USPTO serial 79083594
W2PS
Reviewed by CopyMark Law Group
Reg. 3995813Status 404
- Filing date
- Status date
- Registration date
- Jul 19, 2011
- Examiner
- MORENO, PAUL A
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with W2PS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Andrea M. Wilkovich
Andrea M. Wilkovich HOFFMANN & BARON, LLP6900 Jericho TurnpikeSyosset, NY 11791-4407UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Motors and engines for the generation of electricity, not for land vehicles; machine coupling and transmission components not for land vehicles, namely, couplings for machines, transmission belts, transmission gears for machines, generators for wind turbines, blades for the generation of electricity, power transmission shafts for machines, wind-powered electricity generators, windmills, offshore windmills, wind power plants, offshore wind power plants, wind turbines, and structural parts and accessories therefor, not included in other classes, namely, mill towers and masts, blades, blade hubs, mill housings, machine beds, rotation devices, yaw rings and gears; devices for setting the pitch of the wings, brakes and braking devices, main shafts, universal joints, transmission cases, clutches and electric generators and reserve power supply plants electric generators, solar-powered electricity generators, wind-powered electricity generators, hydroelectric generating stations, wind driven electric apparatus, namely, wind turbines, wind/diesel driven electrical energy apparatus for conversion of wind power to electric energy, frequency converters, rotor blades and rotors | SECTION 71 - CANCELLED | — |
| 009 | Electric and electronic apparatus and instruments for wind turbines, wind generators, wind power plants, hydroelectric power plants, photovoltaic-based power plants and wind turbine generators, namely, apparatus and computers for control, monitoring and automatically turning on or off the generator and for automatic starting after a public power breakdown, for overvoltage protection against strokes of lightning; microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed control of the efficiency and thickness of brake pads and of the temperature, direction and speed of wind; vibration sensors for installation in mill housings, watt-hour meters; all the aforesaid goods for use in connection with wind turbines, wind generators, wind power plants and wind turbine generators only; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; electronical sensors for measuring solar radiation; photovoltaic cells also including a solar thermal collector sold as a unit; solar panels for production of electricity; solar collectors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric switches, adapters, voltage regulators for electric power; central processing units for processing information, data, sound or images; data processing computers, computers, all for operating and control of wind turbines | SECTION 71 - CANCELLED | — |
| 011 | Parabolic mirrors designed for the collection of solar energy; solar collectors; solar energy based cooling apparatus; solar heat collection panels; solar energy receivers; solar thermal installations, namely, solar thermal modules; solar thermal-based power plants; solar water heaters; solar-powered all-weather lights; solar-powered cooling units | SECTION 71 - CANCELLED | — |
| 037 | Construction services, namely, construction of wind power generation parks and machinery, solar power generation parks and machinery and construction of photovoltaic generation parks and machinery; repair services, namely, repair of solar collectors, repair of wind turbines; installation, upkeep and maintenance services for wind and solar park machinery and installations, namely, installation, repair and maintenance of wind and solar energy generation parks, wind and solar energy generation plants, wind and solar electrical generators, wind turbines, and solar collectors for others | SECTION 71 - CANCELLED | — |
| 040 | Generation of energy, namely, production of electric energy and renewable energies; transformation of energy, namely, generation of energy by converting sunlight into solar power, generation of energy by converting wind into electrical power | SECTION 71 - CANCELLED | — |
| 042 | Research and development into, as well as technical information and advice on, energy efficiency, energy poverty, greenhouses gases and emissions, global warming, energy and the environment, sustainable development and the use of the new technologies in the field of energy; preparation of environmental compliance reports in respect of the aforesaid; research, information and advice on industrial and engineering services and research and development services in the field of energy, namely, hydrogen as an energy source; analytical services, namely, the sampling and reporting of technical data from energy sources; technical information and advice relating to the auditing of energy consumption and energy efficiency, new product development policy and new product planning strategy consultation in the field of energy; conducting feasibility studies relating to exploration and exploitation of energy, renewable energy, solar and wind power; information, advice and consultation in the fields of energy, renewable energy, solar and wind power | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by WIND TO POWER SYSTEM, S.L.
- Other trademarks owned by WIND TO POWER SYSTEM, S.L.
- Other trademarks owned by WIND TO POWER SYSTEM, S.L.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named W2PS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 22, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| May 22, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Dec 14, 2018 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 5, 2018 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 5, 2018 | INPC | INVALIDATION PROCESSED | — |
| Oct 23, 2018 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 23, 2018 | C71T | CANCELLED SECTION 71 | — |
| Aug 20, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 16, 2012 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 17, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 27, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 27, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 19, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 19, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 3, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 13, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 13, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 13, 2011 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 25, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 23, 2011 | ALIE | ASSIGNED TO LIE | — |
| Mar 7, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 13, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 11, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 11, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 8, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 8, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 4, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 11, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 11, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 11, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 10, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 30, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 16, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 12, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 9, 2010 | LIMS | LIMITATION OF GOODS/SERVICES FROM IB ENTERED | — |
| Jul 9, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |