Drawing for Serial No. 79079017

USPTO serial 79079017

Serial No. 79079017

Reviewed by CopyMark Law Group

Reg. 4412593Status 404
Filing date
Status date
Registration date
Oct 8, 2013
Examiner
STEEL, ALYSSA PALADINO
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79079017?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alex Patel

Alex Patel Patel & Almeida, P.C.16830 VENTURA BLVDSTE 360Encino, CA 91436

Goods and services

ClassDescriptionStatusFirst use
001Chemicals for use in industry and science; photographic chemicals, chemicals used in agriculture, horticulture and forestry, except fungicides, herbicides, insecticides and parasiticides; unprocessed artificial resins, unprocessed plastics; soil fertilizers; fire-extinguishing preparations; tempering and soldering preparations, namely, metal tempering preparations and soldering chemicals; adhesives used in industrySECTION 70 - CANCELLED—
004Industrial oils and greases; industrial lubricants; dust absorbing, wetting and binding compositions for use on thermosolar and photovoltaic solar installations and solar plants; fuels; renewable energy, namely, solar energy, namely, solar energy illuminantsSECTION 70 - CANCELLED—
006Common metals and their alloys for further manufacture; metal building materials, namely, metal structures for mounting solar installations, metal mounting frames for solar installations, for solar modules and collectors, metal base structures for thermosolar and photovoltaic installations, substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors; portable metal buildings; metal materials for railway construction; nonelectric cables and wires of common metal; ironmongery and small items of metal hardware, namely, modules and laminates, profiles, profile frames, frameworks, racks, supports, connections, fastenings, mounts and brackets for arranging and installing solar installations, solar modules, solar collectors and solar cells; metal tubes and pipes; metal safes; goods of common metal not included in other classes, namely, roof structures, namely, metal roof trusses, metal roof flashings, of metal, for roofs, roof gullies and roof tiles of metal, metal roofs, namely, with integrated solar cells, solar modules and solar collectors; copper, iron, lead and tin oresSECTION 70 - CANCELLED—
007Machines and machine tools for the cutting and forming of materials; motors and engines except for land vehicles; machine couplings and transmission components except for land vehiclesSECTION 70 - CANCELLED—
008Hand-operated tools and structural parts therefor for the manufacture and installation of thermal and photovoltaic solar installations and parts of thermal and photovoltaic solar installations; safety razorsSECTION 70 - CANCELLED—
009Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signaling, checking and supervising, life-saving and teaching apparatus and instruments, namely, solar concentrators in the nature of lenses, fresnel lenses, optics for concentrating solar energy, secondary concentrating receiver optics, lightguides, optical reflectors, solar ray reflectors, photovoltaic solar modules for converting electronic radiation to electrical energy, solar cells, solar collectors, namely, photovoltaic cells also including a solar thermal collector sold as a unit, solar hybrid installation, namely, apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules, solar trackers in the nature of single axis solar trackers, two-axis solar trackers, solar panels for production of electricity, solar tubes, namely, photoelectric tubes, trough collector tubes, solar panel arrays for production of electricity, optical lenses, electronical sensors for measuring and sensing solar radiation; apparatus and instruments for conducting, distributing, converting, storing, regulating or controlling electricity, namely, solar converters in the nature of photovoltaic thermoelectric converters, solar inverters in the nature of photovoltaic inverters, solar power installations in the nature of solar modules for production of electricity; solar cell connectors, in the nature of photovoltaic cell connectors, photovoltaic solar modules, current transformers in the nature of electrical transformer; electric circuits for solar cells and solar elements, solar batteries, solar chips; solar powered apparatus for recording, transmitting, reproducing sounds or images; blank magnetic data carriers and record discs; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines; data processing equipment and computers; fire extinguishersSECTION 70 - CANCELLED—
011Apparatus for lighting, heating, steam-generating, cooking, refrigerating, drying, ventilating, water supply and sanitary installations, namely, steam generators, parabolic mirrors designed for the collection of solar energy, solar collectors, solar energy based cooling apparatus, solar energy receivers, solar heat collection panels, solar reactors, solar thermal air systems for heating purposes, solar thermal installations, namely, solar thermal modules, solar thermal based power plants, solar photovoltaic power plants, solar energy heaters, namely, solar energy based heating apparatus, solar powered cooling units, solar thermal energy collectors, solar heating boilers, solar heat exchangers not being parts of machines, solar absorbers, in the nature of solar energy receivers, solar selective layers for heating, namely, solar absorbent coatings, solar heat accumulators, solar heat storage equipment, namely, solar heat storage tanks for steam energy storing, heat pumpsSECTION 70 - CANCELLED—
017Rubber, gutta-percha, gum in the nature of natural rubber, asbestos, mica and goods made from these materials and not included in other classes, namely, plastic film for use in the production of solar collectors, solar cells, solar thermal collectors and photovoltaic modules, solar control films; goods of semi-processed plastics, namely, semi-finished plastic films and sheets to be used in solar collectors, solar cells, solar thermal collectors and photovoltaic modules; packing, stopping and insulating materials, namely, building insulation, insulating fabrics and coatings and packing foam in sheet form, substrates primarily of ceramic, silicon and non-metals for electrical or thermal insulation of solar cells, photovoltaic cells, and solar collectors, protective insulating sheeting for protection of solar cells; non-metallic flexible pipesSECTION 70 - CANCELLED—
019Non-metal building materials, namely, structural members, not of metal, for photovoltaic, for solar thermal and solar installations; non-metal building materials and structural members, not of metal, namely, for solar cells, solar modules and solar collectors; non-metal roof coverings with integrated solar cells, solar modules and solar collectors; non-metal structures for mounting solar panels; non-metal frameworks and building structures, all of concrete, plaster, wood, porous earthenware and stoneware, stone, artificial stone, plastic, glass, asphalt, pitch, bitumen and mixed products consisting of these materials, for the construction, installation and integration of solar mirrors, solar collectors, solar cells, solar modules and solar installations; non-metallic rigid pipes for containing liquids for building; asphalt; pitch and bitumen; non-metallic transportable buildings; monuments of stone; concrete and marbleSECTION 70 - CANCELLED—
020Furniture, mirrors, picture frames; goods, not included in other classes, of wood, cork, reed, cane, wicker, horn, bone, ivory, whalebone, shell, amber, mother-of-pearl, meerschaum and substitutes for all these materials or plastics, namely, non-metal solar panel mountsSECTION 70 - CANCELLED—
035Advertising services; business management; business administration; providing office functions; business management and organization consultancy; market research studies; import agency services in the field of energy, solar energy, solar installations and solar installation parts; advertising and marketing services; retail store services in relation to sale of energy, solar energy, solar installations and solar installation partsSECTION 70 - CANCELLED—
037Construction, repair, installation and maintenance services, namely, construction, repair, installation and maintenance of industrial plants for the production of energy, solar installations and solar installation partsSECTION 70 - CANCELLED—
039Transport, storage and distribution services, namely, transport, storage and distribution of energySECTION 70 - CANCELLED—
040Material treatment services, namely, generation of electricity from solar energy; energy production servicesSECTION 70 - CANCELLED—
042Scientific and technological services and related research and design services, namely, scientific research and development and product research and development; industrial analysis and research services in the fields of solar energy technology; Architectural engineering services; computer and software design and developmentSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jan 8, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 8, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 21, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 8, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 8, 2014FIMPFINAL DISPOSITION PROCESSED—
Jan 8, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 8, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 22, 2013GPNXNOTIFICATION PROCESSED BY IB—
Jul 23, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 23, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 3, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 3, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 3, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 19, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 19, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 30, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 30, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 30, 2013TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 14, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2012DOCKASSIGNED TO EXAMINER—
Oct 22, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 22, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 23, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 22, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 29, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 30, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 29, 2012GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 29, 2012GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 29, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 2, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Jan 2, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 2, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 2, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 21, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 21, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 10, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 10, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
May 9, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 9, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 4, 2011ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 18, 2011PBTQWITHDRAWN FROM PUB OTQR REQUEST—
Mar 7, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 6, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 24, 2011ALIEASSIGNED TO LIE—
Feb 16, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 22, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 22, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 22, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 22, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 22, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 22, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 19, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 16, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 16, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 16, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 14, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 29, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 29, 2010RFRRREFUSAL PROCESSED BY MPU—
Mar 27, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 26, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2010DOCKASSIGNED TO EXAMINER—
Mar 13, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 9, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 4, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance