Drawing for NORDEX CONTROL

USPTO serial 79083591

NORDEX CONTROL

Reviewed by CopyMark Law Group

Reg. 4054529Status 706Registered
Filing date
Status date
Registration date
Nov 15, 2011
Examiner
HUSSAIN, TASNEEM
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with NORDEX CONTROL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

SARA M. DORCHAK

SARA M. DORCHAK BARCLAY DAMON LLP1270 AVENUE OF THE AMERICAS, SUITE 501NEW YORK, NY 10020UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Electric generators, emergency electricity generators, current generators [, AC generators, namely, alternators ]ACTIVE—
009[ Scientific apparatus and instruments, namely, surveying instruments, photographic apparatus and instruments, namely, cameras, optical cables, measuring apparatus and instruments, namely, laser distance meters, signal processors, and control apparatus and instruments, namely, electric control panels; apparatus and instruments for switching electricity namely, electric current switches, fault-voltage protective switches, fault-current protection switches, for storing, regulating and controlling of electricity, apparatus and instruments for the regulation and control of electric current, devices for the recording, transmission, and reproduction of sound and picture, magnetic recording medium, namely, blank magnetic data carriers; calculating machines; data processing apparatus and computers, ] computer operating software, and electric controllers for wind energy plants and wind parks; software for controlling wind energy plants and wind parks [ ; electric protection devices, namely, fuses, especially against electrical surge, over-current, false current, short circuits; monitoring apparatus for electric currents; converters; electric switches, namely, circuit breakers; electric switches, namely, electric apparatus for commutation; integrated circuits; electric distribution consoles; chips, namely, integrated circuits; electric circuits; electric frequency converters; electric sensors, electric sensors for measuring meteorologic values; anemometers; pressure measuring apparatus, namely, pressure gauges; remote controls, namely, electronic apparatus for the remote control of industrial operations; interfaces, namely, interface devices or programs for computers; voltmeters, ammeters, electric transformers, computer central processing units for data processing ]* ;all the before mentioned goods not relating to personal, security alarms, home and office security *ACTIVE—
038Telecommunication access services; telecommunication access services via platforms and portals in the Internet, electronic exchange of data via Internet platforms; providing user access to computer programs in data networks [ ; email services; facsimile transmission; short message services, namely, forwarding of short messages (SMS) and multimedia messages (MMS) in telecommunication networks; communications by fiber optic networks, paging services via radio, telephone or other means of electronic communication; message sending ]ACTIVE—
042[ Scientific research; technological research and design for others in the field of wind energy technology; industrial research in the field of wind energy, design and development of computer hardware and software, technical and environmental energy consulting, namely, consulting services in the fields of energy measurement to improve energy efficiency; technical computer network configuration of energy networks; technical development, namely, development of new technology for others in the field of energy networks; technical planning for third parties in connection with the operation of installations for the supply of electricity, heat, water and cold; ] configuration of computer networks by software; [ designing, servicing, ] maintenance and updating of data processing programs [ ; designing and developing websites; energy-saving consultancy, namely, in the fields of energy measurement to improve energy efficiency; technical consultancy for the operation and the supervision of wind parks; technical consultancy for the operation of wind energy plants; scientific research related to wind energy plants and parts thereof; technical development and technical inspection of wind energy plants and parts thereof; development of programs, namely, computer software for the control of wind energy plants and wind parks; engineering services; research on the technical field, namely, research in the field of energy ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 11, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 17, 2024INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 6, 2024INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 6, 2024INPCINVALIDATION PROCESSED—
Jan 16, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 16, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 16, 202371AGREGISTERED-SEC.71 ACCEPTED—
Feb 16, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Feb 14, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 14, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Feb 14, 2023EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Feb 14, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 16, 2022PR71POST REGISTRATION ACTION MAILED - SEC.71—
May 23, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 15, 2021ES71TEAS SECTION 71 RECEIVED—
May 9, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 15, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
May 28, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
May 22, 2018LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 17, 2018NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 17, 2018C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 16, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 14, 2018ES75TEAS SECTION 71 & 15 RECEIVED—
Apr 12, 2018CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Mar 2, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 1, 2018LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Sep 30, 2017INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Sep 27, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 27, 2017LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jan 27, 2017COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jan 26, 2017LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 19, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 26, 2013ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 6, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 20, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 20, 2012FIMPFINAL DISPOSITION PROCESSED—
Feb 15, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 15, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 22, 2011GPNXNOTIFICATION PROCESSED BY IB—
Aug 30, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 10, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 10, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 10, 2011NPUBNOTICE OF PUBLICATION—
Jul 26, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 21, 2011ALIEASSIGNED TO LIE—
Jun 27, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 22, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 2, 2011CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 2, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 22, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 18, 2010RFNTREFUSAL PROCESSED BY IB—
Aug 20, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 20, 2010RFRRREFUSAL PROCESSED BY MPU—
Aug 20, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 19, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 16, 2010DOCKASSIGNED TO EXAMINER—
Jul 16, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 12, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 9, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance