Drawing for PROTEAN

USPTO serial 79071005

PROTEAN

Reviewed by CopyMark Law Group

Reg. 3960650Status 404
Filing date
Status date
Registration date
May 17, 2011
Examiner
MCMORROW, RONALD G
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with PROTEAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

SHERYL DE LUCA

SHERYL DE LUCA NIXON & VANDERHYE PC901 NORTH GLEBE RD 11TH FLARLINGTON, VA 22203-1808UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Installations for the production of power from wave motion; power generation apparatus, namely, wave energy converters; electric power supplies; apparatus for the generation of electricity; power transmission mechanisms, namely, turbines for power generation; wind turbines; turbine electricity generating machines; and replacement parts, fittings and accessories in this class for all of the aforementioned goodsSECTION 71 - CANCELLED—
037Building construction; installation, repair and maintenance of energy conversion apparatus and power plants; installation, repair and maintenance of wave energy conversion apparatus and wave energy power plants; and information and advisory services in relation to the construction, repair, maintenance and installation of energy conversion apparatus, power plants, wave energy conversion apparatus and wave energy power plantsSECTION 71 - CANCELLED—
039Distribution of energy; information and advisory services in relation to the distribution of energy; and information and advisory services in relation to the distribution of power from wave motion and from installations for the production of power from wave motionSECTION 71 - CANCELLED—
040Production of energy; generation of electricity; generation of energy from wave motion, wind and the sun;custom fabrication of metal hardware, and engineering products; and information and advisory services in relation to the production of energy and the generation of energy from wave motion; * Consultancy services in relation to energy generation, and the production of energy from wave motion, the wind and the sun *SECTION 71 - CANCELLED—
042[ Consultancy services in relation to energy generation, and the production of energy from wave motion, the wind and the sun; ] industrial design services; energy auditing; material testing; mechanical research; engineering services; accreditation services, namely, setting and providing standards monitoring in the use of energy; research in the field of environmental protection; and information and advisory services in relation to energy generation, and the production of energy from wave motion, wind and the sunSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 27, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Dec 27, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 7, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 10, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 10, 2018INPCINVALIDATION PROCESSED—
Aug 22, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 22, 2017C71TCANCELLED SECTION 71—
Nov 6, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 13, 2013INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 15, 2012INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 5, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 5, 2011FIMPFINAL DISPOSITION PROCESSED—
Aug 17, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 18, 2011CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Jul 15, 2011COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jul 15, 2011PLGLASSIGNED TO PARALEGAL—
Jun 26, 2011RINXUSPTO CORRECTION PROCESSED BY IB—
Jun 26, 2011CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 17, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 1, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 26, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Feb 10, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 10, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 9, 2011NPUBNOTICE OF PUBLICATION—
Jan 28, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 21, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 19, 2011CNEAEXAMINERS AMENDMENT MAILED—
Jan 19, 2011ALIEASSIGNED TO LIE—
Jan 19, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 19, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jan 19, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 13, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 13, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jun 16, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 16, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 28, 2010DOCKASSIGNED TO EXAMINER—
Mar 15, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 15, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2010ALIEASSIGNED TO LIE—
Mar 2, 2010MAILPAPER RECEIVED—
Oct 3, 2009RFNTREFUSAL PROCESSED BY IB—
Sep 2, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 2, 2009RFRRREFUSAL PROCESSED BY MPU—
Sep 2, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 1, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 1, 2009RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Sep 1, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 31, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 24, 2009DOCKASSIGNED TO EXAMINER—
Aug 18, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 14, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 13, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance