Drawing for CBI

USPTO serial 79084619

CBI

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
CAPSHAW, DANIEL
Law office
TTAB

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CBI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Components for air conditioning and cooling systems, namely, axial and centrifugal fans; ventilating fans for commercial and industrial use; electric fans; ceiling fans; bathroom exhaust fans; ventilation fan accessories, namely, grilles; gas condensers for refrigerators and other than parts of machines; electric heating fans; rooftop grease containment system comprising an exhaust fan, grease deflector, and filter for trapping grease vented from rooftop exhaust fans for cooking areas within the building; evaporators for air conditioners; locally induced air-conditioners for industrial purposes; oxygen concentrators for use with fuel cells used in heating, ventilation, air conditioning, lighting, and power systems for buildings; parts for heating and air conditioning systems, namely, heater cores and gas coolers for vehicles; fabric air dispersion ducts for distributing and dispensing air as part of a HVAC system; hot air blowers; components for air conditioning and cooling systems, namely, evaporative air coolers; air-conditioning apparatus for industrial purposes; air purifying apparatus and machines; air filters for industrial installations; air cooling apparatus; ventilators conveying industrial fluids; refrigerating appliances and installations; refrigerating machines; air-conditioning, air cooling and ventilation apparatus and instruments; apparatus and instruments for use in the purification, separation and sterilization of liquids and gases used in the biotechnology, pharmaceutical, medical, biopharmaceutical and food and beverage industries; hot-air space heating apparatus for industrial purposes; hot-water space heating apparatus for industrial purposes; ventilation apparatus, namely, cordless floor drying cone dolly; interior environment control system for commercial buildings, namely, heaters, ventilators and humidifiers all sold as a unit; refrigerator condensers; filters and filtering devices for air and gas conditioning; incinerators; garbage incinerators for industrial purposesABANDONED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 26, 2020DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Sep 25, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 15, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 10, 2016LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Mar 4, 2016RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED—
Mar 13, 2014CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 19, 2013FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 25, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 23, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 23, 2012MAB4ABANDONMENT NOTICE MAILED - INTER PARTES DECISION—
Feb 23, 2012ABN4ABANDONMENT - AFTER INTER PARTES DECISION—
Feb 23, 2012OP.TOPPOSITION TERMINATED NO. 999999—
Feb 23, 2012OP.SOPPOSITION SUSTAINED NO. 999999—
Nov 26, 2011RFNTREFUSAL PROCESSED BY IB—
Nov 1, 2011OP.IOPPOSITION INSTITUTED NO. 999999—
Oct 26, 2011OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB—
Oct 26, 2011OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED—
Sep 3, 2011GPNXNOTIFICATION PROCESSED BY IB—
Jul 27, 2011ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Jun 28, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 15, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 15, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 8, 2011NPUBNOTICE OF PUBLICATION—
Feb 28, 2011LOPTLETTER OF PROTEST EVIDENCE FORWARDED—
Feb 24, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 17, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 16, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 16, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 2, 2011ALIEASSIGNED TO LIE—
Feb 1, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 4, 2010RFNTREFUSAL PROCESSED BY IB—
Aug 12, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 12, 2010RFRRREFUSAL PROCESSED BY MPU—
Aug 12, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 11, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 10, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 6, 2010DOCKASSIGNED TO EXAMINER—
Aug 6, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 4, 2010LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Jul 29, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance