Drawing for SMARTER GRID SOLUTIONS

USPTO serial 79072096

SMARTER GRID SOLUTIONS

Reviewed by CopyMark Law Group

Reg. 3968652Status 404
Filing date
Status date
Registration date
May 31, 2011
Examiner
MAHMOUDI, MARIAM AZIZ
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SMARTER GRID SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Janet F. Satterthwaite

Janet F. Satterthwaite VENABLE LLPP.O. BOX 34385WASHINGTON, DC 20043-9998UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Business management and advisory services relating to the operation of power networks; conducting business and economic feasibility studies in the field of power generation, transmission, distribution and network operation; conducting economic feasibility studies relating to power generation, transmission, distribution and network operationSECTION 71 - CANCELLED—
037Installation, maintenance and repair of control systems for power generators and power networks; information services relating to theoretical and practical aspects of the installation and maintenance of control systems for power generators and power networks; installation and maintenance of active real time control systems for electricity power networksSECTION 71 - CANCELLED—
039Advisory and consultancy services relating to the distribution and transmission of energy and electricity; advisory and consultancy services relating to public utility services, namely, monitoring and controlling of power networksSECTION 71 - CANCELLED—
040Advisory and consultancy services relating to the production of energySECTION 71 - CANCELLED—
042Scientific and technological services and research and design relating thereto in the field of power generation, transmission and distribution and consumption of energy and electricity provided to public utility companies and companies in the power grid and power networks business; industrial analysis and research services in the field of power generation, transmission, consumption and distribution of energy and electricity provided to public utility companies and companies in the power grid and power networks business; design and development of real time control hardware and systems for power generators and power networks; design, development, installation, configuration, maintenance and repair of computer software for power generators and power networks; design, development, installation, configuration, maintenance and repair of constraint analysis, technical analysis and economic analysis computer software; design and development of active network management systems; conducting technical feasibility studies relating to power generation, transmission, distribution and network operation; research, design, development and implementation of advanced control systems; research, design development and implementation of advanced control computer systems for power generation, transmission, distribution and network operation; scientific and technological consultation services relating to theoretical and practical aspects of the connection and management of power generators to a computer network; scientific and technological advisory and consultancy services relating to the operational conditions for electric, gas and water utility network operationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 13, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Dec 13, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 14, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 12, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 12, 2018INPCINVALIDATION PROCESSED—
Sep 5, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 5, 2018C71TCANCELLED SECTION 71—
Oct 20, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 1, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 1, 2011FIMPFINAL DISPOSITION PROCESSED—
Aug 31, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 31, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 26, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 15, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 3, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 3, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 24, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 24, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 23, 2011NPUBNOTICE OF PUBLICATION—
Feb 4, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 2, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 1, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 10, 2010ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 3, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 2, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Oct 22, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Oct 8, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 30, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 30, 2010CNEAEXAMINERS AMENDMENT MAILED—
Sep 29, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Sep 29, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 18, 2010UNPRUNRESPONSIVE/DUPLICATE PAPER RECEIVED—
Jun 18, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 16, 2010EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Apr 26, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 23, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 2, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 2, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 1, 2010ALIEASSIGNED TO LIE—
Mar 31, 2010MAILPAPER RECEIVED—
Oct 30, 2009RFNTREFUSAL PROCESSED BY IB—
Oct 7, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 7, 2009RFRRREFUSAL PROCESSED BY MPU—
Oct 7, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 6, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 29, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 25, 2009DOCKASSIGNED TO EXAMINER—
Sep 25, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 24, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance