Drawing for CMAS

USPTO serial 79082909

CMAS

Reviewed by CopyMark Law Group

Reg. 3980200Status 706Registered
Filing date
Status date
Registration date
Jun 21, 2011
Examiner
HOFFMAN, DAVID AARON
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with CMAS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Scott S. Havlick

Scott S. Havlick Holland & Hart LLPP.O. Box 8749Attn: Trademark DocketingDenver, CO 80201

Goods and services

ClassDescriptionStatusFirst use
007Mechanical power transmission equipment and parts therefor for the energy and process industries, namely, gears, drives, gearboxes, [ gear housings, ] gear units, [ girth rings, presses, ] shafts, [ clutches, ] couplers, gear wheels, gear trains, [ gear clusters, ] pinions, [ differentials, gear racks, torque limiters, idlers, tighteners, sheaves, variable pitch sheaves, ] bearings [, bearing seals, adaptor bearings, pillow blocks, flange blocks, take-up units, take-up frames, bushings, belts, flexible couplings, roller chain drives, sprockets, roller chains, pulleys, motor bases, chain tools, keys, set collars, hubs, keystock, speed reducers, geared sprockets, electrical adjustable speed drives, AC and DC electric motors not for land vehicles, clutches, clutch brakes, clutch brake couplings, antifriction bearings, bearing seals, rubber belting in which cords are embedded, flexible link belting, synchronous drive belts, springs, pins, retainer rings and wire for maintaining a uniform air gap in electromagnetic friction clutches and brakes, ball screws, machinery shaft couplings, conveyor pulleys, and locking collars for antifriction bearing units ]ACTIVE—
009Electrical and electronic instruments and measuring, controlling, monitoring, and display devices, namely, optical, electric, hydraulic and pneumatic measuring instruments for measuring temperature, vibration, torque, pressure, rpm, and oil qualities of power transmission equipment; information input and output devices, namely, data transmitters; computer central processing units, cables for data transfer, electronic sensors, computers and computer software for monitoring, regulating and controlling operating parameters of power transmission equipmentACTIVE—
037[ Repair and installation of mechanical power transmission devices and equipment and their parts ]SECTION 71 - CANCELLED—
042[ Engineering services, namely, analyzing technical data received from power transmission equipment for monitoring, managing and supervising equipment condition, and for controlling and adjusting mechanical gear units ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 4, 2022INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 28, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 28, 2021CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 28, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 28, 202171AGREGISTERED-SEC.71 ACCEPTED—
May 22, 2021ES71TEAS SECTION 71 RECEIVED—
Aug 29, 2020CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jun 21, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
May 28, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 30, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 4, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 22, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Mar 22, 2018INPCINVALIDATION PROCESSED—
Mar 11, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 11, 2017NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jul 11, 2017C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jul 10, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 19, 2017ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 21, 2016CHLDCHANGE OF OWNER RECEIVED FROM IB—
May 11, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 25, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 23, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 23, 2011FIMPFINAL DISPOSITION PROCESSED—
Sep 21, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 21, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 5, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 17, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 17, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 16, 2011NPUBNOTICE OF PUBLICATION—
Mar 3, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 28, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 25, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 25, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 11, 2011ALIEASSIGNED TO LIE—
Feb 10, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 3, 2010RFNTREFUSAL PROCESSED BY IB—
Aug 10, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 10, 2010RFRRREFUSAL PROCESSED BY MPU—
Aug 10, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 9, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2010DOCKASSIGNED TO EXAMINER—
Jun 22, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 18, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 17, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance