USPTO serial 79078797
LOGOTHERM
Reviewed by CopyMark Law Group
Reg. 4085652Status 404
- Filing date
- Status date
- Registration date
- Jan 17, 2012
- Examiner
- HOFFMAN, DAVID AARON
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with LOGOTHERM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
04827 Gerichshain, DE
04827 Gerichshain, DE
04827 Gerichshain, DE
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; pipes and tubes of common metal; unworked and semi-worked common metals and simple metal goods made therefrom for use with pipelines, namely, fluid storage tanks, branching tubes for piping, namely, T pieces and cross pieces as pipe junctions, preformed pieces, namely, pipe bends, angled pipes, pipe fittings and base plates and support frames as parts of pipelines for connecting and supporting pipe systems, metal junctions for pipelines, metal valves not being parts of machines; metal gaskets and aluminum sealing tapes for heating, sanitary, solar, air conditioning installations, frames of metal for building | SECTION 71 - CANCELLED | — |
| 007 | Motors except for land vehicles; machine coupling and transmission components except for those for land vehicles; taps and valves being parts of machines, motors and drives; fittings for machines | SECTION 71 - CANCELLED | — |
| 011 | Heating installations and parts therefor, in particular apparatus for heating, refrigerating, drying, ventilating and water supply, boilers, hot water cylinders, indirectly heated service water heaters, instantaneous district heating apparatus for service water, pipes being parts of water heating systems, as well as district heating house substations and radiator accessories, assemblies for connecting radiators and panel heating systems to heating and district heating installations; sanitary installations in the nature of baths, washrooms, public shower installations, steam rooms, toilet installations and parts thereof, in particular water heaters, hot water cylinders for baths, washrooms and toilets and bath cubicles, shower cubicles and toilet bowls with accompanying parts for installation; pipes and pipelines being parts for heating and sanitary installations, namely, flexible pipes for drinking water and heating installations; fittings for water supply in buildings and real estate, namely, valves, taps, water draining fixtures and water supply fixtures; plumbing fittings, namely, quick-release couplings and screw fittings for water pipes and units, namely, boilers, air conditioners, heat pumps, solar heating collectors, water heaters; taps, valves and regulating accessories for water and gas apparatus and pipes, namely, mixing valves; fittings being parts for heating installations and for pressure regulation of heating installations; pressure regulators, in particular differential pressure regulators for heating installations; line regulating valves for heating and sanitary installations for hydraulic balancing. fittings for regulating radiators, namely, thermostat valves, fittings; distribution fittings for heating installations, namely, pump groups consisting of pumps, valves and shut-off valves; solar collectors and hot water cylinders being parts of solar installations; heat pumps for room heating and/or the heating of liquids; ironmongery and small items of metal hardware, namely, clamps, supports, brackets, screws, bolts, nuts being parts for heating or sanitary installations; Components being designed as quick assembly systems heating, sanitary, solar and air conditioning installations for distributing, collecting and conveying media, comprising vessels and tanks, manifolds, pumps, pump groups including pumps, valves and shut-off valves, branches and piping for heating, steam generating, cooking, refrigerating, drying, ventilating and water supply and sanitary installations | SECTION 71 - CANCELLED | — |
| 017 | Plastic products for use in manufacture, packing, stopping and insulating materials, in particular insulating materials and insulating materials for heat insulation; flexible pipes, not of metal; sealant compounds for joints, plastic pipe gaskets; junctions not of metal for flexible plastic pipes and tubes | SECTION 71 - CANCELLED | — |
| 037 | Construction consultancy; construction and repair of heating, steam generating, cooking, refrigerating, drying, ventilating and water supply and sanitary installations in buildings; construction of firing installations, namely, boilers; construction of industrial furnaces; insulation construction, namely, installation of insulation in technical systems and their parts; installation of insulation in buildings; chimney construction; construction planning; technological services, namely, construction planning and consultancy | SECTION 71 - CANCELLED | — |
| 042 | Engineering services, particularly technical project planning and design engineering of heating and sanitary systems; engineering services | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Meibes System-Technik GmbH
- Other trademarks owned by Meibes System-Technik GmbH
- Other trademarks owned by Meibes System-Technik GmbH
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 017
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named LOGOTHERM
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 24, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Apr 24, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jul 12, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| May 17, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 17, 2019 | INPC | INVALIDATION PROCESSED | — |
| Apr 24, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 24, 2018 | C71T | CANCELLED SECTION 71 | — |
| Oct 10, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 31, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 15, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 15, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 17, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 17, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 30, 2011 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 4, 2011 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 1, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 12, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 12, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Oct 12, 2011 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 26, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 24, 2011 | ALIE | ASSIGNED TO LIE | — |
| Sep 13, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 12, 2011 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 9, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 9, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 8, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 8, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 8, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2011 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 27, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 27, 2011 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 8, 2011 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 7, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 10, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 9, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 9, 2011 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 9, 2011 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 23, 2010 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 22, 2010 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 1, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 1, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 1, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 1, 2010 | PETG | PETITION TO REVIVE-GRANTED | — |
| Dec 1, 2010 | PROA | TEAS PETITION TO REVIVE RECEIVED | — |
| Oct 21, 2010 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Oct 21, 2010 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Apr 2, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 8, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 8, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 6, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 5, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 2, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 26, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 26, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 25, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |