Drawing for SUZLON

USPTO serial 79079172

SUZLON

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
ROSSMAN, WILLIAM M
Law office
TMEG LAW OFFICE 109 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SUZLON?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Wind mills, wind power plants, wind turbines and other wind-operated machines; parts and fittings for the aforesaid goods; wind turbine towers and turbine masts, turbine arms, turbine cores, turbine housings, machine bases, rotary mechanisms, turning rings and gears; devices for rotating turbine arms, brakes and retarders, main axles, universal tubes, transmission components, couplings and electric generators and back-up wind power plants; parts and fittings for the aforesaid goodsSECTION 70 - CANCELLED—
009Electric and electronic equipment and computer equipment for wind turbines, wind power plants and other wind-powered machines; checking and monitoring equipment, including for the automatic power up and power down of generators, and for automatic starting after a general power failure, surge protection apparatus to protect against lightning strikes, microprocessor equipment for the checking and monitoring of voltage regulation, frequency, phase state, rotor speed, checking the efficiency and thickness of brake pads, temperature, wind direction and wind speed, vibration sensors for mounting on windmill housings, watt-hour meters; microprocessor equipment for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, temperature, wind direction and wind speedSECTION 70 - CANCELLED—
037Erection, installation, maintenance and repair of wind turbines, wind stations and other wind-powered machines; assistance, consultancy and information in connection with the aforesaid goods and servicesSECTION 70 - CANCELLED—
040Fabrication of wind turbines, wind stations and other wind-powered machines; consultancy and information in connection with the fabrication of wind turbines, wind stations and other wind-powered machinesSECTION 70 - CANCELLED—
042Technical assistance, consultancy and information relating to wind turbine and wind power projects, and implementation of the aforesaid projects; development and testing of wind turbines, wind power plants, wind-powered machines and components therefor; conducting research projects in relation to wind turbines, wind power plants and other wind-powered machines, and assistance, consultancy and information with regard to the development and testing of wind turbines, wind power plants, wind-powered machines and components therefor; technical consultancy and information relating to the design of wind turbines, wind stations and other wind-powered machinesSECTION 70 - CANCELLED—
045Legal services, consultancy and information in relation to wind turbine and wind power projects, and implementation of the aforesaid projects, and in connection with the development and testing of wind turbines, wind power plants, wind-powered machines and components therefor, and in connection with conducting research projects in relation to wind turbines, wind power plants and other wind-powered machines; legal services, consultancy and information in connection with the development and testing of wind turbines, wind power plants, wind-powered machines and components therefor, and in connection with the setting up, construction, installation, maintenance and repair of wind turbines, wind power plants and other wind-powered machinesSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 6, 2020UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN—
May 9, 2020DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
May 8, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 31, 2012CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 16, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Oct 29, 2011FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 11, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 11, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 10, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 10, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Feb 14, 2011CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Feb 11, 2011CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Nov 19, 2010ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Oct 12, 2010MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 11, 2010ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 9, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 15, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 15, 2010RFRRREFUSAL PROCESSED BY MPU—
Mar 14, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 13, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 13, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 9, 2010DOCKASSIGNED TO EXAMINER—
Mar 9, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 4, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance