Drawing for HATICON

USPTO serial 79078962

HATICON

Reviewed by CopyMark Law Group

Reg. 3882724Status 709
Filing date
Status date
Registration date
Nov 30, 2010
Examiner
POLZER, NATALIE M
Law office
—

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HATICON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John Christopher

John Christopher CHRISTOPHER & WEISBERG, P.A.1232 N. University DrivePlantation, FL 33322UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Transportable structures made of metal; building materials made of metal, namely, soffits and fascia; fixing material made of metal, namely, nails, bolts and screws; scaffoldings, racks, posts, poles and masts, profiles and frames, each made of metal and used for supporting photovoltaic and thermal solar arrays and used on roofs and facades; power supply-line masts made of metal; roofing made of metal; heating, ventilating and air-conditioning ducts and tube joints made of metalSECTION 71 - CANCELLED—
009[ Photovoltaic devices and plants made thereof, namely, photovoltaic cells, modules and including solar thermal collectors for the generation of energy and electronic cables sold as a unit; electrical controlling and regulating devices for solar plants and photovoltaics both for internal flow of operations and for positioning control of the collectors and modules ]SECTION 71 - CANCELLED—
011[ Solar-thermal power plants, primarily consisting of solar collectors with electronic devices, pumps and ducts made of metal for heating purposes; heating installations, air-conditioning plants, air heaters, heating solar collectors, solar furnaces, heat pumps, heat accumulators, heat exchangers not being parts of machines and heating boilers for power stations; gas burners; regulating and safety accessories, namely, hydraulic compensators, meter valves and power failure backup safety lighting, all for water heaters and pipes, solar collectors, heating installations, heat pumps, heat accumulators, heat exchangers not being parts of machines, and heating boilers ]SECTION 71 - CANCELLED—
037[ Installation, maintenance and repair of solar and heating installations, machines and their parts for the generation of regenerative sun, wind, geothermal power energy and for the processing of biomasses for the generation of energy; roofing services; carpentry work ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 17, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jun 9, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 8, 2022INPCINVALIDATION PROCESSED—
Apr 16, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 11, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 11, 2021C71TCANCELLED SECTION 71—
Nov 30, 2019REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Nov 7, 2019RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 17, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 20, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 13, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 8, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 8, 2018INPCINVALIDATION PROCESSED—
Feb 27, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 27, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 27, 201771.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Jun 27, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 1, 2017CHLDCHANGE OF OWNER RECEIVED FROM IB—
May 24, 2017ES71TEAS SECTION 71 RECEIVED—
May 24, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 13, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 19, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 19, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 17, 2012ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 31, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 31, 2011FIMPFINAL DISPOSITION PROCESSED—
Feb 28, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 30, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 14, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 14, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 11, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 11, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 10, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 10, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 10, 2010ALIEASSIGNED TO LIE—
Jul 27, 2010ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 27, 2010REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 27, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 16, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 17, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 17, 2010RFRRREFUSAL PROCESSED BY MPU—
Mar 17, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 16, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 9, 2010DOCKASSIGNED TO EXAMINER—
Mar 9, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 4, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance