Drawing for RESEARCH-COTTRELL DRY COOLING

USPTO serial 79084001

RESEARCH-COTTRELL DRY COOLING

Reviewed by CopyMark Law Group

Reg. 3995821Status 706Registered
Filing date
Status date
Registration date
Jul 19, 2011
Examiner
NEVILLE, BRIAN
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with RESEARCH-COTTRELL DRY COOLING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007[ Industrial machinery and machine tools, namely, air condensers, water condensers, de-aerators for feed water, steam separators, feed water pumps, extraction pumps for extracting condensate for condensers; motors, other than for land vehicles; fans for motors and engines, motors and engines for fans and for air conditioning apparatus and installations; heat exchangers being parts of machines; filters being parts of machines or engines ]SECTION 71 - CANCELLED—
011[ Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes, namely, desalination plants; cooling appliances and installations, namely, water cooling towers, air condensers, water condensers and steam condensers; distillation apparatus; heat exchangers not being parts of machines; air conditioning apparatus and installations; air cooling apparatus and installations; air conditioning fans, fans as parts of air conditioning installations; electrostatic precipitators; apparatus and installations for flue gas desulfurization; air purification apparatus and installations; air filtering installations; filters for air conditioning apparatus and installations; filters for air cooling apparatus and installations; apparatus for gas purification in the nature of gas scrubbers; filters being parts of industrial installations ]SECTION 71 - CANCELLED—
037Repair and maintenance of constructions, namely, of water cooling towers, air condensers, water condensers, and steam condensers; services for assembling, cleaning, maintenance and repair of heating installations, ventilation installations, air conditioning installations, refrigeration installations, heat exchangers, as well as cooling installations and cooling towers; repair or maintenance of machines; rental of construction machines and tools; turnkey construction of cooling installations and cooling towersACTIVE—
042Construction drafting and advice in the field of construction; construction drafting and advice in the field of assembling heat exchangers, cooling installations and cooling towers; services of architects, chemists, physicists, engineers and land surveyors; computer programming services; surveys drawn up by engineers or laboratories; technical consulting services in the field of civil engineering; materials testing; heat performance testing; inspection services for quality control of heating, ventilating, refrigerating installations, heat exchangers as well as cooling installations and cooling towers; technical project studies and management of technical projects for designing and improving quality of cooling towers and cooling installations, air monitoring systems and heat exchangers; feasibility studies in the field of construction, assembly and improvement of cooling towers, cooling installations and air monitoring systems; engineering services; research and analysis pertaining to the monitoring of air contamination and cooling processesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 11, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 20, 2023CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 13, 2023INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 23, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 23, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 23, 202271AGREGISTERED-SEC.71 ACCEPTED—
May 10, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 15, 2021ES71TEAS SECTION 71 RECEIVED—
Jul 30, 2021ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 19, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
May 28, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 8, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Apr 23, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 23, 2018INPCINVALIDATION PROCESSED—
Apr 18, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 18, 2017NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 18, 2017C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Aug 7, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 19, 2017ES75TEAS SECTION 71 & 15 RECEIVED—
May 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 23, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 23, 2012FIMPFINAL DISPOSITION PROCESSED—
Oct 19, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 19, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 3, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 3, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 13, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 13, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 25, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 25, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 2, 2011ALIEASSIGNED TO LIE—
Jan 31, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 31, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 31, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 4, 2010RFNTREFUSAL PROCESSED BY IB—
Aug 6, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 6, 2010RFRRREFUSAL PROCESSED BY MPU—
Aug 6, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 5, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 28, 2010DOCKASSIGNED TO EXAMINER—
Jul 21, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 17, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 15, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance