Drawing for PROTEAN POWER

USPTO serial 79071004

PROTEAN POWER

Reviewed by CopyMark Law Group

Reg. 3983399Status 404
Filing date
Status date
Registration date
Jun 28, 2011
Examiner
COLEMAN, NICHOLAS A
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PROTEAN POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Installations for the production of power from wave motion; power generation apparatus, namely, wave energy converters; electric power supplies; apparatus for the generation of electricity; power transmission mechanisms, namely, turbines for power generation; wind turbines; turbine electricity generating machines; and replacement parts, fittings and accessories in this class for all of the aforementioned goodsSECTION 71 - CANCELLED—
037Building construction; installation, repair and maintenance of energy conversion apparatus and power plants; installation, repair and maintenance of wave energy conversion apparatus and wave energy power plants; and information and advisory services in relation to the construction, repair, maintenance and installation of energy conversion apparatus, power plants, wave energy conversion apparatus and wave energy power plantsSECTION 71 - CANCELLED—
039Distribution of energy; information and advisory services in relation to the distribution of energy; and information and advisory services in relation to the distribution of power from wave motion and from installations for the production of power from wave motionSECTION 71 - CANCELLED—
040Production of energy; generation of electricity; generation of energy from wave motion, wind and the sun; custom fabrication of metal hardware, and engineering products; and information and advisory services in relation to the production of energy and the generation of energy from wave motionSECTION 71 - CANCELLED—
042Consultancy services in relation to energy generation, and the production of energy from wave motion, the wind and the sun; industrial design services; energy auditing; material testing; mechanical research; engineering services; accreditation services, namely, setting and providing standards monitoring in the use of energy; research in the field of environmental protection; and information and advisory services in relation to energy generation, and the production of energy from wave motion, wind and the sunSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 18, 2020UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Dec 27, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Dec 27, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 14, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 11, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 11, 2018INPCINVALIDATION PROCESSED—
Oct 2, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 2, 2018C71TCANCELLED SECTION 71—
Nov 14, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 3, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 2, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 1, 2011FIMPFINAL DISPOSITION PROCESSED—
Sep 28, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 28, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 16, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 12, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 12, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 24, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 24, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 9, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 7, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 7, 2011ALIEASSIGNED TO LIE—
Feb 9, 2011CNEAEXAMINERS AMENDMENT MAILED—
Feb 9, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 9, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Feb 9, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 3, 2011DOCKASSIGNED TO EXAMINER—
Jan 28, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 13, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 13, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 7, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 7, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 28, 2010DOCKASSIGNED TO EXAMINER—
Mar 15, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 15, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2010ALIEASSIGNED TO LIE—
Mar 2, 2010MAILPAPER RECEIVED—
Oct 3, 2009RFNTREFUSAL PROCESSED BY IB—
Sep 2, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 2, 2009RFRRREFUSAL PROCESSED BY MPU—
Sep 2, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 1, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2009DOCKASSIGNED TO EXAMINER—
Aug 18, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 13, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance