Drawing for BCT

USPTO serial 79076888

BCT

Reviewed by CopyMark Law Group

Reg. 3927841Status 404
Filing date
Status date
Registration date
Mar 8, 2011
Examiner
SCHRODY, ALLISON PAIGE
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BCT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Katrin Lewertoff

Katrin Lewertoff Ferdinand IP, LLC1221 Post Road East, Suite 302Westport, CT 06880UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines for the treatment, processing, and production of metals and plastics, namely, milling machines and grinding machines, and machines utilizing rotational motion for high energy surface finishing and material treatment, in particular, heavy, medium and light section rolling mills, cold and hot mills, strip and wide strip mills, plate and sheet mills, blooming, slabbing and billet mills, universal mills, planetary mills, multi-purpose cold mills, rod, bar and tube mills, continuous mills, reversing mills, pilgrim mills, detaching mills and mills for the rolling of steel, iron, aluminum and copper or for the rolling of alloys of the same, and structural replacements parts for the aforementioned rolling mills; rolling mills for wire, steel rod rolling mills, bloom rolling mills, rail rolling mills, and section rolling mills, drawing machines, wire ring presses, reeling machines; machines for manufacturing, processing and working seamless and welded pipes, namely, pipe expanding machines, large pipe manufacturing machines, hot and cold pipe rolling mills, presses, in particular, extrusion presses, impact extrusion, cold extrusion and back-flow extrusion presses, cable sheathing presses, straightening and bending presses, plate shaping presses, deep-drawing presses, multi-stage presses, hydraulic metal powder presses, and structural replacement parts therefore; forging machines, in particular, open-die forging machines, automatic forging hammers, forging presses, piercing presses and counter blow hammers, and structural replacement parts for the aforementioned forging machines; casting machines, in particular, continuous steel slab casting machines and machines for the continuous casting of metals, plastic extrusion and plastic molding machines and structural replacement parts for the aforementioned casting machines; power generation machines, namely, mobile electric power generators, steam operated power generators for rolling, pressing, forging and casting installations; hydraulic driving machines, namely, drives for vacuum pumps, driving devices for lifts; supporting chain conveyors and hoists, conveyors in the nature of roller tables and tilters, scale washers, and roller cleaning machines; conveyors for the conveying of rolled, pressed, forged and cast articles to and from rolling, pressing, forging and casting installations; welding machines, namely, laser welding machines, electric welding machines, gas welding machines, pipe welding machines, butt-welding machines, cutting machines, in particular, pipe blades, flame cutting machines; machines for filling and emptying blast furnaces; machines for tilting, pivoting, and moving converters and ladlesSECTION 71 - CANCELLED—
009Weighing, measuring, signaling, and checking apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric luminescent display panels, light emitting diode displays, liquid crystal displays, strip tension dynamometers, strip tensioning laboratory blades, strip flatness meters, thermometers, speedometers, pressure gauges, angle gauges, distance meters, roughness gauges, electric and electronic control devices, namely, flatness control, roughness control, pressure control and tensioning control for influencing the properties of rolled steel; control panels for rolling mills, electrical and magnetic detectors for monitoring the properties of rolled steel; frequency meters; apparatus for recording, transmission or reproduction of sound or images, namely, signal transmitters; calculating machines; data processors and computers for use in operating and controlling operations of metallurgical plants and rolling mills; non-blank magnetic recording carriers, namely, prerecorded magnetic data carriers featuring software for controlling rolling mills, furnace plants, continuous casting machines; computers featuring programs for controlling rolling mills, furnace plants, continuous casting machines; computer programs for controlling and regulating machines for the metallurgical industry, machines for the steel industry, continuous casting machines, rolling machines, forging machines, pressing machines and machines for processing synthetic materials, and machines tools stored on data carriersSECTION 71 - CANCELLED—
011Cooling systems comprised of industrial water recirculation cooling and heating systems for rolling, pressing, forging and casting installations, comprising heat insulation, water roll coolers, strip preheaters, spray water cooling sections sprayers, furnaces, cooling towers, cooling fans, scarfing and flame cutting, slab cooling wheels for pressing, forging and casting installations; cooling apparatuses for rolling stock, rolling mills and continuous casting machines, namely, water sprayers, air coolers; air coolers for metallurgical plants, steel mills, continuous casting plants, rolling mills and forging and pressing plantsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 28, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Aug 28, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
Feb 18, 2020IRIVIRREGULARITY ON INVALIDATION RECEIVED FROM IB—
Jan 31, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 31, 2020INPCINVALIDATION PROCESSED—
Jan 7, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 8, 2019NC71NOTICE OF CANCELLATION SEC. 71 E-MAILED—
May 7, 2019C71TCANCELLED SECTION 71—
May 6, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 2, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 14, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 22, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 30, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 26, 2018PCDEPETITION TO DIRECTOR DENIED—
Sep 18, 2018APETASSIGNED TO PETITION STAFF—
May 14, 2018TPDRTEAS PETITION TO DIRECTOR RECEIVED—
Mar 15, 2018PRANPOST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED—
Dec 6, 2017EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Nov 7, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 6, 2017PR71POST REGISTRATION ACTION MAILED - SEC.71—
Jun 5, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 18, 2017ES71TEAS SECTION 71 RECEIVED—
Mar 24, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 8, 2016REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Feb 9, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 24, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 20, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 20, 2011FIMPFINAL DISPOSITION PROCESSED—
Jun 8, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 8, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 21, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 21, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 17, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 15, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 4, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 4, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 4, 2010ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Oct 3, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Oct 3, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 3, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 10, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 10, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 10, 2010ALIEASSIGNED TO LIE—
Aug 24, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 24, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 24, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 30, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 29, 2010CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Mar 26, 2010CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 1, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 1, 2010RFRRREFUSAL PROCESSED BY MPU—
Feb 27, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 26, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 26, 2010RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Feb 26, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 25, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 19, 2010DOCKASSIGNED TO EXAMINER—
Jan 12, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 6, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 31, 2009REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance