USPTO serial 79070913
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
57223 Kreuztal, DE
57223 Kreuztal, DE
57223 Kreuztal, DE
DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
JOHN ALUMIT
JOHN ALUMIT ALUMIT IP135 South Jackson Street, Suite 200Glendale, CA 91205UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Construction materials made of metal, namely, metal pipes for use as pipe lines in the oil, gas, and water industry; steel pipes for use offshore as tubulars, cans, legs, piles, bracings, conductors, risers and tethers; steel pipes for use in the construction industry for bridges, stadiums, and high-rises; steel pipes for use in steel structures under water as piles, dolphins, and anchor piles; metal machinery pipes for use in the paper industry as felt rolls, wire rolls, press rolls, dryers, reel spools, and winder drums; metal machinery pipes for use as hydraulic cylinders, cable drums, yarn rollers, rolls for weaving machinery, cardan shafts, and dryer rolls; pipes and tubes made of metal, namely, metal structural pipes for building construction; non-electrical metal conduits for energy and raw materials; metal pipes used in pressure vessels, except for machine parts | SECTION 71 - CANCELLED | — |
| 007 | Parts for compressed-air tools used in construction engineering, namely, metal pipes; Parts of oilfield wellhead machines, namely, pipes made of metal | SECTION 71 - CANCELLED | — |
| 037 | Installation of building insulation around metal pipes and tubes; construction consultancy | SECTION 71 - CANCELLED | — |
| 040 | Exterior and interior treatment of the metal in pipes and tubes made of metal, namely, exterior and interior steel plating; treatment of materials by means of heat treatment of pipes and tubes made of metal | SECTION 71 - CANCELLED | — |
| 042 | Technical planning of buildings; Technical research on building construction planning; technical project planning of pipe lines in the oil, gas, and water industry; technical project planning of Offshore pipes and under water structures; technical project planning of buildings, bridges, stadiums, and high-rises; technical project planning of machinery pipes for the paper industry; technical consultancy in relation to all of the above; engineering; calibrations; non-destructive material testing of pipes and tubes made of metal | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 20, 2024 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 29, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 17, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 29, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jul 10, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 10, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jun 19, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 21, 2019 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Oct 19, 2018 | C71T | CANCELLED SECTION 71 | — |
| Oct 15, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 10, 2016 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| May 10, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 1, 2016 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Apr 13, 2015 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 7, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 29, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 29, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 3, 2010 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 3, 2010 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 13, 2010 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 13, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 26, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 26, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 23, 2009 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 20, 2009 | ALIE | ASSIGNED TO LIE | — |
| Dec 17, 2009 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 4, 2009 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Dec 4, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 4, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 3, 2009 | ALIE | ASSIGNED TO LIE | — |
| Nov 18, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 18, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 29, 2009 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 21, 2009 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 21, 2009 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 21, 2009 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 20, 2009 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 18, 2009 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 14, 2009 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 14, 2009 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 13, 2009 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |