Drawing for EXCENT A PERFORMANCE PARTNERSHIP BY AREVA

USPTO serial 79077943

EXCENT A PERFORMANCE PARTNERSHIP BY AREVA

Reviewed by CopyMark Law Group

Reg. 4061923Status 404
Filing date
Status date
Registration date
Nov 29, 2011
Examiner
SNYDER, NELSON B
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EXCENT A PERFORMANCE PARTNERSHIP BY AREVA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Services for the building, installation and maintenance of infrastructure, factories, plants, equipment and apparatus in the energy field; construction, installation and maintenance of mines, factories and centers for the storage, processing, reprocessing and recycling of fuels, ores, nuclear materials, uranium and plutonium; construction, installation and maintenance of nuclear power plants, nuclear reactors, non-nuclear boilers, factories for the production, transport and supply of electricity; installation and maintenance of installations and equipment for conducting research and equipment for conducting engineering services in the fields of energy, renewable energy and efforts to combat climate change; construction, installation and maintenance of installations and equipment used for transporting materials in the field of nuclear energy; mining extraction of uranium deposits, mining extraction, extraction of uranium, and extraction of nuclear materials; inspection services carried out in the course of construction of nuclear power plants, stations, substations, and sites for the production, transport and distribution of electricity; building of electrical power transmission and distribution lines; inspection services carried out in the course of construction of nuclear power plants and in the course of overseeing of building construction work; providing construction information in the fields of renewable energy and efforts to combat climate change; the cleaning, sanitation, maintenance and renovating of mining sites, nuclear installations, nuclear equipment and apparatus; maintenance of soil in the nature of soil erosion control servicesSECTION 71 - CANCELLED—
039Energy transport in the nature of transportation of fuels for making energy ; Energy distribution; operation and management for third parties of power transport and distribution networks, namely, distribution of energy, supply chain, logistics and reverse logistics services involving the storage and distribution of energy as well as the transportation of fuels for making energy, all for third parties; providing information and consulting in connection with energy transport and distribution; garbage collection in the nature of transport by air, land and water of waste fuels, ores, nuclear materials, uranium, plutonium and nuclear waste; warehousing and storage of fuels, ores, nuclear materials, uranium, plutonium and nuclear waste; energy storage; storage of energy from hydrogenSECTION 71 - CANCELLED—
040Energy production and storage; nuclear energy production; production and conversion and storage of energy from hydrogen; production of renewable energy, namely, from biomass, biogas, mine gases, heat recovered in industry, wind, water, solar energy; energy production, namely, via microhydraulic plants, hydroelectric plants and through devices for converting wave energy; services for the treatment, reprocessing, isotopic separation, recycling and processing of fuels, ores, materials used in the field of nuclear energy, nuclear materials, uranium, plutonium and nuclear waste; services in the nature of industrial toxic waste disposal for the clean-up of soils and mining sites, nuclear installations, equipment and apparatus in the nuclear field; services in the nature of industrial toxic waste disposal for the disposal, incineration and elimination of waste, radioactive waste and spent fuels; grouping of materials, namely, sorting of waste materials to order for third parties; treatment of materials in the field of energySECTION 71 - CANCELLED—
042Engineering, engineering services, laboratory research and scientific and technological project management in the nature of conducting scientific research in the energy and electronics sectors; engineering services, technical assistance in the nature of engineering services, laboratory work and scientific and technological project management in the nature of conducting scientific research in the field of energy; research work, development work, analyses, feasibility studies and design in the field of energy; engineering consulting, expert feasibility studies and testing of materials in the field of energy; simulation and monitoring in the field of energy in the nature of technical verification of power systems designs; services for scientific and industrial research, design, studies, expert reports, consulting and providing scientific research information in connection with environmental protection, sustainable development, renewable energy and efforts to combat climate change; services in the nature of scientific study and research on the prevention of pollution risks in connection with activities conducted in the energy and electronics fields; environmental auditing services in the nature of environmental testing and inspection of sites, installations and equipment in the fields of energy and electronics; design, programming, updating, maintenance and rental of software used in the field of energy, namely, in the fields of renewable energy and efforts to combat climate change, and electronics; conducting scientific studies for turnkey projects relating to stations, substations and centers for the production, transport and distribution of electrical energy; conducting scientific studies for turnkey projects relating to power plants for the production of energy from biomass or biogas; chemistry research in the energy and electronics sectors; professional scientific and engineering consultancy and drafting of engineering plans for others in the field of energy; prospecting of nuclear materials; dosimetry monitoring of nuclear materials, nuclear installations and equipment; testing of security systems and technical air quality monitoring of mines, factories and centers as regards the warehousing, storage, processing, isotopic separation, reprocessing and recycling of fuels, ores, materials used in the nuclear field, nuclear materials, uranium, plutonium and nuclear wastes, nuclear power plants, and nuclear reactors; analysis, concept design, development of information systems and information technologiesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 11, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Dec 11, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
May 17, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 12, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 12, 2019INPCINVALIDATION PROCESSED—
Mar 6, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 6, 2018C71TCANCELLED SECTION 71—
Nov 29, 2016REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 19, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 13, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 13, 2012FIMPFINAL DISPOSITION PROCESSED—
Feb 29, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 29, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 19, 2011GPNXNOTIFICATION PROCESSED BY IB—
Sep 13, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 13, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 24, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 24, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 9, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 8, 2011ALIEASSIGNED TO LIE—
Aug 1, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 11, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 11, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 11, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 27, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2011DOCKASSIGNED TO EXAMINER—
Mar 28, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 28, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 28, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 2, 2010ATRVATTORNEY REVIEW COMPLETED—
Dec 2, 2010CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Oct 27, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 18, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 17, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 16, 2010RINXUSPTO CORRECTION PROCESSED BY IB—
Oct 15, 2010CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 2, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 1, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 1, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 2, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 3, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 3, 2010RFRRREFUSAL PROCESSED BY MPU—
Mar 3, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 1, 2010DOCKASSIGNED TO EXAMINER—
Feb 9, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 5, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 4, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance