Drawing for Serial No. 79073942

USPTO serial 79073942

Serial No. 79073942

Reviewed by CopyMark Law Group

Reg. 3943041Status 709
Filing date
Status date
Registration date
Apr 12, 2011
Examiner
MAYES, LAURIE ANN
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79073942?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kevin W. Guynn

Kevin W. Guynn Greer, Burns & Crain, Ltd.300 South Wacker DriveSuite 2500Chicago, IL 60606

Goods and services

ClassDescriptionStatusFirst use
001Chemicals used in industry, in particular in the building industry, in particular for applying floor, wall and ceiling coverings; unprocessed artificial resins, in particular for the construction industry; unprocessed plastics, in particular for the construction industry, namely, epoxy resin dispersion, epoxy resins and polyurethane based adhesives; resoluble adhesives and fixings in the nature of glue for applying floor and wall coverings; chemical binding agents for industrial use in the construction industry; chemical binding agents for use in adhesives; chemical preservatives for use in the production of a wide variety of chemicalsSECTION 71 - CANCELLED—
002Paints, varnishes, lacquers; colorants for use in the construction industry; raw natural resins for use in the manufacture of resins and for general industrial use; rust preservatives in the nature of a coating; preservatives against deterioration of wood; mordants for use in the parquet industry; primers and sealer coatings, namely, carbon-primers, multipurpose primers, 2-component epoxy primer-sealers, liquid sealer coatings, flexible sealer coatings, reactive sealer coatings all for use in the construction industry for preparing floors, ceilings and walls to be painted or coated; thinners, namely, paint thinners, adhesive thinners, cleaning thinners for primers and sealantsSECTION 71 - CANCELLED—
003Cleaning, polishing, scouring and abrasive preparationsSECTION 71 - CANCELLED—
006[ Metal building materials, namely, soffits, fascia, metal trim, screed clamps ]SECTION 71 - CANCELLED—
007[ Automatic tools and implements, namely, automatic floor scrubbing, floor sanders, floor edgers and burnishers for working floors and walls in buildings, for removing floor coverings and for laying floors, parquet flooring, tiles, concrete and screed; automatic tools and implements for working floors and floor coverings, namely, automatic floor scrubbing, floor sanders, floor edgers and burnishers ]SECTION 71 - CANCELLED—
008Hand-operated tools and implements for working floors and walls in buildings, for removing floor coverings and for laying floors, parquet flooring, tiles, concrete and screed, namely, applicator guns for adhesives, paste applicator guns and scraper rollers, hand held blade and paddle agitators for mixing, rakes, ladles; hand-operated tools and implements for working floors and floor coverings, in particular knives, hand-sanders, scrapers, trowels, doctor blades, marking tools, namely, drawknives and chalk line reels, stencils, spatulas; hand tools and hand-operated implements, in particular stirrers, doctor blades, rollers, ladles and spatulas for applying levelling compounds, primers and adhesives on floors, walls and ceilingsSECTION 71 - CANCELLED—
009[ Clothing, footwear, headgear, all being protective work clothing; welding apparatus, namely, electric arc welders, welding torches ]SECTION 71 - CANCELLED—
017Rubber sealant for caulking and adhesive purposes, gutta-percha gum, asbestos, mica for use in the construction industry; plastics in extruded form for use in manufacture; packing materials, namely, packing foam in sheet form, rubber packing for shipping containers; stopping materials, namely, adhesive sealants for general use, door stops of rubber; insulating material for use in insulating and building installations, namely, fiberglass insulation for buildings, non-metallic insulating tiles, electrical insulating materials, insulating paint, polyurethane film for use in sealing and insulating buildings; sealant compounds for joints, namely, sealants for pavements joints, pipe joint tape, jointing material for masonry; flexible pipes, not of metal; levelling agents, in particular resin-based sealants, polymer sealants and adhesive sealants for filling and levelling floors and walls; semi-processed plastics, in particular for the on-site manufacture of floors; non-metal weather strips for buildings; insulating materials; granulated cork or foam based underlays for use as insulating boardsSECTION 71 - CANCELLED—
019Non-metal building materials, namely, marble, building stone, soffits, fascia, semi-worked woods, concrete blocks, glass blocks for building, paving blocks, wood blocks, bricks, concrete posts, slabs, and panels, wood posts, slabs, and panels, logs; asphalt, pitch and bitumen, namely, bitumen based roofing sealants, bitumen asphalt, bitumen-based asphalt sealants, asphalt composition paving, asphalt roof coatings, asphalt roofing felt, asphalt roofing paper, asphalt-based roofing mastics; ceramic tiles; natural stone for use in the construction industry; resin-bonded polyester fiberboard, synthetic bases, namely, synthetic flooring materials and wall-claddings; synthetic fiber woven scrim as flooring materials, fiberglass panels and fiberglass boards for use in the building industry, polyester flooring underlays for use in the building industry, latex foam flooring underlays for use in the building industry, splittable non-woven and polypropylene boards for use in the building industry; mortar; filling and leveling dispersion materials, namely, sealants and patching compounds primarily comprised of cement, epoxy resin, and polyurethane base for preparation of floors, walls and ceilings for tile and natural stone laying; materials for repairing floors, ceilings and partitions, namely, concrete sealers containing resins, cements, mineral fillers, polymeric and copolymeric substances and combinations thereof; materials for grouting wall, ceiling and floor coverings, in particular jointing mortar, dehydrating agents, in particular for hardening and moisture-proofing of jointing mortar; uncoupling pads, namely building materials for discharging voltage in floors and walls for protection against lightning; non-woven fabric, being a component of floor covering structuresSECTION 71 - CANCELLED—
021Mixing and water buckets, cleaning sponges, scrub sponges and cleaning pads for the construction industrySECTION 71 - CANCELLED—
037[ Laying of floors and flooring; laying, maintenance, cleaning and repair of protective coatings for floors; consultancy with regard to floor laying and how to select and use adhesives for floor laying ]SECTION 71 - CANCELLED—
041[ Arranging and conducting seminars and workshops in the field of construction trade, construction machinery, chemicals used in the construction industry, adhesives for general industrial use; providing of training services in the field of computers; training in the field of personal development, namely, staff development by providing workshops in the field of customer service and personal awareness; providing online non-downloadable publications, namely, a series of books and newsletters in the field of customer loyalty systems ]SECTION 71 - CANCELLED—
042[ Industrial analysis, namely, chemical analysis; research services in the field of chemical research, mechanical engineering, research on machines, apparatus and instruments; architectural design services; quality control, namely, quality control for others; surveying; material testing; technical engineering consultancy, in particular for new projects and renovation, restoration and subsurface preparatory work for interiors and exteriors of buildings; technical project studies, namely, conducting of feasibility studies, scientific research; material testing; quality control management for others in the building trade, namely, developing voluntary standards for technology, project management and financing ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 31, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 29, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 19, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 26, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 26, 2022INPCINVALIDATION PROCESSED—
Jul 26, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 26, 2021C71TCANCELLED SECTION 71—
Apr 12, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Nov 29, 2018RNWLINTERNATIONAL REGISTRATION RENEWED—
Apr 6, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 7, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 7, 2018INPCINVALIDATION PROCESSED—
Feb 1, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 1, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 1, 201771.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 31, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 16, 2017ES71TEAS SECTION 71 RECEIVED—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 23, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 15, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 15, 2011FIMPFINAL DISPOSITION PROCESSED—
Jul 12, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 23, 2011OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 12, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 6, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 6, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jan 25, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 5, 2011NPUBNOTICE OF PUBLICATION—
Dec 17, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 17, 2010ALIEASSIGNED TO LIE—
Nov 24, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 23, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 23, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 23, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
May 25, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 25, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
May 11, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 10, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 10, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 10, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 11, 2009RFNTREFUSAL PROCESSED BY IB—
Nov 16, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 16, 2009RFRRREFUSAL PROCESSED BY MPU—
Nov 14, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 14, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 13, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 10, 2009DOCKASSIGNED TO EXAMINER—
Nov 10, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 9, 2009LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Nov 5, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance