Drawing for Serial No. 79075744

USPTO serial 79075744

Serial No. 79075744

Reviewed by CopyMark Law Group

Reg. 3876429Status 404
Filing date
Status date
Registration date
Nov 16, 2010
Examiner
MAHMOUDI, MARIAM AZIZ
Law office
MADRID PROCESSING UNIT

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79075744?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001CHEMICALS FOR USE IN INDUSTRY AND SCIENCE; CHEMICALS FOR USE IN PHOTOGRAPHY, NAMELY, PHOTOGRAPHIC CHEMICALS; CHEMICAL PREPARATIONS FOR USE IN AGRICULTURE, HORTICULTURE AND FORESTRY, NAMELY, CHEMICAL PREPARATIONS FOR THE TREATMENT OF SEEDS; UNPROCESSED ARTIFICIAL RESINS, UNPROCESSED PLASTICS; FERTILIZERS; FIRE EXTINGUISHING COMPOSITIONS; TEMPERING SUBSTANCES AND SOLDERING CHEMICALS; CHEMICAL SUBSTANCES FOR PRESERVING FOODSTUFFS; TANNING AGENTS FOR USE IN THE MANUFACTURE OF LEATHER; ADHESIVES USED IN INDUSTRYSECTION 71 - CANCELLED—
006COMMON METALS AND THEIR ALLOYS; COPPER INGOTS AND ORES; COPPER PROFILS, COPPER SHEETS, COPPER PLATES, COPPER WIRES; METAL BUILDING MATERIALS, NAMELY, SOFFITS, FASCIA; MATERIALS OF METAL FOR BUILDINGS, NAMELY, SOFFITS, FASCIA; MATERIALS OF METAL FOR RAILWAY TRACKS; NON-ELECTRIC CABLES AND WIRES OF METAL, TRANSPORTABLE BUILDINGS MADE OF METAL, RAILS MADE OF METAL; PIPES AND TUBES OF METAL; METAL SAFES; ORES, NAMELY, COPPER ORES, LEAD ORES, TIN ORESSECTION 71 - CANCELLED—
014JEWELLERY, PRECIOUS STONES; HOROLOGICAL AND CHRONOMETRIC INSTRUMENTSSECTION 71 - CANCELLED—
040MATERIAL TREATMENT AND MATERIAL PROCESSING OF ORES AND ORE CONCENTRATES, BOOKBINDING; PHOTOGRAPHIC FILM DEVELOPMENT AND PHOTOGRAPHIC PRINTING; LITHOGRAPHIC PRINTING; PRINTING; OFFSET PRINTING; PHOTOCOMPOSING SERVICES; SILKSCREEN PRINTING; LEATHER TANNING, LEATHER DYING, LEATHER ASSEMBLING; LEATHER PROCESSING; METAL TEMPERING; METAL PROCESSING; ENAMELING, NAMELY, CERAMIC GLAZING; ELECTROPLATING; GALVANIZATION; MATERIAL TREATMENT, NAMELY, PHOSPHORIZATION; CHROMIUM PLATING; ZINC PLATING; SORTING OF WASTE AND RECYCLABLE MATERIALSECTION 71 - CANCELLED—
042[ DESIGN AND DEVELOPMENT OF COMPUTER HARDWARE AND COMPUTER SOFTWARE; ] BUILDING AND CONSTRUCTION DRAFTING AND CONSULTANCY RELATING THERETO; SERVICE OF AN ARCHITECTURE, NAMELY, ARCHITECTURAL DESIGN; CHEMIST SERVICES; ENGINEERING; CHEMICAL LABORATORIES; RESEARCH AND CONSULTATION IN THE FIELD OF PHYSICS; * ALL THESE SERVICES BEING INTENDED FOR USE IN THE FIELD OF METALWORKING; * [ STORING OF COMPUTER SOFTWARE IN COMPUTER DATABANKS, NAMELY, DESIGN AND DEVELOPMENT OF SOFTWARE FOR MULTIMEDIA DATA STORING; ELECTRONICAL STORING OF COMPUTER SOFTWARE, NAMELY, RECORDING DATA FOR OTHERS ON MAGNETIC MEDIA FOR ELECTRONIC STORAGE; INSTALLATION AND MAINTENANCE OF COMPUTER SOFTWARE; DEVELOPMENT OF COMPUTER SOFTWARE; UPDATING OF COMPUTER SOFTWARE; RENTAL OF COMPUTER SOFTWARE; UPDATING OF DATABANK SOFTWARE; ] SURVEYING; SCIENTIFIC RESEARCH FOR THIRD PARTIES; [ COMPUTER RENTAL; ONLINE SERVICES, NAMELY, PROVIDING OF DATABANKS IN THE NATURE OF RENTAL OF DATABASE SERVER TO THIRD PARTIES; DEVELOPMENT, DESIGN AND HOSTING OF COMPUTER WEBSITES; ] MATERIALS TESTING; ENGINEERING IN THE FIELD OF TECHNICAL ANALYSIS FOR SCIENCE AND TECHNOLOGY; TECHNICAL DEVELOPMENT IN THE NATURE OF DESIGNING OF PRODUCTION PLANTS, MACHINERY AND APPARATUS FOR THE PROCESSING OF ORES, THE PRODUCTION AND THE PROCESSING OF METALS AND FOR THE PROTECTION OF THE ENVIRONMENTSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 26, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 19, 2020GPNXNOTIFICATION PROCESSED BY IB—
Dec 23, 2019DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 23, 2019DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 22, 2019RFNTREFUSAL PROCESSED BY IB—
May 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 6, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 8, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 8, 2018INPCINVALIDATION PROCESSED—
Feb 23, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 23, 2017C71TCANCELLED SECTION 71—
Nov 16, 2015REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 17, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 1, 2012INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 13, 2012CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jun 13, 2012LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jun 5, 2012LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 4, 2012CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 4, 2012LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 27, 2012LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Mar 26, 2012COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Mar 26, 2012PLGLASSIGNED TO PARALEGAL—
Feb 26, 2012LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jan 27, 2012LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jan 27, 2012LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 10, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 10, 2011FIMPFINAL DISPOSITION PROCESSED—
Feb 16, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 16, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 31, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 11, 2010NPUBNOTICE OF PUBLICATION—
Jul 29, 2010CNEAEXAMINERS AMENDMENT MAILED—
Jul 29, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 28, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 28, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jul 28, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 28, 2010ATRVATTORNEY REVIEW COMPLETED—
Jul 28, 2010CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Jul 23, 2010CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 2, 2010ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 2, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 2, 2010ALIEASSIGNED TO LIE—
Jun 14, 2010MAILPAPER RECEIVED—
Jan 22, 2010RFNTREFUSAL PROCESSED BY IB—
Dec 28, 2009RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 28, 2009RFRRREFUSAL PROCESSED BY MPU—
Dec 24, 2009RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 23, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 19, 2009MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 15, 2009DOCKASSIGNED TO EXAMINER—
Dec 15, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 10, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance