Drawing for WIND TO POWER SYSTEM

USPTO serial 79083698

WIND TO POWER SYSTEM

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
MORENO, PAUL A
Law office
TMEG LAW OFFICE 103 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WIND TO POWER SYSTEM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

TODD A. DENYS

TODD A. DENYS PROZIO, BROMBERG & NEWMAN, P.C.29 THANET ROAD, SUITE 201PRINCETON, NJ 08540-3674

Goods and services

ClassDescriptionStatusFirst use
007MOTORS AND ENGINES FOR THE GENERATION OF ELECTRICITY, NOT FOR LAND VEHICLES; MACHINE COUPLING AND TRANSMISSION COMPONENTS NOT FOR LAND VEHICLES, NAMELY, COUPLINGS FOR MACHINES, TRANSMISSION BELTS, TRANSMISSION GEARS FOR MACHINES, GENERATORS FOR WIND TURBINES, BLADES FOR THE GENERATION OF ELECTRICITY, POWER TRANSMISSION SHAFTS FOR MACHINES, WIND-POWERED ELECTRICITY GENERATORS, WINDMILLS, OFFSHORE WINDMILLS, WIND POWER PLANTS, OFFSHORE WIND POWER PLANTS, WIND TURBINES, AND STRUCTURAL PARTS AND ACCESSORIES THEREFOR, NOT INCLUDED IN OTHER CLASSES, NAMELY, MILL TOWERS AND MASTS, BLADES, BLADE HUBS, MILL HOUSINGS, MACHINE BEDS, ROTATION DEVICES, YAW RINGS AND GEARS; DEVICES FOR SETTING THE PITCH OF THE WINGS, BRAKES AND BRAKING DEVICES, MAIN SHAFTS, UNIVERSAL JOINTS, TRANSMISSION CASES, CLUTCHES AND ELECTRIC GENERATORS AND RESERVE POWER SUPPLY PLANTS ELECTRIC GENERATORS, SOLAR-POWERED ELECTRICITY GENERATORS, WIND-POWERED ELECTRICITY GENERATORS, HYDROELECTRIC GENERATING STATIONS, WIND DRIVEN ELECTRIC APPARATUS, NAMELY, WIND TURBINES, WIND/DIESEL DRIVEN ELECTRICAL ENERGY APPARATUS FOR CONVERSION OF WIND POWER TO ELECTRIC ENERGY, FREQUENCY CONVERTERS, ROTOR BLADES AND ROTORSSECTION 70 - CANCELLED—
009Electric and electronic apparatus and instruments for wind turbines, wind generators, wind power plants, hydroelectric power plants, photovoltaic-based power plants and wind turbine generators, namely, apparatus and computers for control, monitoring and automatically turning on or off the generator and for automatic starting after a public power breakdown, for overvoltage protection against strokes of lightning; microprocessors for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed control of the efficiency and thickness of brake pads and of the temperature, direction and speed of wind; vibration sensors for installation in mill housings, watt-hour meters; all the aforesaid goods for use in connection with wind turbines, wind generators, wind power plants and wind turbine generators only; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar hybrid modules; electronical sensors for measuring solar radiation; photovoltaic cells also including a solar thermal collector sold as a unit; solar panels for production of electricity; solar collectors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric switches, adapters, voltage regulators for electric power; central processing units for processing information, data, sound or images; data processing computers, computers, all for operating and control of wind turbinesSECTION 70 - CANCELLED—
011Parabolic mirrors designed for the collection of solar energy; solar collectors; solar energy based cooling apparatus; solar heat collection panels; solar energy receivers; solar thermal installations, namely, solar thermal modules; solar thermal-based power plants; solar water heaters; solar-powered all-weather lights; solar-powered cooling unitsSECTION 70 - CANCELLED—
037CONSTRUCTION SERVICES, NAMELY, CONSTRUCTION OF WIND POWER GENERATION PARKS AND MACHINERY, SOLAR POWER GENERATION PARKS AND MACHINERY AND CONSTRUCTION OF PHOTO VOLTAIC GENERATION PARKS AND MACHINERY; REPAIR SERVICES, NAMELY, REPAIR OF SOLAR COLLECTORS, REPAIR OF WIND TURBINES; INSTALLATION, UPKEEP AND MAINTENANCE SERVICES FOR WIND AND SOLAR PARK MACHINERY AND INSTALLATIONS, NAMELY, INSTALLATION, REPAIR AND MAINTENANCE OF WIND AND SOLAR ENERGY GENERATION PARKS, WIND AND SOLAR ENERGY GENERATION PLANTS, WIND AND SOLAR ELECTRICAL GENERATORS, WIND TURBINES, AND SOLAR COLLECTORS FOR OTHERSSECTION 70 - CANCELLED—
040GENERATION OF ENERGY, NAMELY, PRODUCTION OF ELECTRIC ENERGY AND RENEWABLE EMERGES; TRANSFORMATION OF ENERGY, NAMELY, GENERATION OF ENERGY BY CONVERTING SUNLIGHT INTO SOLAR POWER, GENERATION OF ENERGY BY CONVERTING WIND INTO ELECTRICAL POWERSECTION 70 - CANCELLED—
042Research and development into, as well as technical information and advice on, energy efficiency, energy poverty, greenhouses gases and emissions, global warming, energy and the environment, sustainable development and the use of the new technologies in the field of energy; preparation of environmental compliance reports in respect of the aforesaid; research, information and advice on industrial and engineering services and research and development services in the field of energy, namely, hydrogen as an energy source; analytical services, namely, the sampling and reporting of technical data from energy sources; technical information and advice relating to the auditing of energy consumption and energy efficiency, new product development policy and new product planning strategy consultation in the field of energy; conducting feasibility studies relating to exploration and exploitation of energy, renewable energy, solar and wind power; information, advice and consultation in the fields of energy, renewable energy, solar and wind powerSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 23, 2021DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 22, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 20, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 24, 2012FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 5, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 3, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 22, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 16, 2012ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 14, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 14, 2011OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 4, 2011MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 3, 2011ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 6, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Apr 6, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 6, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 2, 2011ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 2, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 28, 2011ALIEASSIGNED TO LIE—
Feb 17, 2011MAILPAPER RECEIVED—
Sep 14, 2010RFNTREFUSAL PROCESSED BY IB—
Aug 12, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 12, 2010RFRRREFUSAL PROCESSED BY MPU—
Aug 12, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 11, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2010DOCKASSIGNED TO EXAMINER—
Jul 17, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 13, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 12, 2010LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Jul 9, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance