Drawing for E M

USPTO serial 79072393

E M

Reviewed by CopyMark Law Group

Reg. 3939900Status 404
Filing date
Status date
Registration date
Apr 5, 2011
Examiner
CORWIN, CHARLOTTE K
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with E M?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kimberly A. Eckhart

Kimberly A. Eckhart c/o WINSTON & STRAWN SELARL -25 AVENUE MARCEAU -CS 31621F-75773 PARIS CEDEX 16,

Goods and services

ClassDescriptionStatusFirst use
007Motors and engines other than for land vehicles and electric generators; replacement parts for the aforementioned machines; systems for transforming electrical energy into mechanical energy, namely, motors and engines other than for land vehicles; fuel conversion machines for transforming electrical energy into mechanical energy other than for land vehicles; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling any form of energy other than electrical energy and other than for land vehicles, namely, motors, engines, and fuel conversion machines other than for land vehiclesSECTION 71 - CANCELLED—
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling any form of energy other than electrical energy, namely, electrical transformers, electric converters, and electric variators; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling all kinds of renewable energy, namely, geothermal energy, hydraulic energy, wind energy, namely, electric accumulators, electric conduits, electric switches, and electric transformers; electricity conduits, transformers, electric switches, circuit breakers, fuses, voltage surge suppressors; electric relays; reactive power compensators being voltage regulators; condensers being capacitors; electric coils; electric converters and inverters; electric meters; electronic components for use in electric regulators, transformers, converters, and variators; semiconductors; printed circuits; electric conductors; power wires and power cables; communication wires and communication cables for electricity transmission; electronic circuit boards, electronic control panels; high-voltage equipment for converting energy, namely, circuit breakers, electrical isolating switches, lightning arresters, voltage dividers, current measure dividers for inside and outside boxes or boxes within metallic cases, namely, metal-clad boxes; medium and low voltage equipment for converting energy, namely, electric switches, electric isolating switches, electric contactors, lightning arresters, circuit breakers, fuses; transformers, electric sockets, electric plugs and other contacts being electric connections; commutators; junction boxes; circuit breakers, static and rotary convertors; energy converters; electrical resistors; rheostats; capacitors, magnets; electric conductors of all types of metal; relays, namely, remote controlled electric relays, electric relaysSECTION 71 - CANCELLED—
040Production of energy, particularly electricity; services with regard to transforming natural elements in the nature of sun, water, and wind into energy, namely, consulting services, production of wind energy, and generation of energy; provision of information in the field of production of energy; technical information and advice on the production of energy for third parties; technical information and advice regarding the operation of energy production facilities, namely, electricity, gas, and water energy production installationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 13, 2020UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Nov 15, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Nov 15, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 14, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 18, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 18, 2018INPCINVALIDATION PROCESSED—
Jul 10, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 10, 2017C71TCANCELLED SECTION 71—
Jun 26, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 14, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 17, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 25, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 25, 2011FIMPFINAL DISPOSITION PROCESSED—
Jul 5, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 5, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 26, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Mar 3, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 3, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 18, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 29, 2010NPUBNOTICE OF PUBLICATION—
Dec 16, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 14, 2010ALIEASSIGNED TO LIE—
Nov 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 19, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 19, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 19, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 2, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 30, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 30, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 30, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 1, 2009RFNTREFUSAL PROCESSED BY IB—
Nov 4, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 4, 2009RFRRREFUSAL PROCESSED BY MPU—
Nov 4, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 3, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 26, 2009DOCKASSIGNED TO EXAMINER—
Oct 13, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 9, 2009DOCKASSIGNED TO EXAMINER—
Oct 9, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 1, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance