Drawing for SUNCYCLE

USPTO serial 79085706

SUNCYCLE

Reviewed by CopyMark Law Group

Reg. 4004518Status 706Registered
Filing date
Status date
Registration date
Aug 2, 2011
Examiner
FAIRBANKS, RONALD L
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SUNCYCLE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Valerie Brennan

Valerie Brennan Plave Koch PLC3120 Fairview Park Drive, Suite 420Falls Church, VA 22042United States

Goods and services

ClassDescriptionStatusFirst use
009Computer software for coordinating field support for solar plants and for tracking and reporting of service incidents for solar plants; downloadable software for management and analysis of technical information on regenerative energy generation plants [; receivers and converters of direct and indirect radiant and environmental energy, namely, electric solar cells to generate electric energy; electric apparatus for power supply, power control, power transmission, power steering, power storage and power distribution; solar generator units; electric solar cells; photovoltaic cells; solar and sun collectors and to generate electric energy included in this class; solar panels to generate electricity included in this class; solar modules to generate electric energy; solar panels to generate electric energy and photovoltaic plants to generate electric energy formed therefrom; solar batteries; electric devices and plants to generate electricity formed therefrom included in this class, namely, solar modules, inverters and transformers; electric power transformers; electrical connectors; electric cables and wires, batteries, battery chargers, switches, electric power controllers; electric wires fed by solar energy for electric fences; voltage surge protection devices included in this class; electronic energy management systems consisting of hardware and software for the control and regulation of photovoltaic energy; photovoltaic equipment and plants, namely, cells, modules and arrays for the production of electric energy therefrom; electrical sensors as well as electronic apparatus and instruments for steering, controlling and monitoring of the tracking of solar panels; electronic components as parts of solar plants; electronic cabling included in this class for photovoltaic plants; solar inverters for grid feeding of solar electricity and for isolated operation of photovoltaic plants; electrical and electronic control devices, namely, solar charge controllers; electric accumulators to store solar energy; parts and accessories for all aforementioned goods included in this class sold as a unit therewith ]ACTIVE—
011[ Solar thermal plants for heat generation; heat pumps; solar collectors and solar collectors for heating included in this class; solar collectors for hot water production; solar panels for heat generation; heat accumulators; heat recovery units; solar furnaces; photovoltaic panels to generate heat; solar-powered lamps; heat exchangers, in particular solar heat exchangers not being parts of machines; heating recovery plants, climate recovery plants and heat recovery plants, all comprising of ventilation apparatus with an exhaust heat exchanger; chemical and physical plants for the conversion, storage and utilisation of energy, consisting of accumulators for the short and long term as well as latent heat storage; chemical and physical plants for the conversion, storage and utilization of energy, basically consisting of accumulators for the short and long term as well as latent heat storage ]SECTION 71 - CANCELLED—
037[ Installation, maintenance and repair of apparatus and plants for energy generation, energy supply, energy control, energy transmission, energy steering, energy storage and energy distribution; installation, ] maintenance and repair of solar energy plants and solar generator equipment; installation maintenance and repair of solar roofs and solar panels [; construction supervision; construction repair and information ]ACTIVE—
040[ Generation of electricity; generation of renewable energy, in particular solar energy; contract production for third parties of apparatus and plants for energy generation, energy supply, energy control, transmission, energy steering, energy storage and energy distribution; contract manufacturing for third parties of solar roofs and solar panels; contract manufacturing for third parties of solar plants; information on material processing; generation of electric energy ]SECTION 71 - CANCELLED—
042Technical advice for companies relating to the design of solar energy and renewable energy; [ elaboration of technical expertise in relation to solar energy and renewable energy; design of solar energy equipment; ] technical consulting in the field of solar energy and renewable energy [; IT consultancy and creation of data processing programs, both services particularly in connection with sales, production, installation and maintenance of solar plants, solar thermal plants, photovoltaic plants and photovoltaic modules; updating of software ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 27, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 27, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 27, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 14, 2022INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Mar 28, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 28, 2021NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jul 28, 202171AGREGISTERED-SEC.71 ACCEPTED—
Jul 22, 2021ES71TEAS SECTION 71 RECEIVED—
Jul 13, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jul 13, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 13, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 13, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 2, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Apr 9, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
Nov 21, 2019CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jan 4, 2019INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Oct 17, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Oct 16, 2018INPCINVALIDATION PROCESSED—
Oct 8, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 22, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Feb 16, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 8, 2018NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Feb 8, 2018C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jan 31, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 22, 2018ES75TEAS SECTION 71 & 15 RECEIVED—
Mar 5, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 16, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 16, 2012FIMPFINAL DISPOSITION PROCESSED—
Nov 2, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 2, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 27, 2011GPNXNOTIFICATION PROCESSED BY IB—
May 17, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 17, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 27, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 27, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 12, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 11, 2011ALIEASSIGNED TO LIE—
Mar 30, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 30, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Mar 30, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 30, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 30, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Mar 22, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 22, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 21, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 21, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 21, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 9, 2010RFNTREFUSAL PROCESSED BY IB—
Sep 21, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 21, 2010RFRRREFUSAL PROCESSED BY MPU—
Sep 21, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 20, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 7, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 3, 2010DOCKASSIGNED TO EXAMINER—
Sep 3, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 2, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance