Drawing for I-MELTOR

USPTO serial 79070983

I-MELTOR

Reviewed by CopyMark Law Group

Reg. 3793304Status 404
Filing date
Status date
Registration date
May 25, 2010
Examiner
CARLSON, KRISTIN
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with I-MELTOR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher J. Whalley

Christopher J. Whalley CANTOR COLBURN LLP20 Church StreetFloor 22HARTFORD, CT 06103

Goods and services

ClassDescriptionStatusFirst use
007Lubricators, namely, lubricating machines; conveyor belts; machine for processing and filtering slag; pneumatic transporters and installations for transport and injection of pulverulent materials by pneumatic means in a tank furnace; slag granulation machine; equipment for steelworks, namely, continuous metal casting machines, machines for recycling iron, machines for recycling steelmaking dust and sludge, machines for recovering valuable iron, zinc and other non-ferrous metal, machines for recycling non-ferrous residues, and recovering valuable metallic contents; installations and equipment for vacuum ladle treatment of cast iron and steel, namely, injection lance handling devices, injection lance exchange manipulator, ladle titling devices, gears and enclosed drives for industrial machinery, transmission gears for machines; crushing and screening installations and equipment, namely, machines for recycling iron, machines for recycling steelmaking dust and sludge, machines for recovering valuable iron, zinc and other non-ferrous metal, machines for recycling non-ferrous residues, and recovering valuable metallic contents; installations and apparatus for changing blowing lances, namely, an automatic lance changing machine and dust-extracting machinery, all intended for use in the iron and steel industry; installations and equipment for fitting a refractory lining to the interior wall of a furnace, namely, machines and lines composed thereof for the production of parts for the aforementioned machines, particularly foaming lines, die-cutting machines, molding presses, scoring machines, laminating machines, water jet cutting machines, long fiber injection machines; cranes and overhead travelling cranes for special use for iron metallurgy and metal-working; valves being parts of machines; couplings for machines, namely, stopcocks; hydraulic circuits, controls and their parts, namely, hydraulic controls for machines, motors and engines; dust removal machines for metallurgical plants and blast furnaces, namely, dust separators and vacuum shredders for clearing debrisSECTION 70 - CANCELLED—
009Control apparatus and installations, namely, monitoring, measurement, adjustment, weighing and dose measurement apparatus for electrical and multi-stage furnace units and test probes for testing integrated circuits; gas analyzing and measuring apparatus, namely, gas probes; testing sample collection equipment, namely, solid material sampling probes for use in industrial diagnostic testing; circuits and electronic parts for hydraulic controlsSECTION 70 - CANCELLED—
011Electric steel smelting plant for industrial users in the steel industry; multi-stage furnaces, electric furnaces, in particular electric arc furnaces; installations and apparatus for cooling multi-story and electrical furnaces especially the electric arc type; heat recovery units; incineration plant equipment, namely, incinerators; fume treatment plants; plants and installations for multi-stage furnaces and electric furnaces, namely, electrically heated diffusion furnaces for industrial use, hot blast furnaces, heating elements, furnace boilers, incinerators and dust-extractors for the treatment of exhaust gas for use in the iron and steel industry; loading systems for multi-stage and electrical furnaces, in particular arc furnaces, namely, heating systems composed primarily of tubes, pipes and manifolds through which warm or high temperature water circulates, heat diffusion collars and discs for use in furnaces, gas injectors for disbursing solids and/or liquids for purification and sterilization purposes; plants and installations for kiln packing and refining molten smelt in electrical furnaces, namely, rotary and calcising kilns, heat accumulators, drying drums; water cooling equipment for multi-stage furnaces and electrical furnaces, namely, water filtering and conditioning units for industrial use, water coolers, pipe heat exchangers not being parts of machines that feature cooling fansSECTION 70 - CANCELLED—
040Treatment of materials, namely, treatment of metal and steel; waste treatment, in particular treatment of waste containing metals in all forms, sludge treatment, dust or other residues contaminated by metals in different forms, including metals in the form of hydroxide oxides and saltsSECTION 70 - CANCELLED—
042Engineering advice and engineering services in engineering especially in relation to plant, equipment and procedures for iron metallurgy and metal-working, turnkey units for different industrial and civil sectors, metal structures, boilermaking and mechanics; patent exploitation; construction consultancy services; drafting of construction plans; technical project study in the field of iron, steel and non-ferrous metallurgy; mechanical research; technical research in the field of iron, steel and non-ferrous metallurgy; engineering services in the fields of mechanical engineering, civil engineering, fluids, electronics, electricity, automation, artificial intelligence and optimization; performing technical and scientific calculations by computer in the field of iron, steel and non-ferrous metallurgy; performing technical designs in the field of iron, steel and non-ferrous metallurgy by computer, and preparation of related technical expertise; performing architectural designs by computer, and preparation of related technical expertise; design and development consultation in the field of iron, steel and non-ferrous metallurgy; technical support, monitoring and technical supervision, namely, troubleshooting in the nature of diagnosing computer hardware and software problems; services connected with software, namely, concept design, development, updating, implementation and maintenance of software; computer program development; services of engineers, physicist and chemists in the nature of expert reports; drafting of technical expert reports; services provided for testing of metals and materials; project analysis, namely, planning of buildings and construction; technical consultancy and activities of experts, namely, for technical applications in the field of iron, steel and non-ferrous metallurgy; development and creation of data processing programs, for third parties; technical research and advice and services in the field of engineering for hydraulic systems, apparatus and plant; custom design of hydraulic devices and controlsSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 9, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Aug 9, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
May 25, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jul 5, 2016NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jul 5, 2016C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jul 1, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 25, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Aug 2, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 1, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 3, 2010FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 3, 2010FIMPFINAL DISPOSITION PROCESSED—
Aug 25, 2010FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 25, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 9, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 29, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 27, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 27, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jan 27, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 27, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 27, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 26, 2010CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 26, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 26, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 15, 2010ALIEASSIGNED TO LIE—
Jan 11, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 11, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2009RFNTREFUSAL PROCESSED BY IB—
Aug 25, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 25, 2009RFRRREFUSAL PROCESSED BY MPU—
Aug 24, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 23, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 18, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2009DOCKASSIGNED TO EXAMINER—
Aug 14, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 13, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance