Drawing for LEANERGY

USPTO serial 79085444

LEANERGY

Reviewed by CopyMark Law Group

Reg. 4097587Status 404
Filing date
Status date
Registration date
Feb 14, 2012
Examiner
DONINGER, CHRISTOPHER G
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LEANERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Scientific, surveying, measuring, signaling, checking, teaching apparatus and instruments, namely, electric sensor, automatic valves, thermometers, power analyzer, flow meters, pressure meters, ultra sound flowmeter, ultra sound detectors, infrared cameras, programmable logic controller (PLC) for energy control and monitoring, computer software for energy data analysis, computer software for energy data optimization, computer software for energy monitoring and reporting, computer software for energy purchase optimization, alarm monitoring systems; Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical cables, capacitors, electrical inductor, harmonic filters, circuit breakers, electrical switches, motor drive, control units for regulating start up electrical motors, batteries, off grid systems comprising generator, photovoltaic paneSECTION 71 - CANCELLED
011Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply purposes, namely, low consumption lamp, electric space heaters, air heater in the nature of electric space heaters, water heaters, electrical boilers, gas boilers, fuel boilers, combined heat and power (CHP), infrared heater, induction heater, electric portable heater, solar water heater, heat pump, steam generator, industrial cooking oven, gas furnace, industrial dryer for dehumidifying, evaporator, compressor chillers for industrial product preparation and storage, compressor chillers for air conditioning, absorption liquid chillers, centrifugal liquid cooled chillers, helical rotary HVAC liquid chillers, scroll air cooled chiller, cooling towers, electric fan, Air-conditioning apparatus and installations; freezers, air or water purifying apparatus and machines; sterilizersSECTION 71 - CANCELLED
040Production of energySECTION 71 - CANCELLED
041Providing of training and coaching in the field of energy, energy efficiency, green house gas, CO2 emission, global warming, climate change, lean manufacturing, industrial performance, cost reduction, purchase optimization, sourcing, energy markets; Publication of books; Educational services, namely, classes, seminars, workshops, training period in the field of energy, green house gas, CO2 emission, global warming, climate change, lean manufacturing, industrial performance, cost reduction, purchase optimization, sourcing, energy markets; Conferences and congresses in the field of energy, green house gas, CO2 emission, global warming, climate change, lean manufacturing, industrial performance, cost reduction, purchase optimization, sourcing; Publication of electronic books and journals on-lineSECTION 71 - CANCELLED
042Engineering services, namely, providing evaluations, assessments and research in the fields of science and technology provided by engineers; Design and development of computer hardware and software; scientific and industrial research and new product development for other in the field of energy, greenhouse gas, CO2 emission, global warming, climate change, lean manufacturing, industrial performance, cost reduction, purchase optimization, sourcing, energy markets; Technical project studies, namely, engineering services in the nature of technical project planning in the field of energy and manufacturing; scientific and technological services, namely, providing energy audits, namely, technical analysis of industrial and building sites for the purpose of improving energy efficiency; technological services, namely, technical analysis of energy efficiency system, technical analysis of energy efficiency in production plants, technical studies of low energy consumption building, technical analysis in positive energy building, technical analysis of system for low emission of greenhouse gas, technical analysis of renewable energy systems; Development, installation, maintenance, updating or rental of software; computer programming, consultancy in the field of computer hardware; data conversion of computer program dataSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 3, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED
Jan 3, 2021DETHDEATH OF INTERNATIONAL REGISTRATION
Nov 29, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB
Jun 10, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jun 10, 2019INPCINVALIDATION PROCESSED
May 21, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Sep 21, 2018C71TCANCELLED SECTION 71
Nov 9, 2017CHLDCHANGE OF OWNER RECEIVED FROM IB
Feb 14, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Apr 16, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Sep 18, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB
Sep 18, 2012FIMPFINAL DISPOSITION PROCESSED
Jun 30, 2012GPNXNOTIFICATION PROCESSED BY IB
May 14, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 17, 2012GPNXNOTIFICATION PROCESSED BY IB
Feb 14, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 1, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 1, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Nov 29, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 10, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 9, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 9, 2011NPUBNOTICE OF PUBLICATION
Oct 21, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Oct 21, 2011ALIEASSIGNED TO LIE
Sep 28, 2011CNEAEXAMINERS AMENDMENT MAILED
Sep 27, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 27, 2011XAECEXAMINER'S AMENDMENT ENTERED
Sep 27, 2011CNEAEXAMINERS AMENDMENT -WRITTEN
Sep 27, 2011DOCKASSIGNED TO EXAMINER
Sep 26, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 26, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 26, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Sep 8, 2011RDX2ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED MAILED
Sep 8, 2011RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED
Sep 7, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 7, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 7, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Aug 10, 2011RDX2ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED MAILED
Aug 10, 2011RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED
Aug 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 1, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Apr 8, 2011CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 7, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 25, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Mar 25, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 25, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 25, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 23, 2010RFNTREFUSAL PROCESSED BY IB
Oct 4, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Oct 4, 2010RFRRREFUSAL PROCESSED BY MPU
Oct 2, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Oct 1, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 24, 2010DOCKASSIGNED TO EXAMINER
Sep 3, 2010MAFRAPPLICATION FILING RECEIPT MAILED
Aug 30, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Aug 26, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance