Drawing for NEXXERGY

USPTO serial 79073908

NEXXERGY

Reviewed by CopyMark Law Group

Reg. 3943039Status 404
Filing date
Status date
Registration date
Apr 12, 2011
Examiner
HALMEN, KATHERINE E
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with NEXXERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conduction of electrical and photon energy, namely, power wires and fiber optic light and image conduits; apparatus and instruments for switching of electrical and photon energy circuits, namely, electric switches and light switches; apparatus and instruments for regulating or controlling the flow of electrical and photon energy, namely, inverters, amplifiers; electric heat sequencers, and apparatus for storing photons or ions, namely, energy storage batteries; apparatus and instruments for transforming electrical and photon energy, namely, transformers; apparatus and instruments for transformation of the state of solar energy and photon power from one state to another state, namely, photon solar modules for production of electricity, solar cells, batteries, solar wafers, semiconductorsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, scientific research and development, technology consulting and research in the fields of aerospace engineering, chemical engineering, and in the field of production of sustainable alternative energy and reduction of the use of primary energy through production of alternative energy in the nature of recuperating waste heat energy or by applying more efficient techniques for the use of energy; design for others in the fields of aerospace engineering, chemical engineering, energy related technologies; and research and design for others in the fields of energy generation engineering, energy storage engineering, aerospace engineering, and material science; industrial analysis and research services, namely, energy storage engineering, chemical engineering and aerospace engineering; scientific research in the field of material science; design and development of computer hardware; design and development of computer software in the field of the conversion of energy from one state to another, namely, wind power and solar power systems design, operation and optimization; technical planning of solar energy based power generation plants; technology consultation in the fields of technology used for manufacture and application of semiconductors, photovoltaic power, wind power, photon power, technical gases, conversion of photons to other forms of energy, transportation of photons and storage of photons; product research, development, and design in the field of industrial and technical coatingsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 12, 2020UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
Dec 20, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Dec 20, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 14, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 20, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 20, 2018INPCINVALIDATION PROCESSED—
Jul 17, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 17, 2017C71TCANCELLED SECTION 71—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 15, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 15, 2011FIMPFINAL DISPOSITION PROCESSED—
Jul 12, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 17, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 12, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 30, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 30, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 25, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 5, 2011NPUBNOTICE OF PUBLICATION—
Dec 20, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 20, 2010ALIEASSIGNED TO LIE—
Nov 29, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 29, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 29, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 29, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 19, 2010NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 9, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jun 9, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 9, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 17, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 17, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 17, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 17, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 11, 2009RFNTREFUSAL PROCESSED BY IB—
Nov 16, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 16, 2009RFRRREFUSAL PROCESSED BY MPU—
Nov 15, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 14, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 6, 2009DOCKASSIGNED TO EXAMINER—
Nov 6, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 30, 2009LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Oct 29, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance