USPTO serial 79085389
GENNEX
Reviewed by CopyMark Law Group
Reg. 3988004Status 404
- Filing date
- Status date
- Registration date
- Jul 5, 2011
- Examiner
- ROSSMAN, WILLIAM M
- Law office
- TTAB
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with GENNEX?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
CNPC Xing De Energy Share Limited
CN
CHAO ZHOU THREE-CIRCLE (GROUP) CO., LTD.
CN
Other trademarks owned by CHAO ZHOU THREE-CIRCLE (GROUP) CO., LTD.
NOBLE PARK, AU
NOBLE PARK, AU
NOBLE PARK, AU
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric power generators; mechanical control devices for heaters, namely, valves being parts of machines; mechanical control devices for air heaters and water heaters, namely, pump control valves, proportional flow valves as parts of machines, thermostatic control valves as parts of machines; pumps for heating installations, namely, pumps for machines | SECTION 18 - CANCELLED | — |
| 009 | Fuel cells and structural parts therefor; fuel cell stacks; galvanic electric cells; galvanic batteries; anodes; cathodes; electric batteries; photovoltaic cells | SECTION 18 - CANCELLED | — |
| 011 | Apparatus for heating, namely, boilers for heating installations, central heating radiators, heating installations, thermostatic valves as parts of heating installations; lighting apparatus, namely, lighting installations and electric lighting fixtures; steam generators; heat exchangers; heat regenerators; hot water heaters; central heaters; gas operated apparatus for heating, namely, space heaters and water heaters; air conditioners; cooling appliances and installations, namely, air coolers, water coolers; gas regulators | SECTION 18 - CANCELLED | — |
| 037 | Installation and repair of heating apparatus; installation and repair of electricity generation apparatus, installation and repair of refrigeration or air conditioning apparatus | SECTION 18 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by CNPC Xing De Energy Share Limited
- Other trademarks owned by CHAO ZHOU THREE-CIRCLE (GROUP) CO., LTD.
- Other trademarks owned by Ceramic Fuel Cells Limited
- Other trademarks owned by Ceramic Fuel Cells Limited
- Other trademarks owned by Ceramic Fuel Cells Limited
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 037
- Similar marks named GENNEX
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 19, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Dec 19, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 11, 2016 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 20, 2016 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 2, 2016 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Feb 2, 2016 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Dec 30, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 16, 2015 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 16, 2015 | C18. | CANCELLED SECTION 18-TOTAL | — |
| Mar 16, 2015 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Mar 5, 2015 | CANG | CANCELLATION GRANTED NO. 999999 | — |
| Oct 24, 2014 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Mar 3, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 13, 2011 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 13, 2011 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 5, 2011 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 5, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 19, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 30, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 30, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 30, 2011 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 11, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 10, 2011 | ALIE | ASSIGNED TO LIE | — |
| Feb 16, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 15, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 15, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 15, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 9, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 20, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 20, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 20, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 19, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 14, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 24, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 20, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 19, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |