Drawing for SPIRAX SARCO

USPTO serial 79080768

SPIRAX SARCO

Reviewed by CopyMark Law Group

Reg. 3927907Status 706Registered
Filing date
Status date
Registration date
Mar 8, 2011
Examiner
STEIN, JAMES W
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SPIRAX SARCO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Anna King

Anna King Banner & Witcoff, Ltd.71 South Wacker Drive, Suite 3600Chicago, IL 60606UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001[ Water treatment chemicals for industrial and commercial use ]SECTION 71 - CANCELLED
007Steam traps; valves, hydraulic and pneumatic valve actuators, filters, strainers and pumps, all being machines or parts of machines; separators for separating fluids, condensation, gases and steam, and air compressors; lubricators and regulators all being parts and fitting for machines; steam producing apparatus being parts of machines; structural parts and fittings for all the aforesaid goodsACTIVE
009Electronic control, metering, monitoring, regulating and checking apparatus and instruments for fluids, condensation, gases and steam; sight glasses and check valves fitted with sight glasses; automatic valves; pressure and temperature gauges; and structural parts and fittings for all the aforesaid goodsACTIVE
011Heating, steam generating, cooling, ventilating and compressed air installations and apparatus; level controlling valves; filters being parts of industrial installations; pipeline accessories in the nature of valves, filters, strainers, separators, diffusers, air vents, air eliminators and vacuum breakers, and boiler pipes; humidification apparatus; structural parts and fittings for all the aforesaid goodsACTIVE
037Custom construction, repair, installation, commissioning and maintenance of engineering systems, and fluid or steam control systems; [ inspection of engineering systems, namely, inspection services in the course of construction of fluid and steam control systems; ] consultancy and advisory services relating to custom construction, repair, installation, commissioning and maintenance of engineering systems, and fluid or steam control systemsACTIVE
042Professional technological consultations and advice relating to engineering, and fluid and steam control technology; conducting engineering surveys of industrial premises; feasibility studies relating to engineering, and fluid and steam control; technological and research and consultation services relating to engineering, and fluid and steam control; construction drafting, engineering, industrial design and mechanical research; technological consultancy and technical advisory services relating to custom construction, repair, installation and maintenance of engineering systems, and technological aspects of fluid and steam control systems; preparation of reports relating to the custom construction, repair, installation, commissioning and maintenance of engineering systems, and fluid and steam control systemsACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 28, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Feb 13, 2023INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Dec 16, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 25, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 16, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Apr 16, 202271AGREGISTERED-SEC.71 ACCEPTED
Apr 14, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Sep 3, 2021ES71TEAS SECTION 71 RECEIVED
Mar 8, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jan 23, 2020RNWLINTERNATIONAL REGISTRATION RENEWED
Aug 1, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Dec 14, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Apr 6, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Feb 16, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Feb 16, 2018INPCINVALIDATION PROCESSED
Feb 12, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jun 12, 2017NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Jun 12, 2017C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.
Jun 12, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 6, 2017ES75TEAS SECTION 71 & 15 RECEIVED
Jun 5, 2014INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Oct 7, 2013INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 25, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 7, 2013COC.CORRECTION UNDER SECTION 7 - PROCESSED
Feb 7, 2013PLGLASSIGNED TO PARALEGAL
Feb 7, 2013CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Feb 4, 2013CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Jun 15, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB
Jun 15, 2011FIMPFINAL DISPOSITION PROCESSED
Jun 8, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 8, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 21, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 1, 2010NPUBNOTICE OF PUBLICATION
Nov 18, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 13, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 12, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Nov 12, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Nov 12, 2010ALIEASSIGNED TO LIE
Oct 26, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 21, 2010RFNTREFUSAL PROCESSED BY IB
Apr 27, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 27, 2010RFRRREFUSAL PROCESSED BY MPU
Apr 27, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 26, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 20, 2010MAFRAPPLICATION FILING RECEIPT MAILED
Apr 16, 2010DOCKASSIGNED TO EXAMINER
Apr 16, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 15, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance