVC pelmet | SECTION 71 - CANCELLED | — |
| 012 | Superstructures for land vehicles, namely, structural parts, particular for trucks, trailers, railway wagons; covering frame kits for land vehicles and comprised of sliding pillars being structural parts of sliding roof systems, front walls and rear frames, lifting systems comprised of gas springs, in particular for trucks, trailers, railway wagons; fitted sliding covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted sliding hoop-type covers for land vehicles, in particular for trucks, trailers, railway wagons; fitted component parts for land vehicles, in particular for trucks, trailers, railway wagons and tarpaulin superstructures, namely, longitudinal supports, hoops, rollers, roller carriages and stanchions; fitted covers for land vehicles, in particular for trucks, trailers, railway wagons; covering systems for land vehicles, comprised of rail frames, end running parts with lifting function and end bow, roller carriage, tarpaulin roof, wire rope, tension lock, rope clamp, cable eye stiffeners, turnbuckles, gantry beam, drip moulding, welting, blind rivet, tarpaulin roller, rail lock, in particular for trucks, trailers, railway wagons | SECTION 71 - CANCELLED | — |
| 020 | Covering frames of plastic with tarpaulins for transportable containers; component parts of covering frames of plastic with tarpaulins for transportable containers | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by VBG GROUP AB (publ)
- Other trademarks owned by VBG GROUP AB
- Other trademarks owned by VBG GROUP AB
- Other trademarks in Class 006
- Other trademarks in Class 012
- Other trademarks in Class 020
- Similar marks named EDSCHA TRAILER SYSTEMS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 10, 2020 | IRIV | IRREGULARITY ON INVALIDATION RECEIVED FROM IB | — |
| Jan 27, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 27, 2020 | INPC | INVALIDATION PROCESSED | — |
| Jan 3, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jan 3, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 3, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 3, 2019 | C71T | CANCELLED SECTION 71 | — |
| Apr 25, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 18, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 28, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 2, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 30, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 8, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 8, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 2, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 2, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 22, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 17, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 17, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 27, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 27, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 27, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 14, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 9, 2012 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Jun 9, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 21, 2012 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Feb 27, 2012 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Nov 1, 2011 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| Nov 1, 2011 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| Nov 1, 2011 | CFRC | SUBSEQUENT FINAL REFUSAL WRITTEN | — |
| Sep 29, 2011 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| May 9, 2011 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| May 9, 2011 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| May 9, 2011 | RDX3 | NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED | — |
| May 9, 2011 | RDX1 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED | — |
| May 9, 2011 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Apr 14, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 14, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 14, 2011 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 28, 2011 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 13, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 13, 2011 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 19, 2010 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 19, 2010 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 19, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 28, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 28, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 28, 2010 | ALIE | ASSIGNED TO LIE | — |
| Oct 14, 2010 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 14, 2010 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 14, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 14, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 13, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 22, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 22, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 22, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 16, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 21, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 21, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 21, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 20, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 18, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 14, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 13, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |