Drawing for EVERY CONTROL

USPTO serial 79085665

EVERY CONTROL

Reviewed by CopyMark Law Group

Reg. 4152176Status 404
Filing date
Status date
Registration date
Jun 5, 2012
Examiner
WEIGLE, KATHERINE CONNOLLY
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with EVERY CONTROL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Francesco Braga

Francesco Braga Perani & Partners S.p.A.Piazza Armando Diaz 7Milano,ITALY

Goods and services

ClassDescriptionStatusFirst use
009Electric and electronic measuring, control and regulation apparatus and instruments, namely, voltage regulators, oxygen regulators, temperature controllers for the management of refrigerated cabinets, freezers, and displays in industrial refrigeration applications; temperature controllers for the management of pastry, baking, pizza and mixed ovens, fryers, provers and retarder-provers in catering equipment applications; water and air temperature controllers for the management of chillers; electrical humidity controllers, electronic regulating and control devices for the operation of light emitting diode, control valves for regulating the flow of gases and liquids, control units for regulating start-up electrical motors, gas sensor for measuring gas concentration, measuring devices in the nature of fluorometersSECTION 71 - CANCELLED—
011Modular counters for refrigerating, heating and chilling foods; heat pumps; air handling units; roof tops air-conditioning installations for industrial and residential; apparatus and installations for cooking, refrigeration, drying, evaporating, heating and air-conditioning or for ventilation, namely, blast chillers for commercial food preparation and storage used in industrial kitchens like restaurants and canteens, for cooked and pre-cooked food storing and long term freezing, dough proofing and retarding units, namely, heating, cooling and humidity controlling units for processing dough used in bakery shops and bakery laboratories for the automatic management of bread dough retarding-proofing cycle with controlled temperature and humidity in preset timings; pizza, pastry, bread and gastronomy cooking ovens used in industrial kitchens for restaurants and canteens, bakery and pastry laboratories, for the food cooking with various methodologies, namely, top and floor for pastry, convection for gastronomy, steam based for vegetables, mixed with convection and steam for meat and fish; refrigerating appliances and installations, namely, refrigerated cabinets for meat, fish and vegetables conservation; refrigerators, namely, bottle coolers; electric dish dryers used into industrial kitchens like restaurants and canteens for dishes washing; evaporators for air conditioners, evaporative air coolers, cooling evaporators, heating installations, central heating radiators, electric heating fans, air conditioning apparatus, air conditioning units, ventilation hoods, air-conditioning, air cooling and ventilation apparatus and instrumentsSECTION 71 - CANCELLED—
042Design for others in the field of apparatus, instruments and installations for cooking, refrigeration, drying, evaporation, heating and air-conditioning and ventilationSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 22, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 22, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 11, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 20, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 20, 2019INPCINVALIDATION PROCESSED—
Sep 11, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 11, 2019C71TCANCELLED SECTION 71—
Mar 22, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 8, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 8, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jun 5, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 5, 2013ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Apr 14, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 30, 2012GPNXNOTIFICATION PROCESSED BY IB—
Oct 30, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 7, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 7, 2012FIMPFINAL DISPOSITION PROCESSED—
Sep 5, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 5, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 20, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 20, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 29, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 29, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 29, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 13, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 8, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 7, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 7, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 1, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 1, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 12, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 12, 2011ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 26, 2011PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Sep 14, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 9, 2011ALIEASSIGNED TO LIE—
Aug 25, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 17, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 17, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 17, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 3, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 22, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Feb 22, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 22, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 21, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 21, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 21, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 2, 2010RFNTREFUSAL PROCESSED BY IB—
Sep 3, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 3, 2010RFRRREFUSAL PROCESSED BY MPU—
Sep 3, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 2, 2010DOCKASSIGNED TO EXAMINER—
Sep 1, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 28, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 26, 2010SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance