Drawing for MIRAX GROUP

USPTO serial 79079783

MIRAX GROUP

Reviewed by CopyMark Law Group

Reg. 3879361Status 404
Filing date
Status date
Registration date
Nov 23, 2010
Examiner
VENGROFF, MARILYN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with MIRAX GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
037Construction of buildings; repair of buildings; installation services for installing of elevators and lifts; repair services for premises, namely, the repair of buildings; laying, repair and renewal of conduits and pipework in the building sector; laying, repair and replacement of gas and water pipes; paper hanging; painting or repair of signs; installation and repair of warehouses; cleaning of buildings both interior and exterior surfaces; sand-blasting for removal of stains at buildings construction and repair; supervising and directing of construction work; roofing services for buildings; installation, assembly and repair of electrical conduits, water systems, of sanitary installations, heating and gas in buildings, air-conditioning apparatus, lifts, fire alarms, alarms, and telephones, and kitchen equipment; installation, repair and maintenance of machine equipment for construction of buildings; interference suppression in electrical apparatus; electric appliance installation and repair; asphalting; plumbing; damp-proofing of building's interior and refurbishing in the nature of construction and repair of buildings; disinfecting; rat exterminating; installation of building insulation; bricklaying; riveting; varnishing; painting of interior and exterior of buildings; road surfacing; scaffolding erection; demolition of buildings; street cleaning; chimney sweeping; boiler cleaning and repair; plastering; repair information; construction information; rental of cranes in the nature of construction site machines; rental of road sweeping machines; rental of construction equipment; rental of excavators and bulldozersSECTION 71 - CANCELLED—
043Hotel services; providing of food, drinks, and meals; cafe-restaurantsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 27, 2018DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jul 27, 2018DETHDEATH OF INTERNATIONAL REGISTRATION—
Apr 6, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Mar 13, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 13, 2018INPCINVALIDATION PROCESSED—
Feb 28, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 30, 2017C71TCANCELLED SECTION 71—
Apr 21, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 16, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 16, 2011FIMPFINAL DISPOSITION PROCESSED—
Feb 23, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 23, 2010R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 7, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 18, 2010NPUBNOTICE OF PUBLICATION—
Jul 30, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 30, 2010ALIEASSIGNED TO LIE—
Jul 15, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 5, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 4, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 4, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 23, 2010RFNTREFUSAL PROCESSED BY IB—
Mar 26, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 26, 2010RFRRREFUSAL PROCESSED BY MPU—
Mar 26, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 25, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 19, 2010DOCKASSIGNED TO EXAMINER—
Mar 19, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 18, 2010SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance