Drawing for Serial No. 79083973

USPTO serial 79083973

Serial No. 79083973

Reviewed by CopyMark Law Group

Reg. 3991799Status 404
Filing date
Status date
Registration date
Jul 12, 2011
Examiner
TENG, SIMON
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79083973?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Brent E. Routman

Brent E. Routman Merchant & Gould, P.C.P.O. Box 2910Minneapolis, MN 55402-0910UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Hydrogen; Industrial silicon; Crystal silicon; Water-softening preparations; chemical products for the preparation of enamels; Biochemical catalysts; Chemical preparations for scientific purposes; Glue for industrial purposesSECTION 71 - CANCELLED—
004Industrial oil; Fuels; Electricity power; energy produced by nuclear fusion; electricity; Electric power transformed from solar energy; Electric power transformed from wind energy; Electric power transformed from geothermal energy; Electric power transformed from ocean energy; Electric power transformed from biomass energySECTION 71 - CANCELLED—
007Power-operated processing equipment machine for polishing optical discs by using cold temperatures; Machine pumps used in heating installations; Solar photovoltaic machine pumps; Machines for power generation using geothermal energy directly by battery; Machines for electricity generation using tide energy; Machines for electricity generation using geothermal energy; Machines for electricity generation using biologic energy; Machines for electricity generation using wind energy; Machines for oxy-hydrogen generation using electrolyzing water; Machines for accumulator industry, namely, electric cord making machines; Machinery for manufacturing wire and cable; processor for printed circuit boardSECTION 71 - CANCELLED—
009Battery; Inverters; Junction boxes; Electrical distribution boxes; Current rectifiers; Charge and discharge electrical controller; Semiconductor devices; Electric distribution consoles; Printed circuits; Distribution boxes for electrical power; Electric control panels; Capacitors; Solar Cells; Polysilicon chips; Monocrystal silicon chips; Polysilicon wafers; Monocrystal silicon wafers; Cathodes; Anode battery; Chargers for electric batteries; Electric devices, namely, anti corrosion cathodes; Anticathodes; Optical lanterns, namely, light-emitting diodes; Optical products, namely optical frames, optical filters, optical lenses, optical sensors; Optical glass; Electronic transistors; electronic advertisement billboards; Photoelectric tube; Electric regulating apparatus, namely, instruments and apparatus for controlling electric current, namely, electrical controllers for magnetic bearing control; Photoelectric controller for electrical apparatus, namely photoelectric sensors and tubesSECTION 71 - CANCELLED—
011Lamps; Electric space heaters; Gas water heaters; heaters, namely heating installations; Solar collectors; Solar water heaters; Water desalination plants; Polymerization reaction equipments, namely polymerization plants; Solar street lamps; Solar lawn lamps; Solar indicator lights for telecommunication apparatus; Solar regulating accessories for water supply, namely, metered valvesSECTION 71 - CANCELLED—
037Building construction information; Building construction; Roofing services; Heating equipment installation and repair; Electric appliance installation and repair; Lighting apparatus installation and repair; Motor vehicle maintenance and repair; Service stations for Vehicle; Burglar alarm installation and repair; rustproofingSECTION 71 - CANCELLED—
039Delivery of goods; Transporting travellers; Car parking; Electricity distribution; Distribution of energy; Courier services; Arranging of tours; Transport by pipelineSECTION 71 - CANCELLED—
040Metal treating; Printing; Decontamination of hazardous materials; Air purification; Water treating; Production of energy; Seawater treatment and purificationSECTION 71 - CANCELLED—
042Technological project studies in the field of solar energy; Research and development and consultation related thereto in the field of solar energy; Chemical research; Biological research; Physics research; Industrial design; Development of construction project, namely construction drafting, planning, research on building construction or city planning; Computer software design; Hosting computer sites of others on a computer server for a global computer network; Research in the field of environmental protectionSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 22, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jan 22, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 14, 2018INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 25, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 25, 2018INPCINVALIDATION PROCESSED—
Oct 16, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 16, 2018C71TCANCELLED SECTION 71—
Jan 27, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 11, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 11, 2012FIMPFINAL DISPOSITION PROCESSED—
Oct 12, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 12, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 26, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 26, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 6, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 6, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 19, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 19, 2011ALIEASSIGNED TO LIE—
Mar 2, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 1, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 8, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 8, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 8, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 18, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 17, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 17, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 28, 2010RFNTREFUSAL PROCESSED BY IB—
Jul 26, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 26, 2010RFRRREFUSAL PROCESSED BY MPU—
Jul 24, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 23, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 21, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 17, 2010DOCKASSIGNED TO EXAMINER—
Jul 17, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 15, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance