USPTO serial 79084216
JUWI
Reviewed by CopyMark Law Group
Reg. 4219861Status 707Registered
- Filing date
- Status date
- Registration date
- Oct 9, 2012
- Examiner
- LAWRENCE, SUSAN KASTRINER
- Law office
- —
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with JUWI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Thilo C. Agthe
Thilo C. Agthe Wuersch & Gering LLP100 Wall Street, 10th FloorNew York, NY 10005UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [ Wood-based fuels, in particular wood pellets ] | SECTION 71 - CANCELLED | — |
| 007 | [ Electrical power generators using solar cells; wind mills, wind power plants, wind turbines and other wind-operated machines, namely, wind turbines; spare parts and accessories for the aforesaid goods, namely, wind turbine towers and masts, rotor blades, rotor hubs, housings, machine foundations, rotation device, yaw rings and gearboxes; replacement parts and accessories for the aforesaid goods] | SECTION 71 - CANCELLED | — |
| 009 | [Electronic sensors for measuring solar radiation; apparatus and instruments for generating, distributing or accumulating electricity, namely, electric power supplies; apparatus and instruments for the supervision, remote control, checking and measuring of electricity and energy consumption and for the operation of power stations, namely, remote control software and hardware, instruments for measuring electricity and energy consumption, and energy meters; apparatus and instruments for transforming electricity, namely, electric voltage transformer; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, rechargeable batteries and switchgears; apparatus for analyzing signals, current and voltage, namely, electronic monitors and monitor modules for monitoring electric current and electrical signals and voltage monitor modules; apparatus for overvoltage protection against lightning strikes, namely, voltage surge protectors; electric cables, electric connection equipment, namely, electric connectors, electric transformers for the distribution and generation of electricity and energy; solar cells; photovoltaic modules; data processing equipment, namely, data processors, software and recorded computer programs for use in the generation, distribution, storage and control of energy and electricity] | SECTION 71 - CANCELLED | — |
| 011 | [Heating equipment, namely, boilers, fermenters, being parts of biogas installations; fireplaces; solar thermal installations, namely, solar thermal modules, photovoltaic installations, namely, photovoltaic-based plants, geothermal installations, namely, geothermal-based HVAC units, hydro-electric power plants; pump storage installations, namely, hydrogen generators; waste processing plants] | SECTION 71 - CANCELLED | — |
| 035 | [Business management for the energy sector; advertising agencies; business management in the field of energy; providing office functions in the energy sector;] professional business management and commercial management of the financing, construction and operational management of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations and photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations | ACTIVE | — |
| 036 | [Insurance administration, financial affairs, namely, financial consulting, monetary affairs, namely, monetary exchange, real estate brokerage;] real estate procurement for others, namely, procurement of suitable sites for power stations | ACTIVE | — |
| 037 | Construction of power stations, [windmills, wind farms, wind turbines and other wind-powered machines, biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations; [construction of charging and service stations for electric vehicles;] installation of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, [other wind-powered machines, biogas installations,] [geothermal power plants, hydroelectric power stations,] [pump storage systems] maintenance and repair of photovoltaic installations, solar thermal installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, [geothermal power plants, hydroelectric power stations,] pump storage systems; installation, maintenance and repair of power stations and power station systems, and installation, maintenance and repair of electrical equipment; construction of power stations; construction of charging and service stations for electric vehicles; consultancy and information in connection with all the aforesaid services | ACTIVE | — |
| 039 | [Utility services, namely, transmission and distribution of electricity; utility services, namely, transmission and distribution of electricity and electrical energy; information services with regard to the aforesaid services] | SECTION 71 - CANCELLED | — |
| 040 | [ Soil processing and treatment; environmental remediation services in the nature of treatment of topsoil and other nutritious soil; treatment of waste, in particular the conversion of waste in the ground; processing and treatment of wood, oil, gas, natural resources and fuels for the generation of energy and current; assembly of vehicles and electric vehicles for others; electricity generation; power generation through the use of water; power generation through the use of geothermal energy ] | SECTION 71 - CANCELLED | — |
| 041 | [ Providing of training in the fields of the energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; providing of training and workshops in the fields of the manufacture, installation and repair of power-generating apparatus; publication of books and brochures in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development; arranging and conducting educational conferences, meetings, and seminars in the fields of energy management, renewable energies, solar energy, wind power, biogas energy, geothermal energy, hydro power, pump storage energy and sustainable development ] | SECTION 71 - CANCELLED | — |
| 042 | Technical planning of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations] ; technical consultancy with regard to development and design of photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, [biogas installations, geothermal installations,] hydroelectric power stations [, pump storage installations and power stations]; development of power stations, specialist engineering services and consultancy in the field of engineering; [research and development of new products in the field of renewable energies; geological calculations for the extraction of natural resources for the generation of energy and energy products; preparation of technical reports regarding the optimization of the production of renew able energy and the energy saving, and product development in the power and energy section; research and consultancy in the field of environmental protection and environmental impact assessment with regard to power stations and the energy sector; technical monitoring of the energy performance of apparatus, installations and buildings; development of technical materials, namely, drafting of construction plans used to construct photovoltaic installations, solar installations, windmills, wind farms, wind turbines, other wind-powered machines, biogas installations, geothermal installations, hydroelectric power stations, pump storage installations and power stations all in the energy sector;] design of power stations, windmills, wind farms, wind turbines and other wind-powered machines, [biogas installations,] solar installations, photovoltaic installations, [geothermal installations, hydroelectric power stations,] pump storage installations [; design of vehicles and electric vehicles; design of charging and service stations for electric vehicles; measurement evaluations in the fields of wind power, biogas and solar energy systems] | ACTIVE | — |
| 045 | [ Legal consultancy with regard to energy projects; legal services, namely, providing legal assistance with regard to approval procedures for power stations ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by juwi Holding AG
- Other trademarks owned by juwi Holding AG
- Other trademarks owned by JUWI GmbH
- Other trademarks in Class 004
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 041
- Other trademarks in Class 042
- Other trademarks in Class 045
- Similar marks named JUWI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 29, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 23, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 11, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 9, 2024 | INPC | INVALIDATION PROCESSED | — |
| Oct 1, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 20, 2024 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Aug 20, 2024 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Aug 9, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 8, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Dec 8, 2023 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Nov 16, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 28, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 10, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Oct 29, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 9, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Mar 26, 2020 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 20, 2020 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 18, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 5, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 18, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 18, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jun 22, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 19, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 22, 2018 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Oct 22, 2018 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Oct 17, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 8, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 19, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 28, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 28, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 9, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 24, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 9, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 22, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 4, 2012 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 20, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 19, 2012 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 19, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 19, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 19, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 28, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 28, 2011 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 22, 2011 | CNCF | CONTINUATION OF FINAL REFUSAL MAILED | — |
| Nov 21, 2011 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Oct 31, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 31, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 24, 2011 | PAPER RECEIVED | — | |
| Sep 6, 2011 | NAUD | NOTICE OF UNRESPONSIVE AMENDMENT - MAILED | — |
| Sep 3, 2011 | NAUD | REPORT UNRESPONSIVE AMENDMENT - COMPLETED | — |
| Aug 23, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 23, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 17, 2011 | PAPER RECEIVED | — | |
| Apr 28, 2011 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 27, 2011 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Apr 7, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Apr 7, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 2, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jan 27, 2011 | PAPER RECEIVED | — | |
| Jan 24, 2011 | PAPER RECEIVED | — | |
| Aug 28, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 27, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 27, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 27, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 27, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 26, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 23, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 23, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 22, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |