USPTO serial 79079317
HOUDINI
Reviewed by CopyMark Law Group
Reg. 4008110Status 404
- Filing date
- Status date
- Registration date
- Aug 9, 2011
- Examiner
- HOLTZ, ALLISON
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with HOUDINI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipes, pipework and tubes of metal, metal products, namely, metal bolts and metal beams, metal liners and casings for use in oil, gas and water wells and boreholes; metal sleeves and sliding metal sleeves for affixing screws; metal well bore and borehole liners and casing; metal parts, fittings and accessories for the aforesaid goods | SECTION 71 - CANCELLED | — |
| 007 | Articles, tools, machines and apparatus for drilling, completing and producing fluids from oil, gas, condensate and water wells, well bores and boreholes and for intervention in wells, well bores and boreholes, namely, oil-well pumping machines, boring machines and drilling rigs; articles, tools, machines and apparatus for use in drill, completion, intervention and production strings, namely, rock drills, articles, tools, machines and apparatus for cementing oil, gas, condensate and water wells, well bores and boreholes, namely, drilling rig mechanical handling machines; downhole cementing tools, namely, cemented carbide cutting tools and cemented carbide tips; flow control and flow circulation tools, namely, pump control valves; subsurface valves being part of machines; parts, fittings and accessories for the aforesaid goods | SECTION 71 - CANCELLED | — |
| 009 | Articles, tools, machines and apparatus, namely, oil and gas well downhole survey and measurement equipment for drilling, completing, intervening in and producing fluids from oil, gas, condensate and water wells, well bores and boreholes; downhole tools actuated by RFID, namely, RFID readers; downhole cementing tools, namely, cement testing machines; sliding sleeves, namely, junction sleeves actuated by use of RFID; RFID tags; radio frequency controllers; data recording apparatus and sensors; parts, fittings and accessories for the aforesaid goods | SECTION 71 - CANCELLED | — |
| 037 | Downhole services relating to oil, gas, condensate and water wells, well bores and boreholes, namely, drilling, intervention in the nature of performing procedures that alter the productive state of the wells or alter the geometry of the wells, pumping, and cementing services; hydraulic fracturing of subsurface geologic formations to enhance well production; casing and lining of well bores, boreholes and oil, gas and water wells; inspection in the course of constructing oil sites; maintenance, installation, repair, deployment in the nature of rapid response engineering and manufacturing services to the oil and gas industry, refurbishment and rental of oil, gas and water field exploration and exploitation equipment, apparatus, tools, instrumentation, machines and articles; on-site and off-site inspection in the course of constructing pipes; maintenance, installation, repair, refurbishment and rental of pipes, tubulars, articles, tools, machines and apparatus for drilling, completing, intervening in, cementing and allowing production from boreholes, well bores and oil, gas and water wells; on-site and off-site inspection in the course of constructing water field equipment; on-site and off-site inspection in the course of constructing borehole structures, maintenance, installation, repair, refurbishment and rental of manmade structures used in or around boreholes, well bores and oil, gas and water wells, well bores and boreholes; provision and deployment of coiled tubing for pumping, cementing, fracturing and acidising oil, gas and water wells, well bores and boreholes; information, advisory and consultancy services in relation to the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Engineering services relating to oil, gas, condensate and water field exploration and exploitation in the nature of extraction; design of computer software relating to oil, gas, condensate and water field exploration and exploitation in the nature of extraction; consultancy services, namely, technology consultancy relating to oil, gas, condensate and water field exploration and exploitation in the nature of extraction; oil, gas and water field exploration services; information, advisory and consultancy services in relation to the aforesaid services | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Petrowell Limited
- Other trademarks owned by Petrowell Limited
- Other trademarks owned by Petrowell Limited
- Other trademarks owned by Weatherford Technologies Holdings LLC
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named HOUDINI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 24, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 24, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 4, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 1, 2018 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 1, 2018 | INPC | INVALIDATION PROCESSED | — |
| Nov 16, 2018 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 16, 2018 | C71T | CANCELLED SECTION 71 | — |
| Oct 19, 2017 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Apr 7, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Mar 28, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 9, 2016 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 30, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 25, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 15, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 15, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 14, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 14, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 9, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 9, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 12, 2011 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 24, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 24, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 4, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 4, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 18, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 18, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 30, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 30, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 24, 2011 | ALIE | ASSIGNED TO LIE | — |
| Mar 16, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 21, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 20, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 20, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 16, 2010 | FAXX | FAX RECEIVED | — |
| Sep 16, 2010 | FAXX | FAX RECEIVED | — |
| Apr 30, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 23, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 23, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 23, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 22, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 19, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 15, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 15, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 11, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |